I want to search for...
Permit #2006010471
Permit Details
Status: COED
| CONDITIONED SPACE: 44744 sqft |
| OPENED PORCH (WITH ROOF) : 13088 sqft |
| Total Square Footage: 57832 sqft |
| Subdivision: 2085 - Tidelands at the Village Phase II |
| Job Phone: (407)838-1486 |
| Location Address: 55 RIVERVIEW BEND S |
| Type: BCR - BUILDING COMMERCIAL RESIDENTIAL -CONDO |
| Issue Date: 03/14/2006 |
| NOC: RECORDED |
| Applicant name: JAMES NICHOLSON BOYCE IV |
| Owner: CENTEX DESTINATION PROPERTIES |
| Contracted Stated Job Value: ¤2,686,680.00 |
| Job Description: BUILDING #20, 28 -PLEX CONDOMINIUM |
| Type: CN |
Contractor
CENTEX DESTINATION PROPERTIES
| Status | Location Address | Mailing Address | State License Number | Phone |
| CANCEL |
1064 GREENWOOD BLVD LAKE MARY, FL 32746 |
STE. 200 LAKE MARY, FL 32746 |
CGC1508651 (Exp: 08/31/2010) | (407)838-1486 |
Sub Contractors
TRUMAN E GAILEY JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
231 Jean St. DAYTONA BEACH, FL 32114 |
EC0000265 (Exp: 08/31/2026) | (386) 255-1418 | (386)255-3429 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
GARY WAYNE EVERS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 740106 ORANGE CITY, FL 32763 |
CFC050566 (Exp: 08/31/2026) | 386-775-0909 | 386-775-0918 |
WAYNE STEED
| Status | Location Address | State License Number | Phone |
| CANCEL |
318 N. PINE AVENUE IVERNESS, FL 34450 |
CCC058299 (Exp: 08/31/2010) | (352)637-2422 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 02/02/2007 | FINAL APPROVED | JMCGOWEN |
| LANDSCAPE FINAL | 02/01/2007 | APPROVED | WBUTLER |
| ENGINEERING FINAL | 02/01/2007 | APPROVED | DMAY |
| UTILITY COMMERCIAL FINAL | 01/31/2007 | APPROVED | KKING |
| H.V.A.C. FINAL | 01/29/2007 | Disapproved - NO FEE | JLEVRAULT |
| Note: CONTRACTOR CALLED IN WRONG BUILDING | |||
| FIRE FINAL | 01/25/2007 | APPROVED | JPATTEE |
| UTILITY COMPANY FINAL | 01/24/2007 | APPROVED | MBACON |
| H.V.A.C. FINAL | 01/16/2007 | APPROVED | JLEVRAULT |
| PLUMBING FINAL | 01/12/2007 | APPROVED - AS NOTED | JGIBSON |
| Note: Check crossed lines in units 2044--2045 @ building final. | |||
| ELECTRICAL FINAL | 01/11/2007 | APPROVED | LHITES |
| COMMERCIAL POWER INSPECTION | 12/20/2006 | APPROVED | LHITES |
| Note: 4 TH FLOOR EARLY POWER IS OK FPL HAS ALLREADY IN STALLED METERS CALLED FPL ON 12/20/06 | |||
| COMMERCIAL POWER INSPECTION | 11/29/2006 | APPROVED | LHITES |
| Note: 3RD FLOOR EARLY POWER IS OK/CALLED SUSAN AT FPL ON 11/29/06 | |||
| RESIDENTIAL EARLY POWER | 11/16/2006 | APPROVED | LHITES |
| Note: 2ND FLOOR APPROVED FOR EARLY POWER | |||
| RESIDENTIAL EARLY POWER | 11/13/2006 | APPROVED | LHITES |
| Note: early power is approved for 1st floor only | |||
| COMMERCIAL POWER INSPECTION | 11/01/2006 | APPROVED | RMARVEL |
| Note: building power. | |||
| INSULATION INSPECTION | 11/01/2006 | APPROVED - AS NOTED | JLEVRAULT |
| Note: THIS IS A REINSPECTION FOURTH FLOOR INSULATION APPROVED. | |||
| INSULATION INSPECTION | 10/31/2006 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: FOURTH FLOOR NOT READY. | |||
| INSULATION INSPECTION | 10/18/2006 | APPROVED - AS NOTED | JLEVRAULT |
| Note: THIRD FLOOR INSULATION APPROVED. | |||
| FRAMING | 10/18/2006 | APPROVED - AS NOTED | JLEVRAULT |
| Note: FOURTH FLOOR FRAMING APPROVED. | |||
| ALL ROUGH | 10/17/2006 | APPROVED | RMARVEL |
| Note: 4th floor electric. FOURTH FLOOR MECHANICAL APPROVED BY JOE LEVRAULT | |||
| SECOND ROUGH PLUMBING INSPECTION | 10/12/2006 | APPROVED - AS NOTED | JGIBSON |
| Note: Building 20 second rough plumbing completed on all four floors. | |||
