Permit #2006020602
Permit Details
Status: COED
| CONDITIONED SPACE: 3813 sqft |
| GARAGE: 461 sqft |
| OPENED PORCH (WITH ROOF) : 223 sqft |
| OPENED PORCH (WITH ROOF) : 201 sqft |
| OPENED PORCH (WITH ROOF) : 383 sqft |
| Total Square Footage: 5081 sqft |
| Subdivision: 2068 - Village G-2 at Grand Haven |
| Job Phone: (386) 445-4408 |
| Location Address: 70 RIVER TRAIL DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/31/2006 |
| NOC: RECORDED |
| Applicant name: PATRICK E KOLLAR |
| Owner: ANDRIUS DONELLA |
|
Address 10717 JORDAN ROAD CARMEL, IN 46032 |
| Contracted Stated Job Value: ¤565,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
RED CARPET CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
8A Market Place Court Palm Coast, FL 32137 |
CRC017457 (Exp: 08/31/2026) | (386) 445-4408 | (386)446-2232 |
Sub Contractors
BEN K REIHL
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
605 MCINTOSH ROAD Ormond Beach, 32174 |
EC0002867 (Exp: 08/31/2026) | (386) 677-4464 | 386-673-4199 |
LARRY MILTON HISS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1315 A LPGA BLVD Holly Hill, FL 32117 |
CAC032450 (Exp: 08/31/2018) | (386) 672-8688 | (386)238-8688 |
GARY S WELBORN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1709 North Nova Road Holly Hill, FL 32117 |
CFC037140 (Exp: 08/31/2018) | (386) 257-1172 | (386)252-5979 |
BARRY D MARTIN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1650 N STATE STREET Bunnell, FL 32110 |
CCC033728 (Exp: 08/31/2020) | (386) 437-7700 | (386)437-7701 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 08/14/2007 | FINAL APPROVED | JGIBSON |
| STORMWATER FINAL INSPECTION | 08/09/2007 | APPROVED | DRANDALL |
| Note: THIS IS A REINSPECTION | |||
| STORMWATER FINAL INSPECTION | 07/25/2007 | Disapproved -FEE REQUIRED | DRANDALL |
| Note: place sod on rear bank, after hand grading, stagger sod joints & pin to stabilize.....remove silt fence | |||
| UTILITY COMPANY FINAL | 07/18/2007 | APPROVED | TSCHWEERS |
| Note: Francine called in inspection | |||
| RESIDENTIAL EARLY POWER | 07/18/2007 | APPROVED | LHITES |
| Note: Francine called in inspection | |||
| INSULATION INSPECTION | 02/02/2007 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| INSULATION INSPECTION | 01/30/2007 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: NEED FIRESTOP IN M-BATH, SUPPORT A/C DUCT IN M-BATH | |||
| ALL ROUGH | 01/23/2007 | APPROVED - AS NOTED | JMCGOWEN |
| Note: THIS IS A REINSPECTION STILL NEED MASTER BATH EX. FAN DUCT, MOVE SPA OUTLET, FIREBLOCK IN MASTER BATH | |||
| ALL ROUGH | 01/16/2007 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: strap/support nm cable every 4.5ft. rewmove loops at j-boxes. recheck rec. spacing onkitchen counter. remove nm cable from housing of recessed cans. 2ft or more requires a rec. all white conductors used a s hots need to bge marked as such. need an anti- scald vavle for sprayer on spa tub. recheck nail plates on electric and piping. spa tub motor will need to be removable without damaging nm cable. ex. fan master bath missing duct. | |||
| LATH /BRICK FLASHING | 11/14/2006 | APPROVED | JGIBSON |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 10/20/2006 | APPROVED | JGIBSON |
| RESIDENTIAL EARLY POWER | 10/18/2006 | APPROVED - AS NOTED | JGIBSON |
| Note: This is a tug for temp power. | |||
| PARTIAL TIE BEAM/LINTEL | 08/01/2006 | APPROVED | JMCGOWEN |
| LINTEL | 07/27/2006 | APPROVED | JMCGOWEN |
| Note: | |||
| LINTEL | 06/22/2006 | APPROVED | JMCGOWEN |
| LINTEL | 06/15/2006 | APPROVED | JMCGOWEN |
| FLOOD ZONE 'A' ELEVATION CERTIFICATE APPROVAL | 06/06/2006 | APPROVED | CBENTLEY |
| MONOLITHIC SLAB INSPECTION/SLAB | 05/16/2006 | APPROVED | CMINI |
| FIRST ROUGH PLUMBING INSPECTION | 05/10/2006 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 09/19/2006 | 09/19/2006 |
| Note: Released By: CCOTE Approved for Release. REVISION: Connector change for balcony side header to house. | |||
| BLD | CANCEL | 09/15/2006 | |
| BLD | COMPLETE | 09/06/2006 | 09/11/2006 |
| Note: Released By: CCOTE Approved for Release. REVISION: Revised sheeet A9. | |||
| BLD | COMPLETE | 08/25/2006 | 08/28/2006 |
| Note: Released By: CCOTE Approved for Release. REVISION: connector change at header to column at balcony. | |||
| BLD | COMPLETE | 06/16/2006 | 06/20/2006 |
| Note: Released By: LWOODROME Revision: Connector schedule | |||
| BLD | COMPLETE | 04/06/2006 | 04/11/2006 |
| Note: Released By: CCOTE Approved for Release. Revision: Floor plan changes. | |||
