I want to search for...
Permit #2006020040
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-00660-0070 |
| CONDITIONED SPACE: 2154 sqft |
| GARAGE: 442 sqft |
| OPENED PORCH (WITH ROOF) : 162 sqft |
| OPENED PORCH (WITH ROOF) : 62 sqft |
| Total Square Footage: 2820 sqft |
| Block: 00660 |
| Subdivision: - |
| Job Phone: (386)437-5782 |
| Location Address: 9 ELLIOT PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/06/2006 |
| NOC: RECORDED |
| Applicant name: SANDRA LEE FRENCH |
| Owner: TOMASZ MICULA |
|
Address 208 OAK STREET SOUTH AMBOY, NJ 08879 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤160,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SANDEX HOMES
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
27 EGAN DR PALM COAST, FL |
CRC1327302 (Exp: 09/30/2008) | (386)437-5782 | (386)437-5782 |
Sub Contractors
MICHAEL DAVID CLARK
| Status | Location Address | State License Number | Phone |
| CANCEL |
P. O. Box 918 Bunnell, FL 32110 |
CAC044867 (Exp: 09/30/2008) | (386) 437-2001 |
STEVEN JAY SMITH
| Status | Location Address | State License Number | Phone |
| INACTIVE |
104 West Cedar Avenue Orange City, FL 32763 |
EC0001542 (Exp: 08/31/2022) | (386)775-7776 |
KEITH E PETRY
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
11 RIPLE PLACE PALM COAST, FL 32164 |
CCC1326298 (Exp: 08/31/2010) | (386)586-3113 | (000)000-0000 |
BRUCE EDWARD HAWKESWORTH
| Status | Location Address | State License Number | Phone |
| CANCEL |
671 Dara Circle DELTONA, FL 32735 |
CFC053329 (Exp: 09/30/2008) | (386) 228-2784 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 03/20/2007 | FINAL APPROVED | PGALLMANN |
| STORMWATER FINAL INSPECTION | 03/15/2007 | APPROVED | DRANDALL |
| Note: Road damage repaired | |||
| STORMWATER FINAL INSPECTION | 03/08/2007 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: Remove trash rear side | |||
| UTILITY COMPANY FINAL | 03/01/2007 | APPROVED | MBACON |
| DRIVEWAY | 01/24/2007 | APPROVED - AS NOTED | GLALIMA |
| Note: THIS IS A REINSPECTION , READY TO POUR , REINSPECTOIN | |||
| DRIVEWAY | 01/22/2007 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: 90,deg C UT AT ROAD AND 5 '' MIN / AND COVER CULVERT PIPE WITH 5 '' OF CONCRETE . NO BOX . BUILDER DID CALL , BOX IN GARAGE DOOR NOT OPEN . | |||
| LATH /BRICK FLASHING | 11/27/2006 | APPROVED | DROCKWELL |
| INSULATION INSPECTION | 11/14/2006 | APPROVED | PGALLMANN |
| ALL ROUGH | 11/07/2006 | APPROVED - AS NOTED | DROCKWELL |
| Note: Replace smurf in panel with ridged pipe for spare/Secure pump motor/Bond pump motor/ Fasten eyebrow lites | |||
| ALL ROUGH | 11/06/2006 | CANCELLED BY APPLICANT | PGALLMANN |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 09/06/2006 | APPROVED - AS NOTED | KSAMPICO |
| Note: missing htt22 at 1f, missing backing at sheathing strapping OK TO APPROVED BY JOE MCGOWEN | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 08/25/2006 | Disapproved -FEE REQUIRED | ACOOPER |
| Note: Revised truss engineering is totally different from "As built" truss layout. Revise plan to show proper layout. | |||
| LINTEL | 08/04/2006 | APPROVED | CMINI |
| MONOLITHIC SLAB INSPECTION/SLAB | 08/03/2006 | APPROVED | CMINI |
| FOUNDATION SURVEY APPROVED BY STORMWATER | 08/03/2006 | APPROVED | LAPTEKAR |
| MONOLITHIC SLAB INSPECTION/SLAB | 07/14/2006 | APPROVED | KSAMPICO |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 07/13/2006 | Disapproved -FEE REQUIRED | KSAMPICO |
| Note: Not ready. | |||
| FIRST ROUGH PLUMBING INSPECTION | 07/10/2006 | APPROVED | KSAMPICO |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 08/31/2006 | 09/01/2006 |
| Note: Released By: CCOTE Approved for Release. REVISION: Revised truss layout and connector schedule. | |||
