I want to search for...
Permit #2006020302
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7037-00770-0090 |
| CONDITIONED SPACE: 2560 sqft |
| GARAGE: 549 sqft |
| OPENED PORCH (WITH ROOF) : 340 sqft |
| OPENED PORCH (WITH ROOF) : 52 sqft |
| Total Square Footage: 3501 sqft |
| Block: 00770 |
| Subdivision: - |
| Job Phone: (386)851-7940 |
| Location Address: 34 LINDBERG LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/02/2006 |
| NOC: RECORDED |
| Applicant name: CRAIG JON SCHMAUSS |
| Owner: MERCEDES HOMES |
|
Address 775 HARLEY STRICKLAND BLVD ORANGE CITY, FL 32763 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤280,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MERCEDES HOMES INC.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
12001 SCIENCE DRIVE #160 ORLANDO, FL 32826 |
CGC1510145 (Exp: 08/31/2012) | (407)272-5591 | (407)282-1563 |
Sub Contractors
STEVEN JAY SMITH
| Status | Location Address | State License Number | Phone |
| INACTIVE |
104 West Cedar Avenue Orange City, FL 32763 |
EC0001542 (Exp: 08/31/2022) | (386)775-7776 |
EDDIE T PALMATEER
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
2985 ENTERPRISE ROAD DEBARY, FL 32713 |
SUITE A DEBARY, FL 32713 |
CAC1813533 (Exp: 08/31/2024) | (386)668-8651 | (386)668-7758 |
KATRINA ELAINE RIEF-D'ERRICO
| Status | Location Address | State License Number | Phone |
| CANCEL |
157 BOULDER ROCK DR Palm Coast, FL 32137 |
CFC1425676 (Exp: 09/30/2008) | (386)437-4250 |
LISA MARIE STEINER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
12001 SCIENCE DRIVE #160 ORLANDO, FL 32826 |
CGC1510145 (Exp: 08/31/2012) | (407)272-5591 | (407)282-1563 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 08/22/2006 | FINAL APPROVED | MMOORE |
| Note: THIS IS A REINSPECTION | |||
| FINAL COMPLETE BUILDING INSPECTION | 08/21/2006 | CANCELLED BY APPLICANT | MMOORE |
| UTILITY COMPANY FINAL | 08/17/2006 | APPROVED | CBOEHME |
| Note: THIS IS A REINSPECTION | |||
| STORMWATER FINAL INSPECTION | 08/14/2006 | APPROVED - AS NOTED | DRANDALL |
| Note: 12 sf road damage | |||
| RESIDENTIAL EARLY POWER | 08/02/2006 | APPROVED | MMOORE |
| Note: SCHEDULED AN EARLY POWER INSPECTION FOR 8/2 AS PER THE CONTRACTOR FROM MERCEDES HOMES | |||
| UTILITY COMPANY FINAL | 08/01/2006 | Disapproved - NO FEE | TSCHWEERS |
| Note: failed no sod down yet | |||
| DRIVEWAY | 07/18/2006 | APPROVED | DRANDALL |
| INSULATION INSPECTION | 06/01/2006 | APPROVED | PGALLMANN |
| LATH /BRICK FLASHING | 06/01/2006 | APPROVED | PGALLMANN |
| ALL ROUGH | 05/30/2006 | APPROVED | ARITTER |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 05/11/2006 | APPROVED - AS NOTED | JLEVRAULT |
| Note: WOOD TO BLOCK MEMBER IN GARAGE MISSING TAPCONS. HTT22 MISSING ON H72P. CHECK OTHER HTT22'S FOR PROPER ANCHORAGE INTO MASONRY. | |||
| LINTEL | 05/03/2006 | APPROVED | MMOORE |
| FOUNDATION SURVEY APPROVED BY STORMWATER | 05/02/2006 | APPROVED | LAPTEKAR |
| Note: may need to adjust lot grading plan for .5 higher FFE | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 04/21/2006 | APPROVED | JLEVRAULT |
| FIRST ROUGH PLUMBING INSPECTION | 04/19/2006 | APPROVED | MMOORE |
Review History
| Department | Status | Date In | Date Out |
| BLD | HOLD | 04/27/2006 | 05/01/2006 |
| Note: Held By: CCOTE Revision to stamp new plan set. Placed on Hold due to fact that sheets are not signed and sealed. Called on 5/1/06. 5/2...per Mark of Mercedes...sealed plans were found...owner had taken them///LA | |||
| SW1 | COMPLETE | 03/27/2006 | 05/02/2006 |
| Note: Released By: LAPTEKAR Approved added spot elevations for the drainage | |||
| BLD | COMPLETE | 02/18/2006 | 02/21/2006 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. | |||
| SW1 | COMPLETE | 02/08/2006 | 02/27/2006 |
| Note: Released By: LAPTEKAR Need to ensure the drainage does not impact the improved lot next door at lot#10 Need more proposed elevations, will release as noted. | |||
| ZON | COMPLETE | 02/08/2006 | 02/18/2006 |
| Note: Released By: HHERKERT | |||
| BLD | CANCEL |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ENGINEERING ROAD DAMAGE | ¤196.00 | 08/23/2006 |
| EARLY POWER INSPECTION | ¤40.00 | 08/23/2006 |
| FIRE RES IMPACT FEE 4-1-05 | ¤173.47 | 03/02/2006 |
| MECHANICAL FEE | ¤198.00 | 03/02/2006 |
| PERMIT FEE | ¤1,092.00 | 03/02/2006 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 03/02/2006 |
| PLAN CHECK FEE | ¤112.00 | 03/02/2006 |
| PLUMBING FEE | ¤198.00 | 03/02/2006 |
| RADON FEE | ¤17.51 | 03/02/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 03/02/2006 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/02/2006 |
| TRANS IMPACT FEE 4 - PER UNIT | ¤3,248.51 | 03/02/2006 |
| ADMIN FEE | ¤20.00 | 03/02/2006 |
| ARC HOUSE REVIEW | ¤125.00 | 03/02/2006 |
| BUILDING CODE ADMIN FUND | ¤17.51 | 03/02/2006 |
| ELECTRIC FEE | ¤198.00 | 03/02/2006 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,436.91 |