I want to search for...
Permit #2005120252
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-01490-0110 |
| CONDITIONED SPACE: 2830 sqft |
| GARAGE: 574 sqft |
| OPENED PORCH (WITH ROOF) : 104 sqft |
| OPENED PORCH (WITH ROOF) : 96 sqft |
| Total Square Footage: 3604 sqft |
| Block: 0149 |
| Subdivision: - |
| Job Phone: (904)363-7626 |
| Location Address: 21 EDITH POPE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/17/2006 |
| NOC: RECORDED |
| Owner: WEEKLEY HOMES |
| Lot: 110 |
| Contracted Stated Job Value: ¤180,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
WEEKLEY HOMES,L.P.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
448 VICTORIA HILLS DRIVE DELAND, FL 32724 |
CBC053082 (Exp: 08/31/2012) | (386)775-7206 | (386)775-1709 |
Sub Contractors
TYRENE SCOTT
| Status | Location Address | State License Number |
| CANCEL |
9556 HISTORIC KINGS RD ST #306 JACKSONVILLE, FL 32206 |
CAC035526 (Exp: 09/30/2008) |
GARY WAYNE EVERS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 740106 ORANGE CITY, FL 32763 |
CFC050566 (Exp: 08/31/2026) | 386-775-0909 | 386-775-0918 |
JEFFREY LUIS CARRASCO
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
665 W. COUNTY ROAD 2006 BUNNELL, FL 32110 |
CCC1325557 (Exp: 08/31/2010) | 904-674-4730 | 904-268-0471 |
CHRISTIAN MASARIK
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
6321 GOMEZ ROAD ST. AUGUSTINE, FL 32084 |
EC13001175 (Exp: 08/31/2010) | (904)829-2700 | (904)829-2751 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 06/27/2006 | FINAL APPROVED | KSAMPICO |
| STORMWATER FINAL INSPECTION | 06/21/2006 | APPROVED - AS NOTED | GLALIMA |
| Note: THIS IS A REINSPECTION 6 / 22 / 2006 60 ' FEET ROAD DAMAGE = 580.00 | |||
| STORMWATER FINAL INSPECTION | 06/19/2006 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: THIS IS A REINSPECTION 6 / 20 / 06 INSTALL REBAR CULVERT END , REPAIR CONCRETE. 60 s.f. road damage | |||
| STORMWATER FINAL INSPECTION | 06/06/2006 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: THIS IS A REINSPECTION. 6/7/06 - REPAIR CULVERT END LEFT SIDE/REMOVE REBAR FROM INSIDE PIPE/PLACE UNDER CULVERT/ADD CONCRETE/60 FT ROAD DAMAGE | |||
| UTILITY COMPANY FINAL | 06/02/2006 | APPROVED | RANDRADE |
| Note: INSPECTOR WAS MARTY BACON THIS IS A REINSPECTION | |||
| STORMWATER FINAL INSPECTION | 06/01/2006 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: NEED A 4 TO 1 SLOPE IN BACK , REGRADE , THEN SOD , THEN PIN BACK SLOPE , BECAUSE OF WATER WAY . REPAIR CULVERT END LEFT . 60 ' FEET ROAD DAMAGE =580.00 | |||
| DRIVEWAY | 05/15/2006 | APPROVED | GLALIMA |
| Note: THIS IS A REINSPECTION | |||
| DRIVEWAY | 05/11/2006 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: PIPE NOT COVERED 50% | |||
| RESIDENTIAL EARLY POWER | 05/09/2006 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| RESIDENTIAL EARLY POWER | 05/01/2006 | CANCELLED BY APPLICANT | JGIBSON |
| UTILITY COMPANY FINAL | 05/01/2006 | Disapproved - NO FEE | RANDRADE |
| Note: FAILED, NO FINAL GRADE | |||
| INSULATION INSPECTION | 03/21/2006 | APPROVED | PGALLMANN |
| LATH /BRICK FLASHING | 03/20/2006 | APPROVED | JGIBSON |
| ALL ROUGH | 03/20/2006 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 03/17/2006 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: Front entry window not in improper attatchment to all block windows | |||
| ALL ROUGH | 03/15/2006 | CANCELLED BY APPLICANT | JGIBSON |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 03/09/2006 | APPROVED | PGALLMANN |
| LINTEL | 02/17/2006 | APPROVED | DROCKWELL |
| FOUNDATION SURVEY APPROVED BY STORMWATER | 02/16/2006 | APPROVED | WKINELL |
| MONOLITHIC SLAB INSPECTION/SLAB | 02/09/2006 | APPROVED | JGIBSON |
| FIRST ROUGH PLUMBING INSPECTION | 02/07/2006 | APPROVED | PGALLMANN |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 12/16/2005 | 12/27/2005 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Fred R. | |||
| SW1 | HOLD | 12/08/2005 | 12/28/2005 |
| Note: Held By: WKINELL Need 3 topo surveys/lot grading plans. Need permanent NAVD88 benchmark.\\wk | |||
| ZON | COMPLETE | 12/08/2005 | 12/16/2005 |
| Note: Released By: DCHAUDOIN | |||
| SW1 | COMPLETE | 01/17/2006 | |
| Note: Released By: WKINELL topos submitted and reviewed. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ENGINEERING ROAD DAMAGE | ¤580.00 | 06/30/2006 |
| EARLY POWER INSPECTION | ¤40.00 | 06/30/2006 |
| EARLY POWER INSPECTION | ¤40.00 | 06/30/2006 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 06/30/2006 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 06/30/2006 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 06/30/2006 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 06/30/2006 |
| REINSPECTION FEE | ¤40.00 | 06/30/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 01/17/2006 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/17/2006 |
| TRANS IMPACT FEE 4 - PER UNIT | ¤3,248.51 | 01/17/2006 |
| ADMIN FEE | ¤20.00 | 01/17/2006 |
| ARC HOUSE REVIEW | ¤125.00 | 01/17/2006 |
| BUILDING CODE ADMIN FUND | ¤18.02 | 01/17/2006 |
| ELECTRIC FEE | ¤192.60 | 01/17/2006 |
| FIRE RES IMPACT FEE 4-1-05 | ¤173.47 | 01/17/2006 |
| MECHANICAL FEE | ¤192.60 | 01/17/2006 |
| PERMIT FEE | ¤1,056.90 | 01/17/2006 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 01/17/2006 |
| PLAN CHECK FEE | ¤108.40 | 01/17/2006 |
| PLUMBING FEE | ¤192.60 | 01/17/2006 |
| RADON FEE | ¤18.02 | 01/17/2006 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,987.03 |