I want to search for...
Permit #2005090749
Permit Details
Status: CANCEL
| Parcel Id: 07-11-31-7013-00090-0510 |
| CONDITIONED SPACE: 2504 sqft |
| GARAGE: 521 sqft |
| OPENED PORCH (WITH ROOF) : 249 sqft |
| OPENED PORCH (WITH ROOF) : 71 sqft |
| Total Square Footage: 3345 sqft |
| Block: 0009 |
| Subdivision: - |
| Job Phone: (386)931-4741 |
| Location Address: 24 BRIDGEHAVEN DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/21/2005 |
| NOC: RECORDED |
| Applicant name: FOSTER H COLEMAN |
| Owner: F & H CONSTRUCTION |
|
Address PO BOX 2573 BUNNELL, FL 32110 |
| Lot: 510 |
| Contracted Stated Job Value: ¤230,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
Fantastic Homes Const.Inc. (Foster Coleman)
| Status | Location Address | State License Number | Phone |
| CANCEL |
132 N PENINSULA DR DAYTONA BEACH, FL 32118 |
CGC003579 (Exp: 08/31/2016) | 386-307-1666 |
Inspection History
| Type | Request Date | Result | Inspector |
| PRE DRIVEWAY | 08/07/2006 | APPROVED | MBRENNAN |
| Note: end boxes to low need to be above height of culvert pipe end cuts.....culvert pipe is level needs to have some angle so water con flow .....cut road edge at 90* not 45* | |||
| INSULATION INSPECTION | 04/21/2006 | APPROVED | JLEVRAULT |
| ALL ROUGH | 04/17/2006 | APPROVED - AS NOTED | MMOORE |
| Note: THIS IS A REINSPECTION 1. 4x4 posts not anchored outside garage/ they can be moved 2. tighten all-thread bolts throughout house 3. finish bi insulation 4. all-rough passes as noted above | |||
| ALL ROUGH | 04/13/2006 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: PLUMBING NOT READY. BOND JACUZZI MOTOR TO COPPER PIPES. | |||
| LATH /BRICK FLASHING | 03/07/2006 | APPROVED | JLEVRAULT |
| Note: THIS IS A REINSPECTION/ CONT REQUEST JOE LEVRAULT FO INSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 03/06/2006 | CANCELLED BY INSPECTOR | JLEVRAULT |
| LATH /BRICK FLASHING | 03/02/2006 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: NOT READY. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 02/17/2006 | APPROVED | JLEVRAULT |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 02/06/2006 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: HEADER STRAPS DO NOT COMPLY WITH PLAN. CHECK ALL SILL PLATE BOLTING AND SPACING. PROVIDE PROPER ENGINEERING FOR UPLIFTS FOR WOOD FRAMED WALLS. | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 02/06/2006 | CANCELLED BY INSPECTOR | JLEVRAULT |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 02/03/2006 | CANCELLED BY INSPECTOR | JLEVRAULT |
| EXTERIOR WALL SHEATHING/SHEAR WALL | 02/03/2006 | CANCELLED BY INSPECTOR | JLEVRAULT |
| MONOLITHIC SLAB INSPECTION/SLAB | 11/30/2005 | APPROVED | 2005080051 |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 11/29/2005 | Disapproved -FEE REQUIRED | MMOORE |
| Note: NOT COMPLETED/ FOOTERS LOADED WITH SAND | |||
| FIRST ROUGH PLUMBING INSPECTION | 11/23/2005 | APPROVED | JLEVRAULT |
| LINTEL | |||
| STORMWATER FINAL INSPECTION | |||
| UTILITY COMPANY FINAL | |||
| FINAL COMPLETE BUILDING INSPECTION |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 02/01/2006 | 02/02/2006 |
| Note: Released By: LWOODROME Revision: Post, beams and connectors | |||
| BLD | COMPLETE | 10/06/2005 | 10/14/2005 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. | |||
| ZON | COMPLETE | 10/04/2005 | 10/06/2005 |
| Note: Released By: BWRY | |||
| SWMD | COMPLETE | 09/26/2005 | 09/27/2005 |
| Note: Released By: LAPTEKAR | |||
| ZON | HOLD | 09/26/2005 | 10/04/2005 |
| Note: Held By: BWRY SITE PLAN DOES NOT MATCH FLOOR PLAN - SUMMER KITCHEN MUST BE SHOWN ON SITE PLAN. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN FEE | ¤20.00 | 11/21/2005 |
| ARC HOUSE REVIEW | ¤125.00 | 11/21/2005 |
| BUILDING CODE ADMIN FUND | ¤16.73 | 11/21/2005 |
| ELECTRIC FEE | ¤168.00 | 11/21/2005 |
| FIRE RES IMPACT FEE 4-1-05 | ¤173.47 | 11/21/2005 |
| MECHANICAL FEE | ¤168.00 | 11/21/2005 |
| PERMIT FEE | ¤897.00 | 11/21/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 11/21/2005 |
| PLAN CHECK FEE | ¤92.00 | 11/21/2005 |
| PLUMBING FEE | ¤168.00 | 11/21/2005 |
| RADON FEE | ¤16.73 | 11/21/2005 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 11/21/2005 |
| STORM WATER PERMIT FEES | ¤80.00 | 11/21/2005 |
| TRANSPORTATION IMPACT FEE3/RES | ¤2,885.00 | 11/21/2005 |
| REINSPECTION FEE | ¤40.00 | |
| REINSPECTION FEE | ¤40.00 | |
| REINSPECTION FEE | ¤40.00 | |
| REINSPECTION FEE | ¤40.00 | |
| REINSPECTION FEE | ¤40.00 | |
| REVISION | ¤40.00 | |
| Fees | Total Due: ¤240.00 | Total Paid: ¤9,530.84 |