| BLD | COMPLETE | 03/27/2006 | 03/29/2006 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. | |||
| BLD | HOLD | 03/21/2006 | 03/22/2006 |
| Note: Held By: CCOTE Held per fax comments sent 3/22/06. | |||
| BLD | HOLD | 03/09/2006 | 03/15/2006 |
| Note: Held By: CCOTE The City received your revised drawing per the previous comments however the following items were not addressed and/or need further information to be submitted in order to complete the Building Permit Application plan review. Old items that have been addressed and need no further information are show as strikethrough; new notes are shown in bold italic. CITY OF PALM COAST o 2 COMMERCE BLVD o PALM COAST, FL 32164 PHONE: 386-986-3780 o FAX: 386-986-3781 1. The drawings contain two interior bearing wall details, one on A8 and one on S1. They are different clarify if both are to be used and if so denote locations on plan. Also, the foundation plan indicates anchor bolt spacing that only matches on of the sections. 2. Provide sizes of all Beams including those identified as beams by builder, on a signed and sealed drawing. 3. Provide connectors for all beams on a signed and sealed drawing. Connectors were identified on the beam schedule however the following issues were found: a. Beam 1 - Connection 2: Schedule calls for "Face mount hanger by truss company" and the drawings call for an HGUS5.50/14 hanger. Clarify what shall be used. b. Beam 2 - Connection1: Schedule calls for a WM Bucket hanger. Provide specific WM hanger to use. In addition this beam has uplift transferred down from roof trusses above and WM hangers do not have much uplift capacity therefore verification is needed that this hanger can accommodate the imposed loads on it. c. Beam 2 - Connection 2: Connection 2: Schedule calls for "Face mount hanger by truss company" and the drawings appear to show this beam sitting on a wood framed bearing wall so therefore a connector will need to be specified. d. Beam 3 - Connection 1: Schedule calls for "Face mount hanger by truss company" and the drawings indicate a WM hanger since no face mount exists therefore update schedule and provide specific WM hanger to be used. e. Beam 3 - Connection 2: Schedule calls for "Face mount hanger by truss company" and the drawings call for an HGUS412 hanger. Clarify what shall be used. f. Beam 4 - Connection 1: Schedule calls for a META18 hanger and it appears this beam supports roof trusses therefore it must be capable of transferring uplift loads. Since the META18 hanger is only capable of low uplifts loads verification is needed that this hanger can accommodate the imposed loads on it g. Beam 4 - Connection 2: Schedule calls for "Face mount hanger by truss company" and the drawings call for an HGUS412 hanger. Clarify what shall be used. h. Beam 5 - Connection 2: This end identifies no connection just 4" of bearing. This beam supports beam 4 that has uplift that needs to be transferred down therefore uplift exists and a connector is required. i. Beam 6 - Connection 1: Schedule calls for a WM Bucket hanger. Provide specific WM hanger to use. j. Beam 6 - Connection 2: Schedule calls for "Face mount hanger by truss company" and the drawings call for an HGUS412 hanger. Clarify what shall be used. k. Beam 8 - Connection 2: Schedule calls for "Face mount hanger by truss company" and the drawings call for an HGUS412 hanger. Clarify what shall be used. 4. Some of the code references are incorrect. Please correct electrical Code, current is NEC 2002. 5. Sheet S3 references Florida Building Code 2002 which is incorrect. 6. T25 calls for a HTT22 Top and Bottom at exterior wall. How are these installed; is there a column here and are these for the top and bottom of the column? Is there an additional connector to be used to connect the truss to the column? In addition this truss appears to be over the doorway so how is load transferred down and around doorway to B2? A detail was submitted 'stacked studs' however this detail does not apply to this project since these trusses bear over door opening. The connector specified will not fit in allocated space and it is not specified how the uplift loads is transferred around the opening; how the base of the sides of openings are connected to Beam 2; how the wall base is attached to Beam 2. 