Permit #2006010471

Permit Details

Status: COED

CONDITIONED SPACE: 44744 sqft
OPENED PORCH (WITH ROOF) : 13088 sqft
Total Square Footage: 57832 sqft
Subdivision: 2085 - Tidelands at the Village Phase II
Job Phone: (407)838-1486
Location Address: 55 RIVERVIEW BEND S
Type: BCR - BUILDING COMMERCIAL RESIDENTIAL -CONDO
Issue Date: 03/14/2006
NOC: RECORDED
Applicant name: JAMES NICHOLSON BOYCE IV
Owner: CENTEX DESTINATION PROPERTIES
Contracted Stated Job Value: ¤2,686,680.00
Job Description: BUILDING #20, 28 -PLEX CONDOMINIUM
Type: CN

Contractor

CENTEX DESTINATION PROPERTIES
Status Location Address Mailing Address State License Number Phone
CANCEL

1064 GREENWOOD BLVD

LAKE MARY, FL 32746

STE. 200

LAKE MARY, FL 32746

CGC1508651 (Exp: 08/31/2010) (407)838-1486

Sub Contractors

TRUMAN E GAILEY JR
Status Location Address State License Number Phone Fax
ACTIVE

231 Jean St.

DAYTONA BEACH, FL 32114

EC0000265 (Exp: 08/31/2026) (386) 255-1418 (386)255-3429
ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853
GARY WAYNE EVERS
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 740106

ORANGE CITY, FL 32763

CFC050566 (Exp: 08/31/2026) 386-775-0909 386-775-0918
WAYNE STEED
Status Location Address State License Number Phone
CANCEL

