I want to search for...

Permit #2005120548

Permit Details

Status: COED

Parcel Id: 16-11-30-0000-01010-0013
COMMERCIAL SQUARE FOOTAGE: 12000 sqft
Total Square Footage: 12000 sqft
Block: 101
Subdivision: 1150 - PALM COAST INDUSTRIAL PARK
Job Phone: (386)447-8680
Location Address: 15 HARGROVE LN
Type: BC - BUILDING COMMERCIAL
Issue Date: 05/15/2006
NOC: RECORDED
Applicant name: MICHAEL LEO BRANIFF
Owner: PALM COAST COMMERCIAL & INDUSTRIAL

Address

CENTER INC.

PALMCOAST, FL 32164

Lot: 13
Contracted Stated Job Value: ¤600,000.00
Job Description: COMMERCIAL WAREHOUSE BLDG #3
Type: CN

Contractor

RIVER CITY HOMES
Status Location Address State License Number Phone
CANCEL

12058 SAN JOSE BLVD #804

Jacksonville, FL 32223

CGC062728 (Exp: 08/31/2012) 904-260-9009

Sub Contractors

PETER JOSEPH LYDEN
Status Location Address State License Number Phone Fax
CANCEL

PO BOX 1009

BUNNELL, FL 32110

EC0002436 (Exp: 08/31/2014) (386) 931-2568 386-313-3445
MICHAEL DAVID CLARK
Status Location Address State License Number Phone
CANCEL

P. O. Box 918

Bunnell, FL 32110

CAC044867 (Exp: 09/30/2008) (386) 437-2001
BRUCE EDWARD HAWKESWORTH
Status Location Address State License Number Phone
CANCEL

671 Dara Circle

DELTONA, FL 32735

CFC053329 (Exp: 09/30/2008) (386) 228-2784
BARRY D MARTIN
Status Location Address State License Number Phone Fax
CANCEL

1650 N STATE STREET

Bunnell, FL 32110

CCC033728 (Exp: 08/31/2020) (386) 437-7700 (386)437-7701

Inspection History

Type Request Date Result Inspector
FINAL COMPLETE BUILDING INSPECTION 02/13/2007 FINAL APPROVED JLEVRAULT
LATH /BRICK FLASHING 02/09/2007 APPROVED JHINDMAN
Note: Tony from River City called and said that Joe L told him to schedule the lath/brick for 2/9/07, and that he would do that inspection
UTILITY COMMERCIAL FINAL 02/08/2007 APPROVED KKING
LANDSCAPE FINAL 02/08/2007 APPROVED WBUTLER
FIRE FINAL 02/07/2007 APPROVED JPATTEE
ENGINEERING FINAL 02/07/2007 APPROVED DMAY
UTILITY COMPANY FINAL 01/19/2007 APPROVED TSCHWEERS
ELECTRICAL FINAL 11/22/2006 APPROVED LHITES
Note: BUILDING THREE IS APPROVED FOR POWER FPL NEEDS 12 METERS CALLED FPL 11/27/06
FIREWALL INSPECTION 10/05/2006 APPROVED JPATTEE
Note: Penetrations
FIREWALL INSPECTION 09/07/2006 APPROVED JPATTEE
FIREWALL INSPECTION 08/16/2006 CANCELLED BY INSPECTOR JPATTEE
Note: THIS IS A REINSPECTION
FIREWALL INSPECTION 08/15/2006 Disapproved -FEE REQUIRED JPATTEE
Note: THIS IS A REINSPECTION See previous comments!!!!!!!
FIREWALL INSPECTION 08/08/2006 Disapproved - NO FEE JPATTEE
Note: electrical conduit not sealed correctly some soffits had holes some were not finished no one onsite for inspection.
INSULATION INSPECTION 07/31/2006 APPROVED JLEVRAULT
ALL ROUGH 07/27/2006 APPROVED - AS NOTED JLEVRAULT
Note: THIS IS A REINSPECTION LAG SINK SUPPORTS PROPERLY. DRAFTSTOP ALL PENETRATIONS WITH APPROVED MATERIALS.
ALL ROUGH 07/18/2006 Disapproved -FEE REQUIRED JLEVRAULT
Note: THIS IS A REINSPECTION PROVIDE REVISION FOR FIREWALL. REMOVE 2 X 4 BLOCKS FROM FIREWALL.
ALL ROUGH 06/28/2006 CANCELLED BY APPLICANT JLEVRAULT
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 06/26/2006 APPROVED JLEVRAULT
LINTEL 06/01/2006 APPROVED JHINDMAN
MONOLITHIC SLAB INSPECTION/SLAB 05/19/2006 APPROVED JLEVRAULT
FIRST ROUGH PLUMBING INSPECTION 05/17/2006 APPROVED JLEVRAULT

Review History

Department Status Date In Date Out
BLD COMPLETE 08/31/2006 09/01/2006
Note: Released By: CCOTE Approved for Release. REVISION: Updated energy calcs to show 3 a/c units.
BLD HOLD 08/11/2006 08/15/2006
Note: Held By: CCOTE Energy Forms are the 2001 code forms. Called Nicole on 8/15/06 and requested new 2004 forms.
BLD COMPLETE 02/13/2006 02/13/2006
Note: Released By: LWOODROME
BLD HOLD 01/26/2006 02/03/2006
Note: Held By: LWOODROME PLAN REVIEW COMMENTS: " Specify door hard ware, which complies with 2004 Florida Building Code, section 11-4.13.9, for H.C. accessibility. " Provide a door threshold detail, which indicates compliance with FBC, section 11-4.13.8, for H.C. accessibility. " Provide a detail, which clarifies the method of attaching the overhangs (above the doorways), to the primary structure. " Specify roof sheathing material and provide a fastening schedule. " Provide attic access to each attic area. " Provide UL number(s) and installation detail(s) for method(s) of protecting penetrations of rated assemblies. " Provide a switched light inside each attic access. " Specify GFCI protection for receptacle outlets in the restrooms. Larry Woodrome, CBO Chief Plans Examiner City of Palm Coast 386-986-3786
FI1 COMPLETE 01/04/2006 01/25/2006
Note: Released By: JPATTEE
DSD COMPLETE 01/04/2006 01/04/2006
Note: Released By: KIANNOTTI

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 02/13/2007
REINSPECTION FEE ¤40.00 02/13/2007
REVISION ¤40.00 02/13/2007
TRANSPORTATION IMPACT FEE ¤40,427.88 05/15/2006
ADMIN FEE ¤20.00 05/15/2006
BUILDING CODE ADMIN FUND ¤60.00 05/15/2006
ELECTRIC FEE ¤390.00 05/15/2006
FIRE COMM IMPACT FEE 4-1-05 ¤5,769.60 05/15/2006
FIRE PLANS REVIEW ¤120.00 05/15/2006
MECHANICAL FEE ¤390.00 05/15/2006
PERMIT FEE ¤3,300.00 05/15/2006
PLAN CHECK FEE ¤690.00 05/15/2006
PLUMBING FEE ¤390.00 05/15/2006
RADON FEE ¤60.00 05/15/2006
Fees Total Due: ¤0.00 Total Paid: ¤51,737.48