I want to search for...

Permit #2006020507

Permit Details

Status: COED

CONDITIONED SPACE: 16449 sqft
GARAGE: 2535 sqft
OPENED PORCH (WITH ROOF) : 1158 sqft
Total Square Footage: 20142 sqft
Subdivision: 2085 - Tidelands at the Village Phase II
Job Phone: (407)838-1486
Location Address: 200 RIVERVIEW BEND S
Type: BCR - BUILDING COMMERCIAL RESIDENTIAL -CONDO
Issue Date: 03/20/2006
NOC: NO DOCUMENTATION
Applicant name: JAMES NICHOLSON BOYCE IV
Owner: CENTEX DESTINATION PROPERTIES

Address

1064 GREENWOOD BLVD SUITE 200

LAKE MARY, FL 32746

Contracted Stated Job Value: ¤1,300,000.00
Job Description: BUILDING #9 - 10 PLEX TOWNHOUSES COMMERICIAL BUILDING
Type: CN

Contractor

CENTEX DESTINATION PROPERTIES
Status Location Address Mailing Address State License Number Phone
CANCEL

1064 GREENWOOD BLVD

LAKE MARY, FL 32746

STE. 200

LAKE MARY, FL 32746

CGC1508651 (Exp: 08/31/2010) (407)838-1486

Sub Contractors

TRUMAN E GAILEY JR
Status Location Address State License Number Phone Fax
ACTIVE

231 Jean St.

DAYTONA BEACH, FL 32114

EC0000265 (Exp: 08/31/2026) (386) 255-1418 (386)255-3429
ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853
GARY WAYNE EVERS
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 740106

ORANGE CITY, FL 32763

CFC050566 (Exp: 08/31/2026) 386-775-0909 386-775-0918
WAYNE STEED
Status Location Address State License Number Phone
CANCEL

318 N. PINE AVENUE

IVERNESS, FL 34450

CCC058299 (Exp: 08/31/2010) (352)637-2422

Inspection History

Type Request Date Result Inspector
FINAL COMPLETE BUILDING INSPECTION 07/03/2007 FINAL APPROVED JMCGOWEN
UTILITY COMMERCIAL FINAL 06/29/2007 APPROVED KKING
UTILITY COMPANY FINAL 06/29/2007 APPROVED TSCHWEERS
LANDSCAPE FINAL 06/28/2007 APPROVED WBUTLER
FIRE FINAL 06/26/2007 APPROVED JPATTEE
ELECTRICAL FINAL 06/20/2007 APPROVED LHITES
Note: THIS IS A REINSPECTION
ELECTRICAL FINAL 06/18/2007 Disapproved -FEE REQUIRED LHITES
Note: 911-ARC FAULT WILL NOT RESET, 912-ARC FAULT WILL NOT RESET AND 1 WILL NOT TRIP, 921-MISSING ARC FAULT FOR SMOKE DETECTORS
PLUMBING FINAL 06/18/2007 APPROVED - AS NOTED JGIBSON
Note: THIS WAS A PLUMBING FINAL ALL OK GROUT TOILETS BEFORE FINAL
H.V.A.C. FINAL 06/15/2007 APPROVED JLEVRAULT
COMMERCIAL POWER INSPECTION 03/05/2007 APPROVED LHITES
Note: EARLY POWER FOR BUILDING 9 IS OK FPL NEEDS 10 METERS
ENGINEERING FINAL 02/19/2007 APPROVED DMAY
COMMERCIAL POWER INSPECTION 02/14/2007 APPROVED - AS NOTED RMARVEL
Note: CALLED FPL AT 3:30 R.M.
INSULATION INSPECTION 01/24/2007 APPROVED JHINDMAN
Note:
FIREWALL INSPECTION 01/19/2007 APPROVED JPATTEE
Note: THIS IS A REINSPECTION
THRESHOLD/AFFIDAVIT 10/09/2006 APPROVED PPROVIDER
Note: Law & Associates Threshold inspectors report dated 10/9/06
FRAMING 09/29/2006 APPROVED JLEVRAULT
Note: THIS IS A REINSPECTION
FRAMING 09/25/2006 Disapproved -FEE REQUIRED JHINDMAN
Note: THIS IS A REINSPECTION finish furring, anchor windows, seal chases and top plate penetrations
H.V.A.C. ROUGH 09/25/2006 APPROVED JMCGOWEN
FRAMING 09/22/2006 Disapproved - NO FEE JLEVRAULT
Note: CANCELLED BY CONTRACTOR.
SECOND ROUGH PLUMBING INSPECTION 09/14/2006 APPROVED JGIBSON
2ND ROUGH ELECTRICAL 09/14/2006 APPROVED RMARVEL
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 09/08/2006 APPROVED - AS NOTED JLEVRAULT
Note: THIS IS A REINSPECTION STILL WAITING FOR GABLE END STRAP DETAIL AND AN APPROVED REPAIR FOR TRUSS D-1. lOOK FOR THESE DETAILS AT NEXT INSPECTION.
FIREWALL INSPECTION 09/08/2006 Disapproved - NO FEE JPATTEE
Note: THIS IS A REINSPECTION
FIREWALL INSPECTION 09/06/2006 CANCELLED BY APPLICANT JPATTEE
FIREWALL INSPECTION 09/01/2006 CANCELLED BY APPLICANT AIRS WEB
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 09/01/2006 Disapproved -FEE REQUIRED JLEVRAULT
Note: THIS IS A REINSPECTION fill 12 cells on first floor. Remove styro foam on 2nd floor to allow inspection
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 08/21/2006 APPROVED PPROVIDER
Note: Threshold inspectors report.
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 08/14/2006 Disapproved -FEE REQUIRED JLEVRAULT
Note: Approved detail needed for D-1, need detail for gable ends and strapping. Fill all downcells OK to Install tile roofing.
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 08/08/2006 Disapproved -FEE REQUIRED JLEVRAULT
Note: PROVIDE DETAIL FOR TRUSS REPAIR ON D-1 IN UNIT Br. PACK OUT STRAPS ACCORDINGLY OR RESTRAP. PROVIDE DETAIL FOR GABLE END STRAPS. NAIL 3-PLY ON BOTH SIDES.
POURED CELL 07/13/2006 APPROVED PPROVIDER
Note: Threshold inspectors report. parapit walls
LINTEL 06/27/2006 APPROVED PPROVIDER
Note: Thrershold inspectors report. 2nd floor
SECOND FLOOR SLAB INSPECTION 06/12/2006 APPROVED PPROVIDER
Note: Threshold inspectors report. 2nd floor
TIE BEAM 06/05/2006 APPROVED PPROVIDER
Note: Threshold inspectors report. 1st floor
LINTEL 05/30/2006 APPROVED PPROVIDER
Note: Threshold inspectors report. 1st floor
MONOLITHIC SLAB INSPECTION/SLAB 05/12/2006 APPROVED PPROVIDER
Note: Threshold inspectors report. 1st floor slab
FIRST ROUGH PLUMBING INSPECTION 05/05/2006 APPROVED JMCGOWEN
STEM FOOTING FOUNDATION 05/03/2006 APPROVED PPROVIDER
Note: Threshold inspectors report
FOOTER 04/20/2006 APPROVED PPROVIDER
Note: Threshold inspectors report.

