I want to search for...
Permit #2005090701
Permit Details
Status: COED
| Parcel Id: 07-11-31-7026-00670-0220 |
| GARAGE: 434 sqft |
| OPENED PORCH (WITH ROOF) : 300 sqft |
| OPENED PORCH (WITH ROOF) : 35 sqft |
| CONDITIONED SPACE: 2630 sqft |
| PATIO/DECK (NO ROOF) : 135 sqft |
| Total Square Footage: 3534 sqft |
| Block: 0067 |
| Subdivision: - |
| Job Phone: (386) 445-4515 |
| Location Address: 72 PIN OAK DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/19/2005 |
| NOC: RECORDED |
| Applicant name: GREGORY LEE LE PERA |
| Owner: KENNETH MCCLENEHAN |
| Lot: 220 |
| Contracted Stated Job Value: ¤105,200.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
WAYNE HOMES BY CENTEX
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
385 DOUGLAS AVE ALTAMONTE SPRINGS, FL 32714 |
STE 3000 ALTAMONTE SPRINGS, FL 32714 |
CBC055301 (Exp: 09/30/2008) | (386) 445-4515 | (386)446-6285 |
Sub Contractors
JOHN FREDERICK WANERKA
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
PO BOX 350214 BUNNELL, FL 32135 |
EC0000585 (Exp: 08/31/2022) | 386-446-9626 | 386-445-3131 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 03/20/2006 | FINAL APPROVED | ARITTER |
| STORMWATER FINAL INSPECTION | 03/14/2006 | APPROVED - AS NOTED | BFCHAMBERLAIN |
| Note: 28 s.f. road damage...$324 | |||
| UTILITY COMPANY FINAL | 03/06/2006 | APPROVED | RANDRADE |
| PRE DRIVEWAY | 02/24/2006 | CANCELLED BY INSPECTOR | LAPTEKAR |
| Note: this is an extra inspection...already passed | |||
| PRE DRIVEWAY | 02/23/2006 | APPROVED | DSCHRAGER |
| RESIDENTIAL EARLY POWER | 02/15/2006 | APPROVED | JHINDMAN |
| LATH /BRICK FLASHING | 02/02/2006 | APPROVED | TOUTLAND |
| ALL ROUGH | 01/27/2006 | APPROVED | PGALLMANN |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 01/12/2006 | APPROVED | JMCGOWEN |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 01/11/2006 | Disapproved -FEE REQUIRED | ARITTER |
| Note: THIS IS A REINSPECTION block gables at eves 3 ply truss must be nailed from each side block step trusses where the span exceeds 24" remove all shiners in eves | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 01/06/2006 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: straps missing, beams nailing and bearing not to plan | |||
| LINTEL | 12/02/2005 | APPROVED | JGIBSON |
| MONOLITHIC SLAB INSPECTION/SLAB | 11/17/2005 | APPROVED | JGIBSON |
| FIRST ROUGH PLUMBING INSPECTION | 11/15/2005 | APPROVED - AS NOTED | ARAYMOND |
| Note: NO HEAD PRESSURE- CHECK AT SLAB. | |||
| TEMPORARY POLE | 11/15/2005 | APPROVED | ARAYMOND |
| Note: jackie 1:30 susan fpl 11/16/05 |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 01/18/2006 | 01/19/2006 |
| Note: Released By: LWOODROME Revision: Energy calculations | |||
| BLD | COMPLETE | 10/12/2005 | 10/17/2005 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. | |||
| URB | COMPLETE | 10/11/2005 | 10/12/2005 |
| Note: Released By: CGOEWEY | |||
| ZON | COMPLETE | 10/04/2005 | 10/11/2005 |
| Note: Released By: HHERKERT | |||
| SWMD | COMPLETE | 09/23/2005 | 09/28/2005 |
| Note: Released By: LAPTEKAR | |||
| ZON | HOLD | 09/23/2005 | 10/04/2005 |
| Note: Held By: DCHAUDOIN need to have stormwater check top of bank. it is only 8 feet from back of home |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ENGINEERING ROAD DAMAGE | ¤324.00 | 03/21/2006 |
| EARLY POWER INSPECTION | ¤40.00 | 03/21/2006 |
| REINSPECTION FEE | ¤40.00 | 03/21/2006 |
| REINSPECTION FEE | ¤40.00 | 03/21/2006 |
| REVISION | ¤40.00 | 03/21/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 10/19/2005 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/19/2005 |
| TRANSPORTATION IMPACT FEE3/RES | ¤2,885.00 | 10/19/2005 |
| ADMIN FEE | ¤20.00 | 10/19/2005 |
| ARC HOUSE REVIEW | ¤125.00 | 10/19/2005 |
| BUILDING CODE ADMIN FUND | ¤17.67 | 10/19/2005 |
| ELECTRIC FEE | ¤181.80 | 10/19/2005 |
| FIRE RES IMPACT FEE 4-1-05 | ¤173.47 | 10/19/2005 |
| MECHANICAL FEE | ¤181.80 | 10/19/2005 |
| PERMIT FEE | ¤986.70 | 10/19/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 10/19/2005 |
| PLAN CHECK FEE | ¤101.20 | 10/19/2005 |
| PLUMBING FEE | ¤181.80 | 10/19/2005 |
| RADON FEE | ¤17.67 | 10/19/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,157.02 |