Permit #2006010308

Permit Details

Status: COED

Parcel Id: 07-11-31-7027-00150-0130
CONDITIONED SPACE: 2440 sqft
GARAGE: 681 sqft
OPENED PORCH (WITH ROOF) : 542 sqft
OPENED PORCH (WITH ROOF) : 71 sqft
Total Square Footage: 3734 sqft
Block: 0015
Subdivision: -
Job Phone: (386) 445-4515
Location Address: 48 WOODWORTH DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/24/2006
NOC: RECORDED
Applicant name: GREGORY LEE LE PERA
Owner: RICHARD D. TUCKER

Address

1411 DECATUR STREET, NW

WASHINGTON, DC 20011

Lot: 130
Contracted Stated Job Value: ¤33,633.00
Job Description: SINGLE FAMILY
Type: CN

Contractor

WAYNE HOMES BY CENTEX
Status Location Address Mailing Address State License Number Phone Fax
CANCEL

385 DOUGLAS AVE

ALTAMONTE SPRINGS, FL 32714

STE 3000

ALTAMONTE SPRINGS, FL 32714

CBC055301 (Exp: 09/30/2008) (386) 445-4515 (386)446-6285

Sub Contractors

MICHAEL G MORELLO JR
Status Location Address State License Number Phone Fax
CANCEL

2 HARGROVE GRADE

PALM COAST, FL 32137

CAC014293 (Exp: 08/31/2014) (386)447-3950 (386)446-4614
GARY WAYNE EVERS
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 740106

ORANGE CITY, FL 32763

CFC050566 (Exp: 08/31/2026) 386-775-0909 386-775-0918
RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
CANCEL

P. O. Box 1963

Bunnell, FL 32110

ER0011613 (Exp: 08/31/2008) (386) 437-0607 (386)437-1847

Inspection History

Type Request Date Result Inspector
FINAL COMPLETE BUILDING INSPECTION 08/08/2006 FINAL APPROVED PGALLMANN
STORMWATER FINAL INSPECTION 08/04/2006 APPROVED - AS NOTED DRANDALL
Note: remove trash rear adj. property.....36 sf road damage
UTILITY COMPANY FINAL 07/25/2006 APPROVED TSCHWEERS
RESIDENTIAL EARLY POWER 07/11/2006 APPROVED RMARVEL
DRIVEWAY 07/06/2006 APPROVED BFCHAMBERLAIN
Note: THIS IS A REINSPECTION
DRIVEWAY 07/05/2006 Disapproved -FEE REQUIRED BFCHAMBERLAIN
Note: Rebar missing.
LATH /BRICK FLASHING 05/18/2006 APPROVED PGALLMANN
INSULATION INSPECTION 05/17/2006 APPROVED PGALLMANN
ALL ROUGH 05/15/2006 APPROVED PGALLMANN
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 04/28/2006 APPROVED PGALLMANN
TEMPORARY POLE 04/07/2006 APPROVED JLEVRAULT
Note: CALLED SUSAN AT 2:20
LINTEL 04/07/2006 APPROVED JLEVRAULT
FOUNDATION SURVEY APPROVED BY STORMWATER 04/04/2006 APPROVED WKINELL
MONOLITHIC SLAB INSPECTION/SLAB 03/28/2006 APPROVED ARITTER
Note: THIS IS A REINSPECTION
MONOLITHIC SLAB INSPECTION/SLAB 03/24/2006 Disapproved -FEE REQUIRED JLEVRAULT
Note: NOT READY.
FIRST ROUGH PLUMBING INSPECTION 03/23/2006 APPROVED PGALLMANN
Note: THIS IS A REINSPECTION
FIRST ROUGH PLUMBING INSPECTION 03/21/2006 Disapproved -FEE REQUIRED ARITTER
Note: no plans in box

Review History

Department Status Date In Date Out
BLD COMPLETE 02/20/2006 02/23/2006
Note: Released By: CCOTE Approved for Release per plan cover sheet.
BLD HOLD 02/09/2006 02/10/2006
Note: Held By: CCOTE The following items must be submitted in order to complete the Building Permit Application plan review. 1. The roof loading indicated on the revised sheet 6 does not meet code requirements for general attic space of 10psf live load per FRC Table R301.5. The top chord loading meets the code requirements of Table R301.6 however the bottom chord does not meet the live load requirement of Table R301.5. Please revise the roof loading information on sheet 6.
BLD HOLD 01/31/2006 02/06/2006
Note: Held By: CCOTE The following items must be submitted in order to complete the Building Permit Application plan review. 1. The truss layout does not indicate whether there will be attic storage over the garage. In addition, the roof loading indicated does not meet code requirements for general attic space of 10psf live load and attic storage area(s), if used, of 20 psf live load per FRC Table R301.5. Revise roof loading information on sheet 6. If trusses are not to be designed for attic storage then the drawings shall clearly indicate that "NO ATTIC STORAGE IS ALLOWED".
ZON COMPLETE 01/30/2006 01/31/2006
Note: Released By: HHERKERT
ZON HOLD 01/26/2006 01/26/2006
Note: Held By: HHERKERT site plan setbacks and survey setbacks do not match, signed and sealed survey is incorrect
SW1 COMPLETE 01/13/2006 01/30/2006
Note: Released By: LAPTEKAR
ZON HOLD 01/23/2006
Note: Held By: HHERKERT landscape plan is required

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ENGINEERING ROAD DAMAGE ¤388.00 08/10/2006
EARLY POWER INSPECTION ¤40.00 08/10/2006
REINSPECTION FEE ¤40.00 08/10/2006
REINSPECTION FEE ¤40.00 08/10/2006
STORMWATER REINSPECTION FEE ¤35.00 08/10/2006
TRANS IMPACT FEE 4 - PER UNIT ¤3,248.51 02/24/2006
SCHOOL BOARD IMPACT FEE RES ¤3,600.00 02/24/2006
STORM WATER PERMIT FEES ¤80.00 02/24/2006
ADMIN FEE ¤20.00 02/24/2006
ARC HOUSE REVIEW ¤125.00 02/24/2006
BUILDING CODE ADMIN FUND ¤18.67 02/24/2006
ELECTRIC FEE ¤181.20 02/24/2006
FIRE RES IMPACT FEE 4-1-05 ¤173.47 02/24/2006
MECHANICAL FEE ¤181.20 02/24/2006
PERMIT FEE ¤982.80 02/24/2006
PARKS IMPACT FEE 11-2-04 ¤1,120.91 02/24/2006
PLAN CHECK FEE ¤100.80 02/24/2006
PLUMBING FEE ¤181.20 02/24/2006
RADON FEE ¤18.67 02/24/2006
Fees Total Due: ¤0.00 Total Paid: ¤10,575.43