I want to search for...
Permit #2005110603
Permit Details
Status: COED
| Parcel Id: 07-11-31-7011-00070-0210 |
| CONDITIONED SPACE: 3301 sqft |
| GARAGE: 574 sqft |
| OPENED PORCH (WITH ROOF) : 104 sqft |
| OPENED PORCH (WITH ROOF) : 96 sqft |
| Total Square Footage: 4075 sqft |
| Block: 0007 |
| Subdivision: - |
| Job Phone: (904)363-7626 |
| Location Address: 76 BEACHWAY DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/30/2005 |
| NOC: RECORDED |
| Owner: WEEKLEY HOMES LP |
|
Address 1111 N. POST OAK ROAD HOUSTON, TX 77055 |
| Lot: 210 |
| Contracted Stated Job Value: ¤18,000.00 |
| Job Description: SINGLE RESIDENSE |
| Type: CN |
Contractor
WEEKLEY HOMES,L.P.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
448 VICTORIA HILLS DRIVE DELAND, FL 32724 |
CBC053082 (Exp: 08/31/2012) | (386)775-7206 | (386)775-1709 |
Sub Contractors
TYRENE SCOTT
| Status | Location Address | State License Number |
| CANCEL |
9556 HISTORIC KINGS RD ST #306 JACKSONVILLE, FL 32206 |
CAC035526 (Exp: 09/30/2008) |
GARY WAYNE EVERS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 740106 ORANGE CITY, FL 32763 |
CFC050566 (Exp: 08/31/2026) | 386-775-0909 | 386-775-0918 |
JEFFREY LUIS CARRASCO
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
665 W. COUNTY ROAD 2006 BUNNELL, FL 32110 |
CCC1325557 (Exp: 08/31/2010) | 904-674-4730 | 904-268-0471 |
CHRISTIAN MASARIK
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
6321 GOMEZ ROAD ST. AUGUSTINE, FL 32084 |
EC13001175 (Exp: 08/31/2010) | (904)829-2700 | (904)829-2751 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 06/01/2006 | FINAL APPROVED | PGALLMANN |
| Note: THIS IS A REINSPECTION | |||
| FINAL COMPLETE BUILDING INSPECTION | 05/30/2006 | Disapproved -FEE REQUIRED | ARITTER |
| Note: THIS IS A REINSPECTION item one on noticed dated 5-24-06 incomplete "overcurrent protection" | |||
| FINAL COMPLETE BUILDING INSPECTION | 05/24/2006 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: MAXIMUM OVERCURRENT PROTECTION FOR CONDENSING UNIT IS 50 AMPS - A 60 AMP BREAKER IS INSTALLED, INSTALL CLAMPS WITHIN 12' OF CONDENSING UNIT DISCONNECTS. NO WATER HAMMER ARRESTOR FOR DISHWASHER. | |||
| RESIDENTIAL EARLY POWER | 05/18/2006 | APPROVED | RMARVEL |
| UTILITY COMPANY FINAL | 05/16/2006 | APPROVED | RANDRADE |
| STORMWATER FINAL INSPECTION | 05/15/2006 | APPROVED | BFCHAMBERLAIN |
| Note: THIS IS A REINSPECTION | |||
| STORMWATER FINAL INSPECTION | 05/09/2006 | Disapproved -FEE REQUIRED | BFCHAMBERLAIN |
| Note: Seed and straw along right and rear prop lines; stabilize exposed earth on bank at right front prop line. | |||
| PRE DRIVEWAY | 03/23/2006 | APPROVED | BFCHAMBERLAIN |
| Note: THIS IS A REINSPECTION | |||
| PRE DRIVEWAY | 03/20/2006 | Disapproved -FEE REQUIRED | BFCHAMBERLAIN |
| Note: NO REBAR/ | |||
| LATH /BRICK FLASHING | 03/08/2006 | APPROVED | PGALLMANN |
| INSULATION INSPECTION | 02/24/2006 | APPROVED | MMOORE |
| Note: THIS IS A REINSPECTION | |||
| INSULATION INSPECTION | 02/23/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: THIS IS A REINSPECTION 1. NOT COMPLETED 2ND FLOOR | |||
| INSULATION INSPECTION | 02/22/2006 | CANCELLED BY APPLICANT | MMOORE |