7. T25 calls for an HGT-2 at the rear porch and it is not clear if this rear porch is wood or masonry framed. If wood framed then a beam size is required as well as additional information as to how HGT-2 is attached to the beam. A note was added to the floor plan A3 to provide a double 2x12 header around balcony. However it is still not clear how this is attached to the wood beam. Will an additional connector be used attached to the side of the beam or will the beam be drilled out and threaded rod installed with a washer and nut. Clarify installation and provide additional connectors/washers/nuts etc. Also no information is given as to how this header is connected at the ends; are there columns if so what are they and how are the post bottom connected to wall below? In addition this detail calls for a HTTS22 connector which I cannot find in the Simpson catalog. 8. T28 calls for a HTT22 Top and Bottom at exterior wall. How are these installed; is there a column here and are these for the top and bottom of the column? Is there an additional connector to be used to connect the truss to the column? In addition this truss appears to be over a window so how is load transferred down and around doorway to B2? A detail was submitted 'stacked studs' however this detail does not apply to this project since these trusses bear over door opening. The connector specified will not fit in allocated space and it is not specified how the uplift loads is transferred around the opening; how the base of the sides of openings are connected to Beam 2; how the wall base is attached to Beam 2. 9. T28 calls for an HGT-3 at the rear porch and it is not clear if this rear porch is wood or masonry framed. If wood framed then a beam size is required as well as additional information as to how HGT-3 is attached to the beam. A note was added to the floor plan A3 to provide a double 2x12 header around balcony. However it is still not clear how this is attached to the wood beam. Will an additional connector be used attached to the side of the beam or will the beam be drilled out and threaded rod installed with a washer and nut. Clarify installation and provide additional connectors/washers/nuts etc. Also no information is given as to how this header is connected at the ends; are there columns if so what are they and how are the post bottom connected to wall below? In addition this detail calls for a HTTS22 connector which I cannot find in the Simpson catalog. 10. T28 calls for an HGT-3 at the front and it is not clear how the load is transferred down to the foundation. Please provide additional information such as column size and other connectors to be used. No post or additional connectors are identified nor a threaded rod. The drawings show a wood framed wall bearing on Beam 5 therefore connectors are need so supplement the HGT-3 as well as information as to how load is connected to Beam 5 and how Beam 5 ends are connected to transfer load down. 11. T292 calls for an HGT-2 at the rear porch and it is not clear if this rear porch is wood or masonry framed. If wood framed then a beam size is required as well as additional information as to how HGT-2 is attached to the beam. A note was added to the floor plan A3 to provide a double 2x12 header around balcony. However it is still not clear how this is attached to the wood beam. Will an additional connector be used attached to the side of the beam or will the beam be drilled out and threaded rod installed with a washer and nut. Clarify installation and provide additional connectors/washers/nuts etc. Also no information is given as to how this header is connected at the ends; are there columns if so what are they and how are the post bottom connected to wall below? 12. Provide better clarification as to which walls are wood framed and which walls are masonry framed on the floor plans. Drawings clearly show each type now however additional information is required as to how the wood framed walls are connected to structure (wood beams, bond beams) below. 13. Lintels over entry and lanai are not identified with a lintel mark. 14. Detail 4/A8 needs clarification. It shows a PT ledger board attached to hollow masonry units. Provide specific size of ledger board to be used and verification that Dyna Bolts will be installed into hollow masonry units. 15. Provide connectors to be used to secure floor joists to beams, ledgers and walls. Item not addressed. Please provide information. 16. NEW ITEM Sheet A9 was changed to state connectors "Simpson or Equal or Better" Or Equal language is not acceptable and needs to be removed since all alternate connectors than those specified must be reviewed and approved by the engineer/architect of record. It would be acceptable to list equivalent connectors to be used in lieu of each specific simpson connector specified. | |||
