I want to search for...
Permit #2005100527
Permit Details
Status: COED
| Parcel Id: 07-11-31-7019-00450-0010 |
| CONDITIONED SPACE: 2639 sqft |
| GARAGE: 480 sqft |
| OPENED PORCH (WITH ROOF) : 406 sqft |
| OPENED PORCH (WITH ROOF) : 37 sqft |
| Total Square Footage: 3562 sqft |
| Block: 00450 |
| Subdivision: - |
| Job Phone: (386) 445-4515 |
| Location Address: 12 WILD OAK PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/23/2005 |
| NOC: RECORDED |
| Applicant name: GREGORY LEE LE PERA |
| Owner: FERRUZZI LOUIS P & LYNN E FERRUZZI H&W |
|
Address 12 WILD OAK PLACE PALM COAST, FL 32164 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤126,672.00 |
| Job Description: RESIDENTIAL SINGLE FAMILY |
| Type: CN |
Contractor
WAYNE HOMES BY CENTEX
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
385 DOUGLAS AVE ALTAMONTE SPRINGS, FL 32714 |
STE 3000 ALTAMONTE SPRINGS, FL 32714 |
CBC055301 (Exp: 09/30/2008) | (386) 445-4515 | (386)446-6285 |
Sub Contractors
MICHAEL G MORELLO JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2 HARGROVE GRADE PALM COAST, FL 32137 |
CAC014293 (Exp: 08/31/2014) | (386)447-3950 | (386)446-4614 |
GARY WAYNE EVERS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 740106 ORANGE CITY, FL 32763 |
CFC050566 (Exp: 08/31/2026) | 386-775-0909 | 386-775-0918 |
GREGORY A HAGEMAN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
545 Parque Drive Ormond Beach, FL 32174 |
CCC021394 (Exp: 08/31/2026) | (386) 672-2821 |
JOHN FREDERICK WANERKA
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
PO BOX 350214 BUNNELL, FL 32135 |
EC0000585 (Exp: 08/31/2022) | 386-446-9626 | 386-445-3131 |
GREG RUSSELL
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
P.O. BOX 127 ST. AUGUSTINE, FL 32086 |
18369 (Exp: 08/31/2010) | (386)439-9222 | (386)439-9224 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 07/24/2006 | FINAL APPROVED | ARITTER |
| STORMWATER FINAL INSPECTION | 07/21/2006 | APPROVED - AS NOTED | BFCHAMBERLAIN |
| Note: THIS IS A REINSPECTION 12 s.f. road damage......$148 | |||
| GAS FINAL | 07/20/2006 | APPROVED | PGALLMANN |
| STORMWATER FINAL INSPECTION | 07/14/2006 | Disapproved -FEE REQUIRED | DRANDALL |
| Note: remove dumpster, clean street to assess road damage, clean construction debris from adjasent property, create swale right side to drain around driveway to front swale | |||
| UTILITY COMPANY FINAL | 07/10/2006 | APPROVED | TSCHWEERS |
| RESIDENTIAL EARLY POWER | 06/28/2006 | APPROVED | ARITTER |
| DRIVEWAY | 06/09/2006 | APPROVED | BFCHAMBERLAIN |
| INSULATION INSPECTION | 05/17/2006 | APPROVED | PGALLMANN |
| GAS ROUGH | 05/15/2006 | APPROVED | PGALLMANN |
| ALL ROUGH | 05/10/2006 | APPROVED - AS NOTED | JLEVRAULT |
| Note: METAL JUNCTION BOXES IN GARAGE ARE NOT GROUNDED. NO PRESSURE ON GAS LINE TO FIREPLACE - REQUIRES 15 POUNDS. PERMIT IS REQUIRED FOR GAS LINE BEFORE CALLING IN INSULATION INSPECTION. | |||
| LATH /BRICK FLASHING | 05/04/2006 | APPROVED | PGALLMANN |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 02/15/2006 | APPROVED | ARITTER |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 02/10/2006 | Disapproved -FEE REQUIRED | PGALLMANN |