| FIREWALL INSPECTION | 10/12/2006 | CANCELLED BY INSPECTOR | JPATTEE |
| ALL ROUGH | 10/11/2006 | APPROVED - AS NOTED | JMCGOWEN |
| Note: 3rd floor electric rough.check fire stop | |||
| FIREWALL INSPECTION | 10/10/2006 | APPROVED | JPATTEE |
| INSULATION INSPECTION | 10/10/2006 | APPROVED - AS NOTED | JHINDMAN |
| Note: 2ND FLOOR OK | |||
| SECOND ROUGH PLUMBING INSPECTION | 10/04/2006 | APPROVED - AS NOTED | JGIBSON |
| Note: Third floor only. | |||
| THRESHOLD/AFFIDAVIT | 10/02/2006 | APPROVED | PPROVIDER |
| Note: Law & Associates, Inc. Threshold inspectors final report. | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 09/26/2006 | Disapproved - NO FEE | JLEVRAULT |
| Note: NEED LETTER OF MISSED INSPECTION. | |||
| FOOTER | 09/26/2006 | Disapproved - NO FEE | JLEVRAULT |
| Note: NEED LETTER OF MISSED INSPECTION. | |||
| LINTEL | 09/26/2006 | Disapproved - NO FEE | JLEVRAULT |
| Note: NEED LETTER OF MISSED INSPECTION. | |||
| INSULATION INSPECTION | 09/21/2006 | APPROVED - AS NOTED | JLEVRAULT |
| Note: FIRST FLOOR INSULATION APPROVED. | |||
| FIREWALL INSPECTION | 09/15/2006 | APPROVED | BMEYERS |
| Note: inspection for 1st and 2nd floors | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 08/31/2006 | APPROVED - AS NOTED | JLEVRAULT |
| Note: FILL CELLS. CHECK AT ALL ROUGH. Threshold inspectors report. dated 9/5/06 | |||
| ALL ROUGH | 08/15/2006 | APPROVED - AS NOTED | JLEVRAULT |
| Note: First and second floor framing and mechanical OK | |||
| ALL ROUGH | 08/11/2006 | APPROVED | RMARVEL |
| Note: Electrical good throughout. Remaining allrough 1st floor only per joe levrault. | |||
| POURED CELL | 08/11/2006 | APPROVED | PPROVIDER |
| Note: Threshold inspectors report. Parapit walls fill cells, elevator shaft and roof columns. | |||
| ALL ROUGH | 08/08/2006 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: strap ENT within 3 ft. f enclosure and every 3 ft. after. strap MC within 12 inches of box. protect ENT and MC within 1 and 1/4 " of framing member edge. MECHANICAL.............CONDENSATE LINES NOT COMPLETED. First & second floor plumbing OK. MARK GIBSON | |||
| FLOOD ZONE 'A' ELEVATION CERTIFICATE APPROVAL | 07/25/2006 | APPROVED | CBENTLEY |
| LINTEL | 07/17/2006 | APPROVED | PPROVIDER |
| Note: Threshold inspectors report. 4 th floor lintel. | |||
| SECOND FLOOR SLAB INSPECTION | 07/03/2006 | APPROVED | PPROVIDER |
| Note: threshold inspectors report. 4th floor slab | |||
| LINTEL | 06/22/2006 | APPROVED | PPROVIDER |
| Note: Threshold inspectors report. 3rd floor lintel | |||
| SECOND FLOOR SLAB INSPECTION | 06/07/2006 | APPROVED | PPROVIDER |
| Note: Threshold inspectors report. 3rd floor | |||
| LINTEL | 05/24/2006 | APPROVED | PPROVIDER |
| Note: Threshold inspectors report. 2nd floor lintel | |||
| SECOND FLOOR SLAB INSPECTION | 05/09/2006 | APPROVED | PPROVIDER |
| Note: Threshold inspectors report. | |||
| LINTEL | 04/28/2006 | APPROVED | PPROVIDER |
| Note: THIS IS A REINSPECTION Threshold inspectors report. | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 04/13/2006 | APPROVED | PPROVIDER |
| Note: THIS IS A REINSPECTION threshold inspectors report. | |||
| FIRST ROUGH PLUMBING INSPECTION | 04/05/2006 | APPROVED | JMCGOWEN |
| Note: THIS IS A REINSPECTION | |||
| FIRST ROUGH PLUMBING INSPECTION | 03/31/2006 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: not ready , no test pressure | |||
| STEM FOOTING FOUNDATION | 03/28/2006 | APPROVED | PPROVIDER |
| Note: Threshold inspectors report | |||