| PLFM | COMPLETE | 03/08/2006 | 03/17/2006 |
| Note: Released By: CBENTLEY Flood Zone A-5, please provide elevation certificate elevation certificate received | |||
| BLD | HOLD | 02/24/2006 | 03/02/2006 |
| Note: Held By: CCOTE The following items must be submitted in order to complete the Building Permit Application plan review. 1. The drawings contain two interior bearing wall details, one on A8 and one on S1. They are different clarify if both are to be used and if so denote locations on plan. Also, the foundation plan indicates anchor bolt spacing that only matches on of the sections. 2. Provide sizes of all Beams including those identified as beams by builder, on a signed and sealed drawing. 3. Provide connectors for all beams on a signed and sealed drawing. 4. Some of the code references are incorrect. Please correct electrical Code, current is NEC 2002. 5. Sheet S3 references Florida Building Code 2002 which is incorrect. 6. T25 calls for a HTT22 Top and Bottom at exterior wall. How are these installed; is there a column here and are these for the top and bottom of the column? Is there an additional connector to be used to connect the truss to the column? In addition this truss appears to be over the doorway so how is load transferred down and around doorway to B2? 7. T25 calls for an HGT-2 at the rear porch and it is not clear if this rear porch is wood or masonry framed. If wood framed then a beam size is required as well as additional information as to how HGT-2 is attached to the beam. 8. T28 calls for a HTT22 Top and Bottom at exterior wall. How are these installed; is there a column here and are these for the top and bottom of the column? Is there an additional connector to be used to connect the truss to the column? In addition this truss appears to be over a window so how is load transferred down and around doorway to B2? 9. T28 calls for an HGT-3 at the rear porch and it is not clear if this rear porch is wood or masonry framed. If wood framed then a beam size is required as well as additional information as to how HGT-3 is attached to the beam. 10. T28 calls for an HGT-3 at the front and it is not clear how the load is transferred down to the foundation. Please provide additional information such as column size and other connectors to be used. 11. T292 calls for an HGT-2 at the rear porch and it is not clear if this rear porch is wood or masonry framed. If wood framed then a beam size is required as well as additional information as to how HGT-2 is attached to the beam. 12. Provide better clarification as to which walls are wood framed and which walls are masonry framed on the floor plans. 13. Lintels over entry and lanai are not identified with a lintel mark. 14. Detail 4/A8 needs clarification. It shows a PT ledger board attached to hollow masonry units. Provide specific size of ledger board to be used and verification that Dyna Bolts will be installed into hollow masonry units. 15. Provide connectors to be used to secure floor joists to beams, ledgers and walls. | |||
| URB | COMPLETE | 02/22/2006 | 02/24/2006 |
| Note: Released By: CBENNETT | |||
| SW1 | COMPLETE | 02/17/2006 | 03/08/2006 |
| Note: Released By: LAPTEKAR Flood zone A....changed inspection to 103 | |||
| ZON | COMPLETE | 02/17/2006 | 02/22/2006 |
| Note: Released By: JGONZALEZ |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | ¤40.00 | 08/15/2007 |
| EARLY POWER INSPECTION | ¤40.00 | 08/15/2007 |
| EARLY POWER INSPECTION | ¤40.00 | 08/15/2007 |
| REINSPECTION FEE | ¤40.00 | 08/15/2007 |
| REINSPECTION FEE | ¤40.00 | 08/15/2007 |
| REVISION | ¤40.00 | 08/15/2007 |
| REVISION | ¤40.00 | 08/15/2007 |
| REVISION | ¤40.00 | 08/15/2007 |
| REVISION | ¤40.00 | 08/15/2007 |
| REVISION | ¤40.00 | 08/15/2007 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 08/15/2007 |
| TRANS IMPACT FEE 4 - PER UNIT | ¤3,248.51 | 03/31/2006 |
| ADMIN FEE | ¤20.00 | 03/31/2006 |
| BUILDING CODE ADMIN FUND | ¤25.41 | 03/31/2006 |
| ELECTRIC FEE | ¤369.00 | 03/31/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 03/31/2006 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/31/2006 |
| FIRE RES IMPACT FEE 4-1-05 | ¤173.47 | 03/31/2006 |
| MECHANICAL FEE | ¤369.00 | 03/31/2006 |
| PERMIT FEE | ¤2,203.50 | 03/31/2006 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 03/31/2006 |
| PLAN CHECK FEE | ¤226.00 | 03/31/2006 |
| PLUMBING FEE | ¤369.00 | 03/31/2006 |
| RADON FEE | ¤25.41 | 03/31/2006 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤12,265.21 |