Permit #2005120249

Permit Details

Status: COED

Parcel Id: 07-11-31-7034-00880-0270
CONDITIONED SPACE: 2204 sqft
GARAGE: 421 sqft
OPENED PORCH (WITH ROOF) : 345 sqft
OPENED PORCH (WITH ROOF) : 57 sqft
Block: 0088
Subdivision: -
Job Phone: (904)363-7626
Location Address: 32 ETHAN ALLEN DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/30/2005
NOC: RECORDED
Owner: WEEKLEY HOMES
Lot: 270
Contracted Stated Job Value: ¤185,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

WEEKLEY HOMES,L.P.
Status Location Address State License Number Phone Fax
CANCEL

448 VICTORIA HILLS DRIVE

DELAND, FL 32724

CBC053082 (Exp: 08/31/2012) (386)775-7206 (386)775-1709

Sub Contractors

TYRENE SCOTT
Status Location Address State License Number
CANCEL

9556 HISTORIC KINGS RD ST #306

JACKSONVILLE, FL 32206

CAC035526 (Exp: 09/30/2008)
GARY WAYNE EVERS
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 740106

ORANGE CITY, FL 32763

CFC050566 (Exp: 08/31/2026) 386-775-0909 386-775-0918
JEFFREY LUIS CARRASCO
Status Location Address State License Number Phone Fax
CANCEL

665 W. COUNTY ROAD 2006

BUNNELL, FL 32110

CCC1325557 (Exp: 08/31/2010) 904-674-4730 904-268-0471
CHRISTIAN MASARIK
Status Location Address State License Number Phone Fax
CANCEL

6321 GOMEZ ROAD

ST. AUGUSTINE, FL 32084

EC13001175 (Exp: 08/31/2010) (904)829-2700 (904)829-2751

Inspection History

Type Request Date Result Inspector
FINAL COMPLETE BUILDING INSPECTION 05/30/2006 FINAL APPROVED JGIBSON
Note: THIS IS A REINSPECTION
FINAL COMPLETE BUILDING INSPECTION 05/23/2006 Disapproved -FEE REQUIRED JGIBSON
Note: Exit ground wire broken at ground rod. Ground rods not 6' apart ( min 6' ). Ceiling in AHU not properly sealed. Need specs on AHU for MOCP.
STORMWATER FINAL INSPECTION 05/19/2006 APPROVED - AS NOTED GLALIMA
Note: THIS IS A REINSPECTION 45 FEET ROAD DAMAGE = 460.00
RESIDENTIAL EARLY POWER 05/17/2006 APPROVED RMARVEL
Note: THIS IS A REINSPECTION
STORMWATER FINAL INSPECTION 05/16/2006 Disapproved -FEE REQUIRED GLALIMA
Note: MAKE MORE DEFINED SWALE COMMING TO FROUNT , ALL WATER GOING ON TO ADJ . LOT RIGHT , REPAIR ROAD DAMAGE 45 FEET. PICK UP WOOD , O S B AND ALL OTHER TRASH / TREE LIMBS , LEFT . PLACE SOD IN SWALE LEFT , NO STRAW, 3 X 20 ' SWALE . LINE ON GROUND , PINK PAINT.
RESIDENTIAL EARLY POWER 05/09/2006 Disapproved -FEE REQUIRED DROCKWELL
Note: Kitchen wiring not complete
UTILITY COMPANY FINAL 05/01/2006 APPROVED RANDRADE
DRIVEWAY 04/05/2006 APPROVED GLALIMA
INSULATION INSPECTION 03/21/2006 APPROVED PGALLMANN
LATH /BRICK FLASHING 03/20/2006 APPROVED JGIBSON
ALL ROUGH 03/17/2006 APPROVED JGIBSON
Note: THIS IS A REINSPECTION
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 03/15/2006 APPROVED JGIBSON
Note: THIS IS A REINSPECTION
ALL ROUGH 03/15/2006 CANCELLED BY APPLICANT JGIBSON
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 03/14/2006 Disapproved -FEE REQUIRED JGIBSON
Note: Letter of repair not through city & not repaired per engineering.
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 03/01/2006 CANCELLED BY APPLICANT JGIBSON
Note: THIS IS A REINSPECTION
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 02/24/2006 Disapproved -FEE REQUIRED JGIBSON
Note: Not ready must have letter of repair on A10A, D-1 not straped, jacks not straped, missalined straps, B-8 not to plan, go- bolt not holding in front bearing room, check all engineering.
LINTEL 02/14/2006 APPROVED JGIBSON
Note: THIS IS A REINSPECTION
LINTEL 02/09/2006 Disapproved -FEE REQUIRED JGIBSON
Note: Bond beam steel not tied to vertical steel, vertical steel not tied to dowels.
FOUNDATION SURVEY APPROVED BY STORMWATER 02/08/2006 APPROVED - AS NOTED LAPTEKAR
Note: foundation survey submitted in lieu of elevation certificate
MONOLITHIC SLAB INSPECTION/SLAB 02/01/2006 APPROVED JGIBSON
Note: THIS IS A REINSPECTION
MONOLITHIC SLAB INSPECTION/SLAB 01/30/2006 Disapproved -FEE REQUIRED JGIBSON
Note: Not ready.
FIRST ROUGH PLUMBING INSPECTION 01/27/2006 APPROVED JGIBSON

Review History

Department Status Date In Date Out
BLD CANCEL 03/09/2006
Note: Revision: Truss repair
BLD COMPLETE 12/16/2005 12/27/2005
Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Fred R>
SW1 HOLD 12/08/2005 12/28/2005
Note: Held By: WKINELL Need 3 topo surveys/lot grading plans. Need permanent NAVD88 benchmark.\\wk
ZON COMPLETE 12/08/2005 12/16/2005
Note: Released By: DCHAUDOIN
SW1 COMPLETE 12/30/2005
Note: Released By: LAPTEKAR

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ENGINEERING ROAD DAMAGE ¤460.00 06/07/2006
EARLY POWER INSPECTION ¤40.00 06/07/2006
EARLY POWER INSPECTION ¤40.00 06/07/2006
REINSPECTION FEE ¤40.00 06/07/2006
REINSPECTION FEE ¤40.00 06/07/2006
REINSPECTION FEE ¤40.00 06/07/2006
REINSPECTION FEE ¤40.00 06/07/2006
REINSPECTION FEE ¤40.00 06/07/2006
REINSPECTION FEE ¤40.00 06/07/2006
REVISION ¤40.00 06/07/2006
STORMWATER REINSPECTION FEE ¤35.00 06/07/2006
TRANS IMPACT FEE 4 - PER UNIT ¤3,248.51 12/30/2005
ADMIN FEE ¤20.00 12/30/2005
ARC HOUSE REVIEW ¤125.00 12/30/2005
ELECTRIC FEE ¤141.00 12/30/2005
SCHOOL BOARD IMPACT FEE RES ¤3,600.00 12/30/2005
STORM WATER PERMIT FEES ¤80.00 12/30/2005
FIRE RES IMPACT FEE 4-1-05 ¤173.47 12/30/2005
MECHANICAL FEE ¤141.00 12/30/2005
PERMIT FEE ¤721.50 12/30/2005
PARKS IMPACT FEE 11-2-04 ¤1,120.91 12/30/2005
PLAN CHECK FEE ¤74.00 12/30/2005
PLUMBING FEE ¤141.00 12/30/2005
Fees Total Due: ¤0.00 Total Paid: ¤10,441.39