I want to search for...
Permit #2005090825
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-00580-0060 |
| CONDITIONED SPACE: 1888 sqft |
| GARAGE: 632 sqft |
| OPENED PORCH (WITH ROOF) : 324 sqft |
| OPENED PORCH (WITH ROOF) : 43 sqft |
| Total Square Footage: 2887 sqft |
| Block: 0058 |
| Subdivision: - |
| Job Phone: (386) 445-5239 |
| Location Address: 14 ELLINGTON DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/08/2006 |
| NOC: RECORDED |
| Applicant name: KEITH M PARKER |
| Owner: RICHARD W GAWRONSKI |
|
Address KATHLEEN GAWRONSKI MALNALAPAN, NJ 07726 |
| Lot: 060 |
| Contracted Stated Job Value: ¤158,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
DILLARD CONSTRUCTION LLC.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
PO BOX 355007 PALM COAST, FL 32137 |
CGC1510399 (Exp: 09/30/2010) | 386-864-1320 | (386)986-3054 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 11/01/2006 | FINAL APPROVED | DROCKWELL |
| STORMWATER FINAL INSPECTION | 10/30/2006 | APPROVED - AS NOTED | GLALIMA |
| Note: DRAINAGE ISSUE IS ALL SET TO SURVEY , READY FOR FINAL . 30 ' FEET OF ROAD DAMAGE = 340.00 | |||
| STORMWATER FINAL INSPECTION | 10/27/2006 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: Right side at pep tank and left at pool needs regrading to improve the drainage to the front swale. | |||
| UTILITY COMPANY FINAL | 10/25/2006 | APPROVED | MBACON |
| DRIVEWAY | 09/15/2006 | APPROVED - AS NOTED | GLALIMA |
| Note: NO BOX | |||
| INSULATION INSPECTION | 06/06/2006 | APPROVED - AS NOTED | JGIBSON |
| Note: AT FINAL CHECK GFIC. IN MASTER BATH BY TOILET!!!!!!!!!!!!!! | |||
| ALL ROUGH | 06/01/2006 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| LATH /BRICK FLASHING | 06/01/2006 | APPROVED | DROCKWELL |
| ALL ROUGH | 05/30/2006 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: No water pressure. GFCI for spa must be on its own circuit. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 04/04/2006 | APPROVED | JGIBSON |
| LINTEL | 03/17/2006 | APPROVED | JGIBSON |
| MONOLITHIC SLAB INSPECTION/SLAB | 03/09/2006 | APPROVED | PGALLMANN |
| FIRST ROUGH PLUMBING INSPECTION | 03/07/2006 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 10/12/2005 | 10/18/2005 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. | |||
| ZON | COMPLETE | 10/05/2005 | 10/12/2005 |
| Note: Released By: HHERKERT | |||
| SW1 | COMPLETE | 10/03/2005 | 10/03/2005 |
| Note: Released By: WKINELL | |||
| ZON | HOLD | 09/28/2005 | 10/05/2005 |
| Note: Held By: DCHAUDOIN PLANS DO NOT HAVE ENTRY TABULATIONS. SEALED SURVEY MUST SHOW LOT AREA. COLOR AND MATERIAL SHEET REQUIRED SHOWING COLORS OF HOUSE. 10/5/2005 SUBMITTED COLOR AND MATERIAL SHEET. DAMARIS |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ENGINEERING ROAD DAMAGE | ¤340.00 | 11/01/2006 |
| REINSPECTION FEE | ¤40.00 | 11/01/2006 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 11/01/2006 |
| TRANSPORTATION IMPACT FEE3/RES | ¤2,885.00 | 02/08/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 02/08/2006 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/08/2006 |
| ADMIN FEE | ¤20.00 | 02/08/2006 |
| ARC HOUSE REVIEW | ¤125.00 | 02/08/2006 |
| BUILDING CODE ADMIN FUND | ¤14.44 | 02/08/2006 |
| ELECTRIC FEE | ¤125.40 | 02/08/2006 |
| FIRE RES IMPACT FEE 4-1-05 | ¤173.47 | 02/08/2006 |
| MECHANICAL FEE | ¤125.40 | 02/08/2006 |
| PERMIT FEE | ¤620.10 | 02/08/2006 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 02/08/2006 |
| PLAN CHECK FEE | ¤63.60 | 02/08/2006 |
| PLUMBING FEE | ¤125.40 | 02/08/2006 |
| RADON FEE | ¤14.44 | 02/08/2006 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,508.16 |