I want to search for...

Permit #2005090871

Permit Details

Status: COED

Parcel Id: 07-11-31-7028-00700-0080
CONDITIONED SPACE: 2154 sqft
GARAGE: 442 sqft
OPENED PORCH (WITH ROOF) : 162 sqft
OPENED PORCH (WITH ROOF) : 62 sqft
PATIO/DECK (NO ROOF) : 154 sqft
Total Square Footage: 2974 sqft
Block: 0070
Subdivision: -
Job Phone: (386)437-5782
Location Address: 1 POINCE PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/31/2006
NOC: RECORDED
Applicant name: SANDRA LEE FRENCH
Owner: LEATHAN, MICHELLE & MICHAEL J. WEIDL

Address

55 POINT OF WOODS DRIVE

PALM COAST, FL 32164

Lot: 080
Contracted Stated Job Value: ¤150,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SANDEX HOMES
Status Location Address State License Number Phone Fax
CANCEL

27 EGAN DR

PALM COAST, FL

CRC1327302 (Exp: 09/30/2008) (386)437-5782 (386)437-5782

Inspection History

Type Request Date Result Inspector
FINAL COMPLETE BUILDING INSPECTION 10/17/2006 FINAL APPROVED JMCGOWEN
Note: THIS IS A REINSPECTION
STORMWATER FINAL INSPECTION 10/16/2006 CANCELLED BY APPLICANT KJOHNSON
Note: road damage inspection only. Sandra french called back to cancel.
FINAL COMPLETE BUILDING INSPECTION 10/13/2006 Disapproved -FEE REQUIRED JMCGOWEN
Note: NEED TO HAVE ALL SWITCHES IN MASTER BEDROOM ON ARC FAULT BREAKERS. NEED TO HAVE SHADE TREES AND UNDERSTORY TREES.
STORMWATER FINAL INSPECTION 10/11/2006 APPROVED - AS NOTED GLALIMA
Note: 24 ' FEET OF ROAD DAMAGE = 292. 00 / SEE LAST REPORT . IF THE BUILDER DID NOT LIKE THE 24' FEET OF ROAD DAMAGE , THEN THE NEXT TIME BEFOR HOUSE , START ON A CORNER LOT THEY SHOULD HAVE A PRE, ROAD INSPICTION . THANK YOU GARY LALIMA .
STORMWATER FINAL INSPECTION 10/11/2006 Disapproved -FEE REQUIRED GLALIMA
Note: SWEEP ALL OF ROAD SO I CAN ASSESS ALL OF ROAD AND BE FAIR . RUN SPRINKLER 2 HOURS BEFOR NEXT INSPECTION AND HAVE WATER RUNNING .
RESIDENTIAL EARLY POWER 10/06/2006 APPROVED ACOOPER
UTILITY COMPANY FINAL 10/04/2006 APPROVED MBACON
DRIVEWAY 09/11/2006 APPROVED DRANDALL
LATH /BRICK FLASHING 07/07/2006 APPROVED RMARVEL
INSULATION INSPECTION 06/26/2006 APPROVED ARITTER
ALL ROUGH 06/21/2006 APPROVED ARITTER
Note: THIS IS A REINSPECTION
ALL ROUGH 06/19/2006 Disapproved -FEE REQUIRED ARITTER
Note: ventfan ducts incomplete, need to locate switch for garden tub
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 05/05/2006 APPROVED JGIBSON
Note: THIS IS A REINSPECTION
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 05/03/2006 Disapproved -FEE REQUIRED ARITTER
Note: X brace gables per details d-3. block back ridges. block step trusses that exceed 24in. on center.
LINTEL 03/21/2006 APPROVED TOUTLAND
Note: THIS IS A REINSPECTION
LINTEL 03/20/2006 Disapproved -FEE REQUIRED TOUTLAND
Note: THIS IS A REINSPECTION cut out lintel block at vent stacks
LINTEL 02/22/2006 Disapproved -FEE REQUIRED PGALLMANN
Note: Placement of lintel steel is (presently lying on the bottom). See D3 details A,B,C.
MONOLITHIC SLAB INSPECTION/SLAB 02/08/2006 APPROVED ARAYMOND
Note: THIS IS A REINSPECTION
MONOLITHIC SLAB INSPECTION/SLAB 02/03/2006 CANCELLED BY APPLICANT TOUTLAND
FIRST ROUGH PLUMBING INSPECTION 02/01/2006 APPROVED ARAYMOND

Review History

Department Status Date In Date Out
BLD COMPLETE 04/26/2006 04/27/2006
Note: Released By: LWOODROME Revision: Truss repair
BLD COMPLETE 03/14/2006 03/17/2006
Note: Released By: CCOTE Approved for Release.
BLD COMPLETE 12/20/2005 12/22/2005
Note: Released By: LWOODROME Revision: Truss connector schedule
BLD COMPLETE 10/19/2005 10/19/2005
Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Fred R>
URB COMPLETE 10/14/2005 10/19/2005
Note: Released By: CGOEWEY
ZON HOLD 10/07/2005 10/12/2005
Note: Held By: HHERKERT does not meet front/side setback of 25'.
ZON HOLD 09/29/2005 10/07/2005
Note: Held By: BWRY NEED TO SHOW WHAT TREES ARE GEING SAVED AND WHICH ONES ARE NOT. MUST HAVE 4 TREES SHOWN ON LOT. ALSO NEED FOUNDATION PLANTING ON POINT OF WOODS DRIVE SIDE OF HOUSE.
SW1 COMPLETE 09/29/2005 10/03/2005
Note: Released By: LAPTEKAR
ZON COMPLETE 10/14/2005
Note: Released By: HHERKERT

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
EARLY POWER INSPECTION ¤40.00 10/18/2006
REINSPECTION FEE ¤40.00 10/18/2006
REINSPECTION FEE ¤40.00 10/18/2006
REINSPECTION FEE ¤40.00 10/18/2006
REINSPECTION FEE ¤40.00 10/18/2006
REINSPECTION FEE ¤40.00 10/18/2006
REVISION ¤40.00 10/18/2006
REVISION ¤40.00 10/18/2006
STORMWATER REINSPECTION FEE ¤35.00 10/18/2006
TRANSPORTATION IMPACT FEE3/RES ¤2,885.00 01/31/2006
SCHOOL BOARD IMPACT FEE RES ¤3,600.00 01/31/2006
STORM WATER PERMIT FEES ¤80.00 01/31/2006
REVISION ¤40.00 01/31/2006
ADMIN FEE ¤20.00 01/31/2006
ARC HOUSE REVIEW ¤125.00 01/31/2006
BUILDING CODE ADMIN FUND ¤14.87 01/31/2006
ELECTRIC FEE ¤132.00 01/31/2006
FIRE RES IMPACT FEE 4-1-05 ¤173.47 01/31/2006
MECHANICAL FEE ¤132.00 01/31/2006
PERMIT FEE ¤663.00 01/31/2006
PARKS IMPACT FEE 11-2-04 ¤1,120.91 01/31/2006
PLAN CHECK FEE ¤68.00 01/31/2006
PLUMBING FEE ¤132.00 01/31/2006
RADON FEE ¤14.87 01/31/2006
Fees Total Due: ¤0.00 Total Paid: ¤9,556.12