| ALL ROUGH | 02/20/2006 | APPROVED | MMOORE |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 02/17/2006 | CANCELLED BY APPLICANT | MMOORE |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 02/10/2006 | APPROVED | JLEVRAULT |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 02/09/2006 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: THIS IS A REINSPECTION RODS STILL COMING LOOSE. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 02/08/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: 1. THREADED DOWN-ROD HOLES NOT CLEANED OUT ACCORDING TO SUPERINTENDENT AS REQUIRED IN THE DIRECTIONS ON THE TUBES OF EPOXY USED FOR ANCHORING THE BOTTOMS OF ALL-THREADS./ RODS PULLING OUT OF HOLES. 2. GROUT TRUSSES NOT FULL BEARING 3. SUPERINTENDENT TOLD ME HE DID NOT CLEAN-OUT HOLES AND EPOXY TUBES SPECIFY CLEANING-OUT OF HOLES/ DOWN-RODS NOT EPOXEED INTO "CLEANED-OUT" HOLES. 4. THERE IS FAILURE OF RODS AT VARIOUS AREAS. | |||
| LINTEL | 01/19/2006 | APPROVED | MMOORE |
| FOUNDATION SURVEY APPROVED BY STORMWATER | 01/18/2006 | APPROVED | MBRENNAN |
| MONOLITHIC SLAB INSPECTION/SLAB | 01/11/2006 | APPROVED | MMOORE |
| MONOLITHIC SLAB INSPECTION/SLAB | 01/10/2006 | CANCELLED BY APPLICANT | ARAYMOND |
| FIRST ROUGH PLUMBING INSPECTION | 01/09/2006 | APPROVED | MMOORE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 12/19/2005 | 12/21/2005 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. | |||
| BLD | HOLD | 12/02/2005 | 12/05/2005 |
| Note: Held By: CCOTE The following items must be submitted in order to complete the Building Permit Application plan review. 1. The beam sheets submitted must be signed and sealed by an architect or engineer or 2. The beam sizes must be included on a signed and sealed drawing or 8-1/2 x 11 sheet. | |||
| ZON | COMPLETE | 12/02/2005 | 12/02/2005 |
| Note: Released By: HHERKERT | |||
| SW1 | HOLD | 11/28/2005 | 12/12/2005 |
| Note: Held By: LAPTEKAR Need two sealed topographic surveys using 1988NAVD with a benchmark that is not a cap in the road and a lot grading plan that has proposed elevations next to the existing elevations on the topo. | |||
| ZON | HOLD | 11/28/2005 | 11/30/2005 |
| Note: Held By: HHERKERT hold for ARC meeting 12-2-05 | |||
| SW1 | COMPLETE | 12/30/2005 | |
| Note: Released By: LAPTEKAR |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | ¤40.00 | 06/05/2006 |
| REINSPECTION FEE | ¤40.00 | 06/05/2006 |
| REINSPECTION FEE | ¤40.00 | 06/05/2006 |
| REINSPECTION FEE | ¤40.00 | 06/05/2006 |
| REINSPECTION FEE | ¤40.00 | 06/05/2006 |
| REINSPECTION FEE | ¤40.00 | 06/05/2006 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 06/05/2006 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 06/05/2006 |
| TRANS IMPACT FEE 4 - PER UNIT | ¤3,248.51 | 12/30/2005 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 12/30/2005 |
| STORM WATER PERMIT FEES | ¤80.00 | 12/30/2005 |
| ADMIN FEE | ¤20.00 | 12/30/2005 |
| ARC HOUSE REVIEW | ¤125.00 | 12/30/2005 |
| BUILDING CODE ADMIN FUND | ¤20.38 | 12/30/2005 |
| ELECTRIC FEE | ¤216.60 | 12/30/2005 |
| FIRE RES IMPACT FEE 4-1-05 | ¤173.47 | 12/30/2005 |
| MECHANICAL FEE | ¤216.60 | 12/30/2005 |
| PERMIT FEE | ¤1,212.90 | 12/30/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 12/30/2005 |
| PLAN CHECK FEE | ¤124.40 | 12/30/2005 |
| PLUMBING FEE | ¤216.60 | 12/30/2005 |
| RADON FEE | ¤20.38 | 12/30/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,705.75 |