| STEM FOOTING FOUNDATION | 03/27/2006 | APPROVED | PPROVIDER |
| Note: Threshold inspectors report. Elevator pit walls | |||
| FOOTER | 03/22/2006 | APPROVED | PPROVIDER |
| Note: THIS IS A REINSPECTION Threshold inspectors report. |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 08/02/2006 | 08/03/2006 |
| Note: Released By: CCOTE Approved for Release. Review by Fred R. Revision: Roof access tower. | |||
| BLD | COMPLETE | 03/06/2006 | 03/14/2006 |
| Note: Released By: LWOODROME Approved for release as noted on plan. Checked by FR | |||
| FD1 | COMPLETE | 02/14/2006 | 02/14/2006 |
| Note: Released By: JPATTEE | |||
| BLD | HOLD | 02/14/2006 | 02/17/2006 |
| Note: Held By: FREODICA CITY OF PALM COAST BUILDING DIVISION Comments on Permit Application No. 2006010471 (Building No. 20) 1. Complete product approval packets, for components and cladding, must be available, at the job site, at the time of inspection. 2. Provide details of guardrails, at balconies, that meet the requirements of FBC 1015. 3. Provide more information on details of balcony screen enclosure showing sizes, spacing and method of attachment. 4. Provide roofing application instructions per FBC 1507.4.1.2. 5. Provide signs or stencils, which read, "FIRE AND SMOKE BARRIER PROTECT ALL OPENINGS" on all walls of rated construction and draftstop partitions, above decorative ceilings, in attic spaces and in other concealed spaces, per FBC704.2.1.4. 6. Equipment access through roof, 36x36 scuttle (A3.1C) does not show on structural roof framing plan (S-5). Provide structural section/detail and means of access. 7. Sanitary risers S/2 & S/3 shown on P-10 do not match with P-1, P-5, P-6 & P-7. 8. Indicate size of PVC condensate drain line (plan key note #3) on M-5 & M6. 9. Clarify electrical/elevator/storage rooms on the following : a. Wall construction- 2 sides indicate to be 2-hr fire rated, 1 side indicates non-fire rated. b. Electrical- storage room at 4th floor (top floor) is missing as E-6 indicates only for 3rd floor (Detail 1/E-4). Also, on E-7, plan title should be Roof Plan and not Top Floor. c. Structural - provide wall opening size, location & detail for elevator room ventilation equipment (VTAC-1). | |||
| FD1 | COMPLETE | 01/20/2006 | 01/31/2006 |
| Note: Released By: JPATTEE Held By: JPATTEE Sheet C-1, code data. NFPA 101 Life Safety Code 2001 edition is outdated. Plans submitted shall comply with NFPA 101, 2003 edition. NOTE: DO NOT JUST CHANGE CODE DATA TO COMPLY! Provide automatic fire sprinkler design criteria. Sheet A7.5.1 detail #4 indicates calculated fire resistance per 1994 SBC. Is this data outdated? Provide listing agency for 1 hour rated cmu tenant separation wall. UL,FM etc. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | ¤40.00 | 02/02/2007 |
| EARLY POWER INSPECTION | ¤40.00 | 02/02/2007 |
| REINSPECTION FEE | ¤40.00 | 02/02/2007 |
| REINSPECTION FEE | ¤40.00 | 02/02/2007 |
| REINSPECTION FEE | ¤40.00 | 02/02/2007 |
| REVISION | ¤40.00 | 02/02/2007 |
| TTRANS IMPACT FEE CONDO/TOWN | ¤40,768.00 | 03/14/2006 |
| ADMIN FEE | ¤20.00 | 03/14/2006 |
| BUILDING CODE ADMIN FUND | ¤289.16 | 03/14/2006 |
| ELECTRIC FEE | ¤2,463.60 | 03/14/2006 |
| FIRE COMM IMPACT FEE 4-1-05 | ¤27,805.63 | 03/14/2006 |
| FIRE PLANS REVIEW | ¤578.32 | 03/14/2006 |
| MECHANICAL FEE | ¤2,463.60 | 03/14/2006 |
| PERMIT FEE | ¤22,308.00 | 03/14/2006 |
| PARKS IMPACT FEE 11-2-04 | ¤31,385.48 | 03/14/2006 |
| PLUMBING FEE | ¤2,463.60 | 03/14/2006 |
| RADON FEE | ¤289.16 | 03/14/2006 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤131,074.55 |