I want to search for...

Permit #2005100772

Permit Details

Status: COED

Parcel Id: 07-11-31-7064-00040-0040
CONDITIONED SPACE: 3828 sqft
GARAGE: 552 sqft
OPENED PORCH (WITH ROOF) : 142 sqft
OPENED PORCH (WITH ROOF) : 270 sqft
OPENED PORCH (WITH ROOF) : 201 sqft
Total Square Footage: 4993 sqft
Block: 0004
Subdivision: -
Job Phone: (386)931-4741
Location Address: 15 LLOVERA PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/30/2005
NOC: RECORDED
Applicant name: FOSTER H COLEMAN
Owner: WEHDE, MIKE & HOLLY

Address

111 TISPAQUIN STREET

MIDDLEBORO, MA 02346

Lot: 040
Contracted Stated Job Value: ¤260,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

Fantastic Homes Const.Inc. (Foster Coleman)
Status Location Address State License Number Phone
CANCEL

132 N PENINSULA DR

DAYTONA BEACH, FL 32118

CGC003579 (Exp: 08/31/2016) 386-307-1666

Sub Contractors

ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853
MARTIN JOHN EVANS
Status Location Address State License Number
ACTIVE

14 FORT CAROLINE CT

BUNNELL, FL 32110

CFC057676 (Exp: 08/31/2026)
WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068

Inspection History

Type Request Date Result Inspector
FINAL COMPLETE BUILDING INSPECTION 11/15/2006 FINAL APPROVED DROCKWELL
STORMWATER FINAL INSPECTION 11/13/2006 APPROVED GLALIMA
Note: THIS IS A REINSPECTION 0 road damage
UTILITY COMPANY FINAL 11/09/2006 APPROVED MBACON
STORMWATER FINAL INSPECTION 11/08/2006 Disapproved -FEE REQUIRED GLALIMA
Note: Place sod in swale across the street Sweep road so road damage can be assessed Remove fill from left adjacent lot and pick up trash across the street
RESIDENTIAL EARLY POWER 09/08/2006 APPROVED DROCKWELL
DRIVEWAY 08/07/2006 APPROVED - AS NOTED BFCHAMBERLAIN
Note: Builder will submit revised driveway plans as formed.
LATH /BRICK FLASHING 05/18/2006 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
LATH /BRICK FLASHING 05/15/2006 Disapproved -FEE REQUIRED JHINDMAN
Note: paper on wall does not lap over holes at top of masonry
INSULATION INSPECTION 04/17/2006 APPROVED CMINI
ALL ROUGH 03/30/2006 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
ALL ROUGH 03/27/2006 Disapproved -FEE REQUIRED DROCKWELL
Note: Wires at panel to be protected/Elec.box at interior garage door overloaded/Firestopping not complete-down bath/Conduit not recessed kitchen/Fasten window at arch/A/C not complete up air handler/No test pressure on water lines/Repair down cell.
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 03/01/2006 APPROVED JGIBSON
EXTERIOR WALL SHEATHING/SHEAR WALL 02/28/2006 APPROVED - AS NOTED JGIBSON
Note: Upstairs only was inspected.
LINTEL 01/20/2006 APPROVED DROCKWELL
MONOLITHIC SLAB INSPECTION/SLAB 01/05/2006 APPROVED DROCKWELL
FIRST ROUGH PLUMBING INSPECTION 01/03/2006 APPROVED JMCGOWEN

Review History

Department Status Date In Date Out
BLD COMPLETE 12/07/2005 12/07/2005
Note: Released By: CCOTE Approved for Release per plan cover sheet.
BLD HOLD 11/10/2005 11/15/2005
Note: Held By: CCOTE Revised drawings addressing the following items must be submitted in order to complete the Building Permit Application plan review. 1. Indicate on drawings what type of door is to be used for door from garage to house. Reference FRC 2004 Section R309.1. 2. Indicate on the drawing the construction methods to be used to meet the required separation of garage from house and attic. Reference FRC Section R309.2. 3. Indicate how attic access will be constructed to comply with FRC Section R309.2. 4. Provide detail as to how mechanical unit and ductwork will be constructed to comply with FRC Section 309.1.1. 5. The Energy Packets submitted are outdated forms. Resubmit new 600A-2004 forms, Energy Gauge v.4.0. 6. Beam 1 concerns: a. Provide connectors to be used to secure beam to wall/posts. b. Identify if posts/wall supporting beams will be anchored to foundation. 7. Beam 2 concerns: a. Provide connectors to be used to secure beam to wall/posts. b. Identify if posts/wall supporting beams will be anchored to foundation. 8. Beam 3 concerns: a. Provide connectors to be used to secure beam to wall/posts. b. Identify if posts/wall supporting beams will be anchored to foundation. 9. Beam 4 concerns: a. Beam design sheet indicates stud wall bearing on both ends and drawings show wall construction as masonry. b. Beam design sheets indicate that there is not uplift. Please provide information as to how uplift loads from roof trusses above are transferred down to foundation. c. Provide information as to how 2nd floor wood framed walls are secured to beam. 10. Beam sheets must be signed and sealed by an engineer; or beam designations must be included on signed and sealed truss summary sheet; or beam sizes must be included on a signed and sealed drawing.
ZON COMPLETE 11/09/2005 11/10/2005
Note: Released By: DCHAUDOIN
SW1 HOLD 10/31/2005 11/07/2005
Note: Held By: LAPTEKAR Right of way application not signed.
ZON HOLD 10/31/2005 11/07/2005
Note: Held By: HHERKERT Landscape plan and tree survey is required.
SW1 COMPLETE 11/08/2005
Note: Released By: LAPTEKAR ROW application signed

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
EARLY POWER INSPECTION ¤40.00 12/08/2006
REINSPECTION FEE ¤40.00 12/08/2006
REINSPECTION FEE ¤40.00 12/08/2006
STORMWATER REINSPECTION FEE ¤35.00 12/08/2006
TRANS IMPACT FEE 4 - PER UNIT ¤3,248.51 12/30/2005
SCHOOL BOARD IMPACT FEE RES ¤3,600.00 12/30/2005
STORM WATER PERMIT FEES ¤80.00 12/30/2005
ADMIN FEE ¤20.00 12/30/2005
ARC HOUSE REVIEW ¤125.00 12/30/2005
BUILDING CODE ADMIN FUND ¤24.97 12/30/2005
ELECTRIC FEE ¤247.80 12/30/2005
FIRE RES IMPACT FEE 4-1-05 ¤173.47 12/30/2005
MECHANICAL FEE ¤247.80 12/30/2005
PERMIT FEE ¤1,415.70 12/30/2005
PARKS IMPACT FEE 11-2-04 ¤1,120.91 12/30/2005
PLAN CHECK FEE ¤145.20 12/30/2005
PLUMBING FEE ¤247.80 12/30/2005
RADON FEE ¤24.97 12/30/2005
Fees Total Due: ¤0.00 Total Paid: ¤10,877.13