318 N. PINE AVENUE

IVERNESS, FL 34450

CCC058299 (Exp: 08/31/2010) (352)637-2422

Inspection History

Type Request Date Result Inspector
FINAL COMPLETE BUILDING INSPECTION 02/02/2007 FINAL APPROVED JMCGOWEN
LANDSCAPE FINAL 02/01/2007 APPROVED WBUTLER
ENGINEERING FINAL 02/01/2007 APPROVED DMAY
UTILITY COMMERCIAL FINAL 01/31/2007 APPROVED KKING
H.V.A.C. FINAL 01/29/2007 Disapproved - NO FEE JLEVRAULT
Note: CONTRACTOR CALLED IN WRONG BUILDING
FIRE FINAL 01/25/2007 APPROVED JPATTEE
UTILITY COMPANY FINAL 01/24/2007 APPROVED MBACON
H.V.A.C. FINAL 01/16/2007 APPROVED JLEVRAULT
PLUMBING FINAL 01/12/2007 APPROVED - AS NOTED JGIBSON
Note: Check crossed lines in units 2044--2045 @ building final.
ELECTRICAL FINAL 01/11/2007 APPROVED LHITES
COMMERCIAL POWER INSPECTION 12/20/2006 APPROVED LHITES
Note: 4 TH FLOOR EARLY POWER IS OK FPL HAS ALLREADY IN STALLED METERS CALLED FPL ON 12/20/06
COMMERCIAL POWER INSPECTION 11/29/2006 APPROVED LHITES
Note: 3RD FLOOR EARLY POWER IS OK/CALLED SUSAN AT FPL ON 11/29/06
RESIDENTIAL EARLY POWER 11/16/2006 APPROVED LHITES
Note: 2ND FLOOR APPROVED FOR EARLY POWER
RESIDENTIAL EARLY POWER 11/13/2006 APPROVED LHITES
Note: early power is approved for 1st floor only
COMMERCIAL POWER INSPECTION 11/01/2006 APPROVED RMARVEL
Note: building power.
INSULATION INSPECTION 11/01/2006 APPROVED - AS NOTED JLEVRAULT
Note: THIS IS A REINSPECTION FOURTH FLOOR INSULATION APPROVED.
INSULATION INSPECTION 10/31/2006 Disapproved -FEE REQUIRED JLEVRAULT
Note: FOURTH FLOOR NOT READY.
INSULATION INSPECTION 10/18/2006 APPROVED - AS NOTED JLEVRAULT
Note: THIRD FLOOR INSULATION APPROVED.
FRAMING 10/18/2006 APPROVED - AS NOTED JLEVRAULT
Note: FOURTH FLOOR FRAMING APPROVED.
ALL ROUGH 10/17/2006 APPROVED RMARVEL
Note: 4th floor electric. FOURTH FLOOR MECHANICAL APPROVED BY JOE LEVRAULT
SECOND ROUGH PLUMBING INSPECTION 10/12/2006 APPROVED - AS NOTED JGIBSON
Note: Building 20 second rough plumbing completed on all four floors.
FIREWALL INSPECTION 10/12/2006 CANCELLED BY INSPECTOR JPATTEE
ALL ROUGH 10/11/2006 APPROVED - AS NOTED JMCGOWEN
Note: 3rd floor electric rough.check fire stop
FIREWALL INSPECTION 10/10/2006 APPROVED JPATTEE
INSULATION INSPECTION 10/10/2006 APPROVED - AS NOTED JHINDMAN
Note: 2ND FLOOR OK
SECOND ROUGH PLUMBING INSPECTION 10/04/2006 APPROVED - AS NOTED JGIBSON
Note: Third floor only.
THRESHOLD/AFFIDAVIT 10/02/2006 APPROVED PPROVIDER
Note: Law & Associates, Inc. Threshold inspectors final report.
MONOLITHIC SLAB INSPECTION/SLAB 09/26/2006 Disapproved - NO FEE JLEVRAULT
Note: NEED LETTER OF MISSED INSPECTION.
FOOTER 09/26/2006 Disapproved - NO FEE JLEVRAULT
Note: NEED LETTER OF MISSED INSPECTION.
LINTEL 09/26/2006 Disapproved - NO FEE JLEVRAULT
Note: NEED LETTER OF MISSED INSPECTION.
INSULATION INSPECTION 09/21/2006 APPROVED - AS NOTED JLEVRAULT
Note: FIRST FLOOR INSULATION APPROVED.
FIREWALL INSPECTION 09/15/2006 APPROVED BMEYERS
Note: inspection for 1st and 2nd floors
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 08/31/2006 APPROVED - AS NOTED JLEVRAULT
Note: FILL CELLS. CHECK AT ALL ROUGH. Threshold inspectors report. dated 9/5/06
ALL ROUGH 08/15/2006 APPROVED - AS NOTED JLEVRAULT
Note: First and second floor framing and mechanical OK
ALL ROUGH 08/11/2006 APPROVED RMARVEL
Note: Electrical good throughout. Remaining allrough 1st floor only per joe levrault.
POURED CELL 08/11/2006 APPROVED PPROVIDER
Note: Threshold inspectors report. Parapit walls fill cells, elevator shaft and roof columns.
ALL ROUGH 08/08/2006 Disapproved -FEE REQUIRED RMARVEL
Note: strap ENT within 3 ft. f enclosure and every 3 ft. after. strap MC within 12 inches of box. protect ENT and MC within 1 and 1/4 " of framing member edge. MECHANICAL.............CONDENSATE LINES NOT COMPLETED. First & second floor plumbing OK. MARK GIBSON
FLOOD ZONE 'A' ELEVATION CERTIFICATE APPROVAL 07/25/2006 APPROVED CBENTLEY
LINTEL 07/17/2006 APPROVED PPROVIDER
Note: Threshold inspectors report. 4 th floor lintel.
SECOND FLOOR SLAB INSPECTION 07/03/2006 APPROVED PPROVIDER
Note: threshold inspectors report. 4th floor slab
LINTEL 06/22/2006 APPROVED PPROVIDER
Note: Threshold inspectors report. 3rd floor lintel
SECOND FLOOR SLAB INSPECTION 06/07/2006 APPROVED PPROVIDER
Note: Threshold inspectors report. 3rd floor
LINTEL 05/24/2006 APPROVED PPROVIDER
Note: Threshold inspectors report. 2nd floor lintel
SECOND FLOOR SLAB INSPECTION 05/09/2006 APPROVED PPROVIDER
Note: Threshold inspectors report.
LINTEL 04/28/2006 APPROVED PPROVIDER
Note: THIS IS A REINSPECTION Threshold inspectors report.
MONOLITHIC SLAB INSPECTION/SLAB 04/13/2006 APPROVED PPROVIDER
Note: THIS IS A REINSPECTION threshold inspectors report.
FIRST ROUGH PLUMBING INSPECTION 04/05/2006 APPROVED JMCGOWEN
Note: THIS IS A REINSPECTION
FIRST ROUGH PLUMBING INSPECTION 03/31/2006 Disapproved -FEE REQUIRED JMCGOWEN
Note: not ready , no test pressure
STEM FOOTING FOUNDATION 03/28/2006 APPROVED PPROVIDER
Note: Threshold inspectors report
STEM FOOTING FOUNDATION 03/27/2006 APPROVED PPROVIDER
Note: Threshold inspectors report. Elevator pit walls
FOOTER 03/22/2006 APPROVED PPROVIDER
Note: THIS IS A REINSPECTION Threshold inspectors report.

