I want to search for...

Permit #2006020536

Permit Details

Status: COED

Parcel Id: 07-11-31-7013-00120-0380
CONDITIONED SPACE: 2234 sqft
GARAGE: 411 sqft
OPENED PORCH (WITH ROOF) : 196 sqft
OPENED PORCH (WITH ROOF) : 41 sqft
Total Square Footage: 2882 sqft
Block: 00120
Subdivision: -
Job Phone: (386)851-7940
Location Address: 64 BRIGADOON LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/22/2006
NOC: RECORDED
Applicant name: CRAIG JON SCHMAUSS
Owner: MERCEDES HOMES

Address

775 STRICKLAND BLVD

ORANGE CITY, FL 32763

Address

#110

ORANGE CITY, FL 32763

Lot: 0380
Contracted Stated Job Value: ¤231,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

MERCEDES HOMES INC.
Status Location Address State License Number Phone Fax
CANCEL

12001 SCIENCE DRIVE #160

ORLANDO, FL 32826

CGC1510145 (Exp: 08/31/2012) (407)272-5591 (407)282-1563

Sub Contractors

STEVEN JAY SMITH
Status Location Address State License Number Phone
INACTIVE

104 West Cedar Avenue

Orange City, FL 32763

EC0001542 (Exp: 08/31/2022) (386)775-7776
EDDIE T PALMATEER
Status Location Address Mailing Address State License Number Phone Fax
CANCEL

2985 ENTERPRISE ROAD

DEBARY, FL 32713

SUITE A

DEBARY, FL 32713

CAC1813533 (Exp: 08/31/2024) (386)668-8651 (386)668-7758
KATRINA ELAINE RIEF-D'ERRICO
Status Location Address State License Number Phone
CANCEL

157 BOULDER ROCK DR

Palm Coast, FL 32137

CFC1425676 (Exp: 09/30/2008) (386)437-4250
LISA MARIE STEINER
Status Location Address State License Number Phone Fax
CANCEL

12001 SCIENCE DRIVE #160

ORLANDO, FL 32826

CGC1510145 (Exp: 08/31/2012) (407)272-5591 (407)282-1563

Inspection History

Type Request Date Result Inspector
FINAL COMPLETE BUILDING INSPECTION 08/30/2006 FINAL APPROVED ARITTER
STORMWATER FINAL INSPECTION 08/28/2006 APPROVED - AS NOTED DRANDALL
Note: 3 sf road damage...$124
UTILITY COMPANY FINAL 08/25/2006 APPROVED TSCHWEERS
DRIVEWAY 08/10/2006 APPROVED DRANDALL
RESIDENTIAL EARLY POWER 07/27/2006 APPROVED JLEVRAULT
LATH /BRICK FLASHING 06/21/2006 APPROVED MMOORE
INSULATION INSPECTION 06/19/2006 APPROVED MMOORE
ALL ROUGH 06/15/2006 APPROVED MMOORE
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 05/26/2006 APPROVED PGALLMANN
LINTEL 05/16/2006 APPROVED JLEVRAULT
FOUNDATION SURVEY APPROVED BY STORMWATER 05/15/2006 APPROVED WKINELL
MONOLITHIC SLAB INSPECTION/SLAB 05/02/2006 APPROVED JLEVRAULT
MONOLITHIC SLAB INSPECTION/SLAB 05/01/2006 Disapproved -FEE REQUIRED MMOORE
Note: NO PLANS 8:45 A.M.
FIRST ROUGH PLUMBING INSPECTION 04/28/2006 APPROVED MMOORE

Review History

Department Status Date In Date Out
SW1 HOLD 07/19/2006 07/19/2006
Note: Held By: EBLACKER We cannot complete the swale plan for this property due to a datum elevation discrepancy. Please submit revised sealed surveys for this property. We check the surveys by comparison to the city's as-built drawings. The elevations at the centerlines of the road perpendicular to the property lines are interpolated in reference to the NATIONAL GEODETIC VERTIVAL DATUM of 1929 (NGVD 1929). By applying the datum shift supplied by the VERTCON utility program for this location, expected elevations are derived relative to the NORTH AMERICAN VERTICAL DATUM of 1988 (NAVD 1988). (Note: VERTCON data is in meters and must be converted to feet by dividing by 0.3048) The derived elevations are in substantial disagreement with the data supplied on the surveys. We take into account that actual elevations may be higher than originally designed by a margin of several inches due to subsequent road paving operations but are not expected to be lower.
SW1 COMPLETE 03/16/2006 03/17/2006
Note: Released By: LAPTEKAR received right of way application
BLD COMPLETE 02/20/2006 02/27/2006
Note: Released By: CCOTE Approved for Release per plan cover sheet.
SW1 HOLD 02/16/2006 03/09/2006
Note: Held By: LAPTEKAR Right of way application has incorrect street address and lot section block...need corrected ROW
ZON COMPLETE 02/16/2006 02/20/2006
Note: Released By: JGONZALEZ
SW1 COMPLETE 07/27/2006
Note: Released By: WKINELL New s/s topo surveys/LGPs received. LGP reviewed.\\wk

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ENGINEERING ROAD DAMAGE ¤124.00 09/01/2006
EARLY POWER INSPECTION ¤40.00 09/01/2006
REINSPECTION FEE ¤40.00 09/01/2006
SW REVISION ¤40.00 09/01/2006
TRANS IMPACT FEE 4 - PER UNIT ¤3,248.51 03/22/2006
SCHOOL BOARD IMPACT FEE RES ¤3,600.00 03/22/2006
STORM WATER PERMIT FEES ¤80.00 03/22/2006
ADMIN FEE ¤20.00 03/22/2006
ARC HOUSE REVIEW ¤125.00 03/22/2006
BUILDING CODE ADMIN FUND ¤14.41 03/22/2006
ELECTRIC FEE ¤168.60 03/22/2006
FIRE RES IMPACT FEE 4-1-05 ¤173.47 03/22/2006
MECHANICAL FEE ¤168.60 03/22/2006
PERMIT FEE ¤900.90 03/22/2006
PARKS IMPACT FEE 11-2-04 ¤1,120.91 03/22/2006
PLAN CHECK FEE ¤92.40 03/22/2006
PLUMBING FEE ¤168.60 03/22/2006
RADON FEE ¤14.41 03/22/2006
Fees Total Due: ¤0.00 Total Paid: ¤10,139.81