| Note: Not ready. Incomplete list follows: 1) Front truss girder B4G (3-ply) is missing several studs under both sides. 2) Same truss is missing uplift strapping (see sheet 6). 3) Same truss is pulling apart, between plys. 4)Trusses B1G; B2; B3 are missing uplift strapping. 5) Bearing wall supporting the above trusses is not bolted or strapped. | |||
| LINTEL | 01/13/2006 | APPROVED | JLEVRAULT |
| MONOLITHIC SLAB INSPECTION/SLAB | 01/03/2006 | APPROVED | MMOORE |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 12/30/2005 | Disapproved -FEE REQUIRED | MMOORE |
| Note: 1. NOT READY FOR INSPECTION...8:30 A.M. | |||
| FIRST ROUGH PLUMBING INSPECTION | 12/22/2005 | APPROVED | JLEVRAULT |
| TEMPORARY POLE | 12/22/2005 | APPROVED | JLEVRAULT |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 06/01/2006 | 06/06/2006 |
| Note: Released By: LWOODROME Revision: Lintel and down cell at picture window | |||
| BLD | COMPLETE | 05/11/2006 | 05/12/2006 |
| Note: Released By: LWOODROME Revision: Gas piping | |||
| BLD | COMPLETE | 04/11/2006 | 04/18/2006 |
| Note: Released By: LWOODROME Revision: Gas fireplace | |||
| BLD | COMPLETE | 11/21/2005 | 11/21/2005 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. | |||
| BLD | COMPLETE | 11/15/2005 | 11/17/2005 |
| Note: Released By: JGONZALEZ Held By: CCOTE Revised drawings addressing the following items must be submitted in order to complete the Building Permit Application plan review. 1. The Energy Packets submitted are outdated forms. Resubmit new 600A-2004 forms, Energy Gauge v.4.0. | |||
| DSD | COMPLETE | 10/25/2005 | 11/15/2005 |
| Note: Released By: KIANNOTTI | |||
| SW1 | COMPLETE | 10/24/2005 | 10/31/2005 |
| Note: Released By: JGONZALEZ Held By: LAPTEKAR Need driveway width on site plan at the road on the main driveway and the width of the driveway at the property line on the circular driveway on the site plan.. must meet city minimum of 10 feet at the property line and 16' at the road. | |||
| ZON | COMPLETE | 10/24/2005 | 10/25/2005 |
| Note: Released By: JGONZALEZ Held By: HHERKERT binding lot agreement required emailed and faxed 10-25-05, 1:25pm, hh | |||
| ZON | COMPLETE | 10/25/2005 | |
| Note: Released By: HHERKERT | |||
| SW1 | COMPLETE | 11/01/2005 | |
| Note: Released By: LAPTEKAR Recieved new site plan with measurements. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ENGINEERING ROAD DAMAGE | ¤148.00 | 07/25/2006 |
| EARLY POWER INSPECTION | ¤40.00 | 07/25/2006 |
| REINSPECTION FEE | ¤40.00 | 07/25/2006 |
| REINSPECTION FEE | ¤40.00 | 07/25/2006 |
| REVISION | ¤40.00 | 07/25/2006 |
| REVISION | ¤40.00 | 07/25/2006 |
| REVISION | ¤40.00 | 07/25/2006 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 07/25/2006 |
| TRANS IMPACT FEE 4 - PER UNIT | ¤3,248.51 | 11/23/2005 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 11/23/2005 |
| STORM WATER PERMIT FEES | ¤80.00 | 11/23/2005 |
| ADMIN FEE | ¤20.00 | 11/23/2005 |
| ARC HOUSE REVIEW | ¤125.00 | 11/23/2005 |
| BUILDING CODE ADMIN FUND | ¤17.81 | 11/23/2005 |
| ELECTRIC FEE | ¤183.60 | 11/23/2005 |
| FIRE RES IMPACT FEE 4-1-05 | ¤173.47 | 11/23/2005 |
| MECHANICAL FEE | ¤183.60 | 11/23/2005 |
| PERMIT FEE | ¤998.40 | 11/23/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 11/23/2005 |
| PLAN CHECK FEE | ¤102.40 | 11/23/2005 |
| PLUMBING FEE | ¤183.60 | 11/23/2005 |
| RADON FEE | ¤17.81 | 11/23/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,478.11 |