Review History

Department Status Date In Date Out
BLD COMPLETE 09/12/2006 09/13/2006
Note: Released By: LWOODROME Revision: Truss repair
BLD COMPLETE 09/12/2006 09/13/2006
Note: Released By: LWOODROME Revision: Strapping detail
BLD COMPLETE 03/10/2006 03/17/2006
Note: Released By: LWOODROME
BLD HOLD 02/28/2006 03/06/2006
Note: Held By: FREODICA Comments on Permit Application No. 2006020507 (Building No. 9) 1. Provide product approval number for exterior windows, doors and garage doors. FYI: Complete product approval packets, for components and cladding, must be available, at the job site, at the time of inspection. 2. Provide details of guardrails, at balconies, that meet the requirements of FBC 1015. 3. Provide roofing application instructions per FBC 1507.4.1.2. 4. Provide electrical disconnect(s) for water heaters at garage unit A on sheet E1 and at garage unit D on E3 to match with E5.
FI1 COMPLETE 02/15/2006 02/27/2006
Note: Released By: JPATTEE

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 07/11/2007
REINSPECTION FEE ¤40.00 07/11/2007
REINSPECTION FEE ¤40.00 07/11/2007
REINSPECTION FEE ¤40.00 07/11/2007
REINSPECTION FEE ¤40.00 07/11/2007
REVISION ¤40.00 07/11/2007
REVISION ¤40.00 07/11/2007
TRANSPORTATION IMPACT FEE ¤14,560.00 03/20/2006
ADMIN FEE ¤20.00 03/20/2006
BUILDING CODE ADMIN FUND ¤100.71 03/20/2006
ELECTRIC FEE ¤952.20 03/20/2006
FIRE COMM IMPACT FEE 4-1-05 ¤9,684.27 03/20/2006
FIRE PLANS REVIEW ¤201.42 03/20/2006
MECHANICAL FEE ¤952.20 03/20/2006
PERMIT FEE ¤8,453.50 03/20/2006
PLAN CHECK FEE ¤1,767.55 03/20/2006
PLUMBING FEE ¤952.20 03/20/2006
RADON FEE ¤100.71 03/20/2006
Fees Total Due: ¤0.00 Total Paid: ¤38,024.76