I want to search for...
Permit #2005120250
Permit Details
Status: COED
| Parcel Id: 07-11-31-7013-00180-0240 |
| CONDITIONED SPACE: 1959 sqft |
| GARAGE: 491 sqft |
| OPENED PORCH (WITH ROOF) : 300 sqft |
| OPENED PORCH (WITH ROOF) : 50 sqft |
| Total Square Footage: 2800 sqft |
| Block: 0018 |
| Subdivision: - |
| Job Phone: (904)363-7626 |
| Location Address: 17 BRUNETT LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/09/2006 |
| NOC: RECORDED |
| Owner: WEEKLY HOMES |
|
Address 4984 PALM COAST PKWY PALM COAST, FL 32164 |
| Lot: 240 |
| Contracted Stated Job Value: ¤180,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
WEEKLEY HOMES,L.P.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
448 VICTORIA HILLS DRIVE DELAND, FL 32724 |
CBC053082 (Exp: 08/31/2012) | (386)775-7206 | (386)775-1709 |
Sub Contractors
TYRENE SCOTT
| Status | Location Address | State License Number |
| CANCEL |
9556 HISTORIC KINGS RD ST #306 JACKSONVILLE, FL 32206 |
CAC035526 (Exp: 09/30/2008) |
GARY WAYNE EVERS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 740106 ORANGE CITY, FL 32763 |
CFC050566 (Exp: 08/31/2026) | 386-775-0909 | 386-775-0918 |
JEFFREY LUIS CARRASCO
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
665 W. COUNTY ROAD 2006 BUNNELL, FL 32110 |
CCC1325557 (Exp: 08/31/2010) | 904-674-4730 | 904-268-0471 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 06/27/2006 | FINAL APPROVED | JLEVRAULT |
| Note: THIS IS A REINSPECTION | |||
| FINAL COMPLETE BUILDING INSPECTION | 06/26/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: THIS IS A REINSPECTION...........2:15 p.m./ 6/26/06 entry and back porch GFCI's will not trip/ no power to outlets | |||
| FINAL COMPLETE BUILDING INSPECTION | 06/23/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: items 3and4 from last list not complete.THIS IS A REINSPECTION | |||
| FINAL COMPLETE BUILDING INSPECTION | 06/22/2006 | CANCELLED BY APPLICANT | JLEVRAULT |
| Note: THIS IS A REINSPECTION | |||
| FINAL COMPLETE BUILDING INSPECTION | 06/21/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: 1. pull-chain broken at garage attic light 2. clean insulation from condensate pan under garage attic hvac unit 3. rear patio gfci will not trip 4. front entry door gfci will not trip | |||
| STORMWATER FINAL INSPECTION | 06/14/2006 | APPROVED - AS NOTED | BFCHAMBERLAIN |
| Note: 44 s.f. road damage........$452 | |||
| RESIDENTIAL EARLY POWER | 05/25/2006 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| UTILITY COMPANY FINAL | 05/19/2006 | APPROVED | TSCHWEERS |
| Note: THIS IS A REINSPECTION | |||
| RESIDENTIAL EARLY POWER | 05/16/2006 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: grounding electrode conductor must be one continuous loop. | |||
| UTILITY COMPANY FINAL | 04/24/2006 | Disapproved - NO FEE | RANDRADE |
| Note: FAILED, DRIVEWAY NOT POURED YET NOR IS THE SOD DOWN | |||
| PRE DRIVEWAY | 04/21/2006 | APPROVED | BFCHAMBERLAIN |
| LATH /BRICK FLASHING | 03/30/2006 | APPROVED | MMOORE |
| INSULATION INSPECTION | 03/21/2006 | APPROVED | JLEVRAULT |
| ALL ROUGH | 03/16/2006 | APPROVED | JLEVRAULT |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 03/01/2006 | CANCELLED BY INSPECTOR | JLEVRAULT |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 02/28/2006 | CANCELLED BY APPLICANT | JLEVRAULT |
| Note: CONTRACTOR REALIZED THAT THE INSPECTION WAS APPROVED AS NOTED AND HE CALLED ME TO CANCEL THE INSPECTION. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 02/21/2006 | APPROVED - AS NOTED | JLEVRAULT |
| Note: FILL CELL AT REAR PORCH AND COLUMN. COMPLETE BY ALL ROUGH. | |||
| LINTEL | 02/09/2006 | APPROVED | JLEVRAULT |
| FOUNDATION SURVEY APPROVED BY STORMWATER | 02/08/2006 | APPROVED - AS NOTED | LAPTEKAR |
| Note: foundation survey submitted in lieu of elevation cert. | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 01/26/2006 | APPROVED | MMOORE |
| FIRST ROUGH PLUMBING INSPECTION | 01/24/2006 | APPROVED | MMOORE |
| Note: THIS IS A REINSPECTION | |||
| FIRST ROUGH PLUMBING INSPECTION | 01/23/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: THIS IS A REINSPECTION NO 5' OF HEAD PRESSURE 9:33 A.M. | |||
| FIRST ROUGH PLUMBING INSPECTION | 01/20/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: no 5' of head pressure |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 12/16/2005 | 12/27/2005 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. | |||
| SW1 | HOLD | 12/08/2005 | 12/28/2005 |
| Note: Held By: WKINELL Need 3 topo surveys/lot grading plans. Need permanent NAVD88 benchmark.\\wk | |||
| ZON | COMPLETE | 12/08/2005 | 12/16/2005 |
| Note: Released By: HHERKERT | |||
| SW1 | COMPLETE | 01/09/2006 | |
| Note: Released By: WKINELL Topos and lot grading plan received.\\wk |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ENGINEERING ROAD DAMAGE | ¤452.00 | 07/10/2006 |
| EARLY POWER INSPECTION | ¤40.00 | 07/10/2006 |
| EARLY POWER INSPECTION | ¤40.00 | 07/10/2006 |
| REINSPECTION FEE | ¤40.00 | 07/10/2006 |
| REINSPECTION FEE | ¤40.00 | 07/10/2006 |
| REINSPECTION FEE | ¤40.00 | 07/10/2006 |
| REINSPECTION FEE | ¤40.00 | 07/10/2006 |
| REINSPECTION FEE | ¤40.00 | 07/10/2006 |
| REINSPECTION FEE | ¤40.00 | 07/10/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 01/09/2006 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/09/2006 |
| TRANS IMPACT FEE 4 - PER UNIT | ¤3,248.51 | 01/09/2006 |
| FIRE RES IMPACT FEE 4-1-05 | ¤173.47 | 01/09/2006 |
| MECHANICAL FEE | ¤148.20 | 01/09/2006 |
| PERMIT FEE | ¤768.30 | 01/09/2006 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 01/09/2006 |
| PLAN CHECK FEE | ¤78.80 | 01/09/2006 |
| PLUMBING FEE | ¤148.20 | 01/09/2006 |
| RADON FEE | ¤14.00 | 01/09/2006 |
| ADMIN FEE | ¤20.00 | 01/09/2006 |
| ARC HOUSE REVIEW | ¤125.00 | 01/09/2006 |
| BUILDING CODE ADMIN FUND | ¤14.00 | 01/09/2006 |
| ELECTRIC FEE | ¤148.20 | 01/09/2006 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,459.59 |