Review History

Department Status Date In Date Out
BLD COMPLETE 08/02/2006 08/03/2006
Note: Released By: CCOTE Approved for Release. Review by Fred R. Revision: Roof access tower.
BLD COMPLETE 03/06/2006 03/14/2006
Note: Released By: LWOODROME Approved for release as noted on plan. Checked by FR
FD1 COMPLETE 02/14/2006 02/14/2006
Note: Released By: JPATTEE
BLD HOLD 02/14/2006 02/17/2006
Note: Held By: FREODICA CITY OF PALM COAST BUILDING DIVISION Comments on Permit Application No. 2006010471 (Building No. 20) 1. Complete product approval packets, for components and cladding, must be available, at the job site, at the time of inspection. 2. Provide details of guardrails, at balconies, that meet the requirements of FBC 1015. 3. Provide more information on details of balcony screen enclosure showing sizes, spacing and method of attachment. 4. Provide roofing application instructions per FBC 1507.4.1.2. 5. Provide signs or stencils, which read, "FIRE AND SMOKE BARRIER PROTECT ALL OPENINGS" on all walls of rated construction and draftstop partitions, above decorative ceilings, in attic spaces and in other concealed spaces, per FBC704.2.1.4. 6. Equipment access through roof, 36x36 scuttle (A3.1C) does not show on structural roof framing plan (S-5). Provide structural section/detail and means of access. 7. Sanitary risers S/2 & S/3 shown on P-10 do not match with P-1, P-5, P-6 & P-7. 8. Indicate size of PVC condensate drain line (plan key note #3) on M-5 & M6. 9. Clarify electrical/elevator/storage rooms on the following : a. Wall construction- 2 sides indicate to be 2-hr fire rated, 1 side indicates non-fire rated. b. Electrical- storage room at 4th floor (top floor) is missing as E-6 indicates only for 3rd floor (Detail 1/E-4). Also, on E-7, plan title should be Roof Plan and not Top Floor. c. Structural - provide wall opening size, location & detail for elevator room ventilation equipment (VTAC-1).
FD1 COMPLETE 01/20/2006 01/31/2006
Note: Released By: JPATTEE Held By: JPATTEE Sheet C-1, code data. NFPA 101 Life Safety Code 2001 edition is outdated. Plans submitted shall comply with NFPA 101, 2003 edition. NOTE: DO NOT JUST CHANGE CODE DATA TO COMPLY! Provide automatic fire sprinkler design criteria. Sheet A7.5.1 detail #4 indicates calculated fire resistance per 1994 SBC. Is this data outdated? Provide listing agency for 1 hour rated cmu tenant separation wall. UL,FM etc.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
EARLY POWER INSPECTION ¤40.00 02/02/2007
EARLY POWER INSPECTION ¤40.00 02/02/2007
REINSPECTION FEE ¤40.00 02/02/2007
REINSPECTION FEE ¤40.00 02/02/2007
REINSPECTION FEE ¤40.00 02/02/2007
REVISION ¤40.00 02/02/2007
TTRANS IMPACT FEE CONDO/TOWN ¤40,768.00 03/14/2006
ADMIN FEE ¤20.00 03/14/2006
BUILDING CODE ADMIN FUND ¤289.16 03/14/2006
ELECTRIC FEE ¤2,463.60 03/14/2006
FIRE COMM IMPACT FEE 4-1-05 ¤27,805.63 03/14/2006
FIRE PLANS REVIEW ¤578.32 03/14/2006
MECHANICAL FEE ¤2,463.60 03/14/2006
PERMIT FEE ¤22,308.00 03/14/2006
PARKS IMPACT FEE 11-2-04 ¤31,385.48 03/14/2006
PLUMBING FEE ¤2,463.60 03/14/2006
RADON FEE ¤289.16 03/14/2006
Fees Total Due: ¤0.00 Total Paid: ¤131,074.55