| BLD | HOLD | 08/28/2006 | 08/29/2006 |
| Note: Held By: CCOTE The following items must be submitted in order to complete Revision submitted for review. 1. The new truss layout requires a 2 copies of a new signed and sealed truss connector schedule. | |||
| BLD | COMPLETE | 08/23/2006 | 08/24/2006 |
| Note: Released By: CCOTE Approved for Release. REVISION: New truss layout. | |||
| BLD | COMPLETE | 03/22/2006 | 03/29/2006 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. | |||
| BLD | HOLD | 02/13/2006 | 02/14/2006 |
| Note: Held By: CCOTE The following items must be submitted in order to complete Building Permit Application plan review. 1. The lintel values included on the load tables do not match those in the latest Cast-Crete literature. Please indicate manufacture used, if Cast-Crete then update values in load tables. 2. The Lintel Type "AA" states lintel no steel (bond beam top course). It appears to show hatching. Please clarify whether this is an 8F8 or and 8U8. Please add this to the description above lintel on drawing. 3. The Lintel Type "A" states bond beam only. It appears to show hatching and a steel bar at the bottom and Cast-Crete only has an option for steel at the top or top & bottom. Please clarify whether this is a cast in place lintel or a precast lintel. If it is a precast lintel clarify whether this is an 8F8-0B/1T. Please add this to the description above lintel on drawing. 4. The Lintel Type "B" states lintel w/ steel (bond beam top course). It appears to show hatching and a steel bar at the bottom and Cast-Crete only has an option for steel at the top or top & bottom. Please clarify whether this is an 8F8-0B/1T. Please add this to the description above lintel on drawing. What is different than lintel type "A". 5. The Lintel Type "C" states lintel w/ steel (bond beam top course). Please clarify whether this is an 8F16-1B/1T. Please add this to the description above lintel on drawing. 6. The elevations do not indicate all of the various window head heights. Please add these dimensions to the elevations. 7. The drawings do not indicate truss uplift connectors to be used for each truss. A list of some connectors is located on sheet D3 but this is not sufficient because it only contains generic uplift values. Please submit a project specific truss connector schedule listing connector(s) to be used for each connection point for each truss as well connectors to be used for other items including but not limited to beams, columns and hand framed members. | |||
| SW1 | COMPLETE | 02/01/2006 | 02/20/2006 |
| Note: Released By: LAPTEKAR | |||
| ZON | COMPLETE | 02/01/2006 | 02/13/2006 |
| Note: Released By: JGONZALEZ |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 03/20/2007 |
| REINSPECTION FEE | ¤40.00 | 03/20/2007 |
| REINSPECTION FEE | ¤40.00 | 03/20/2007 |
| REVISION | ¤40.00 | 03/20/2007 |
| REVISION | ¤40.00 | 03/20/2007 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 03/20/2007 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 03/20/2007 |
| TRANS IMPACT FEE 4 - PER UNIT | ¤3,248.51 | 07/06/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 07/06/2006 |
| STORM WATER PERMIT FEES | ¤80.00 | 07/06/2006 |
| ADMIN FEE | ¤20.00 | 07/06/2006 |
| ARC HOUSE REVIEW | ¤125.00 | 07/06/2006 |
| BUILDING CODE ADMIN FUND | ¤14.10 | 07/06/2006 |
| ELECTRIC FEE | ¤154.80 | 07/06/2006 |
| FIRE RES IMPACT FEE 4-1-05 | ¤173.47 | 07/06/2006 |
| MECHANICAL FEE | ¤154.80 | 07/06/2006 |
| PERMIT FEE | ¤811.20 | 07/06/2006 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 07/06/2006 |
| PLAN CHECK FEE | ¤83.20 | 07/06/2006 |
| PLUMBING FEE | ¤154.80 | 07/06/2006 |
| RADON FEE | ¤14.10 | 07/06/2006 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,024.89 |