I want to search for...
Permit #2006020605
Permit Details
Status: COED
| Parcel Id: 07-11-31-7030-00770-0090 |
| CONDITIONED SPACE: 2050 sqft |
| GARAGE: 455 sqft |
| OPENED PORCH (WITH ROOF) : 185 sqft |
| OPENED PORCH (WITH ROOF) : 45 sqft |
| Total Square Footage: 2735 sqft |
| Block: 00770 |
| Subdivision: - |
| Job Phone: (386)447-8680 |
| Location Address: 11 RAMBLING LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/31/2006 |
| NOC: RECORDED |
| Applicant name: MICHAEL LEO BRANIFF |
| Owner: SAGHEER & LINDA RIZVI |
|
Address 7825 SW 72ND AVE MIAMI, FL 33143 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤191,450.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
RIVER CITY HOMES
| Status | Location Address | State License Number | Phone |
| CANCEL |
12058 SAN JOSE BLVD #804 Jacksonville, FL 32223 |
CGC062728 (Exp: 08/31/2012) | 904-260-9009 |
Sub Contractors
PETER JOSEPH LYDEN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
PO BOX 1009 BUNNELL, FL 32110 |
EC0002436 (Exp: 08/31/2014) | (386) 931-2568 | 386-313-3445 |
SCOTT RICHARD GATTIE
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1508 CLAPTON DR DELAND, FL 32720 |
CFC057990 (Exp: 08/31/2010) | (386)740-9227 | (386)740-9228 |
MICHAEL DAVID CLARK
| Status | Location Address | State License Number | Phone |
| CANCEL |
P. O. Box 918 Bunnell, FL 32110 |
CAC044867 (Exp: 09/30/2008) | (386) 437-2001 |
BARRY D MARTIN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1650 N STATE STREET Bunnell, FL 32110 |
CCC033728 (Exp: 08/31/2020) | (386) 437-7700 | (386)437-7701 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 11/07/2006 | FINAL APPROVED | JHINDMAN |
| UTILITY COMPANY FINAL | 11/02/2006 | APPROVED | TREESE |
| STORMWATER FINAL INSPECTION | 11/01/2006 | APPROVED - AS NOTED | GLALIMA |
| Note: THIS IS A REINSPECTION 24 FEET ROAD DAMAGE . = 292.00 | |||
| UTILITY COMPANY FINAL | 11/01/2006 | Disapproved - NO FEE | MBACON |
| Note: FAILED, NO CLEAN OUT BEHIND TANK | |||
| RESIDENTIAL EARLY POWER | 11/01/2006 | APPROVED | JHINDMAN |
| Note: | |||
| STORMWATER FINAL INSPECTION | 10/30/2006 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: CLEAN ALL OF ROAD SO I CAN ASSESS DAMAGE . MAKE A MORE DEFINED SWALE . RIGHT SIDE FROM CENTER | |||
| DRIVEWAY | 09/14/2006 | APPROVED | GLALIMA |
| LATH /BRICK FLASHING | 09/06/2006 | CANCELLED BY INSPECTOR | JHINDMAN |
| Note: already passed | |||
| LATH /BRICK FLASHING | 09/05/2006 | APPROVED | JHINDMAN |
| INSULATION INSPECTION | 08/28/2006 | APPROVED | ACOOPER |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 08/22/2006 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 08/22/2006 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 08/18/2006 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: THIS IS A REINSPECTION truss e04 htt16s still missing at sill plate. | |||
| ALL ROUGH | 08/18/2006 | Disapproved - NO FEE | JHINDMAN |
| Note: cannot pass rough until roof sheathing passes | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 08/09/2006 | Disapproved -FEE REQUIRED | CMINI |
| Note: THIS IS A REINSPECTION.3,hts30s still missing each side of truss e-04 to post. htt16 still needed at sill per plan.threaded rods still loose in areas.mgt nut still loose over tub.loose sheets check marked walls. not ready. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 07/28/2006 | Disapproved -FEE REQUIRED | CMINI |
| Note: NEED TO TIGHTEN THREADED RODS.MISSING PARALLAM POSTS PER PLAN. MISSING 3 HTS30 STRAPS EACH SIDE OF TRUSS E-04,HTT16 AT SILL PER PLAN. MGT NUT LOOSE AT BD.RM. #3,LOOSE SHEETS AT BD.RM.#2,#3. NEED TO OVERLAP TOP PLATES AT EXT.NOOK 45 WALL. NOT READY. | |||
| LINTEL | 07/07/2006 | APPROVED | CMINI |
| PARTIAL TIE BEAM/LINTEL | 07/07/2006 | APPROVED | CMINI |
| FOUNDATION SURVEY APPROVED BY STORMWATER | 06/30/2006 | APPROVED | LAPTEKAR |
| MONOLITHIC SLAB INSPECTION/SLAB | 06/22/2006 | APPROVED | CMINI |
| FIRST ROUGH PLUMBING INSPECTION | 06/19/2006 | APPROVED | JHINDMAN |
| PRE DRIVEWAY | 06/08/2006 | APPROVED - AS NOTED | GLALIMA |
| Note: Builder wants opinion about proposed FFE of 29.73' Builder stated that their company Engineer was going to re-evaluate the proposed elevation. |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 03/20/2006 | 03/21/2006 |
| Note: Released By: LAPTEKAR New topo received...FFE adjusted | |||
| BLD | COMPLETE | 02/23/2006 | 02/28/2006 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Auba. | |||
| ZON | COMPLETE | 02/20/2006 | 02/23/2006 |
| Note: Released By: ECOYNE | |||
| SW1 | HOLD | 03/08/2006 | |
| Note: Held By: LAPTEKAR The proposed elevations in the rear yard are too high in relation to the proposed FFE....Florida building code requires the grade away from the foundation walls to fall a minimum of 6" within the first 10'. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ENGINEERING ROAD DAMAGE | ¤292.00 | 11/09/2006 |
| EARLY POWER INSPECTION | ¤40.00 | 11/09/2006 |
| REINSPECTION FEE | ¤40.00 | 11/09/2006 |
| REINSPECTION FEE | ¤40.00 | 11/09/2006 |
| REINSPECTION FEE | ¤40.00 | 11/09/2006 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 11/09/2006 |
| TRANS IMPACT FEE 4 - PER UNIT | ¤3,248.51 | 03/31/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 03/31/2006 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/31/2006 |
| ADMIN FEE | ¤20.00 | 03/31/2006 |
| ARC HOUSE REVIEW | ¤125.00 | 03/31/2006 |
| BUILDING CODE ADMIN FUND | ¤13.68 | 03/31/2006 |
| ELECTRIC FEE | ¤150.00 | 03/31/2006 |
| FIRE RES IMPACT FEE 4-1-05 | ¤173.47 | 03/31/2006 |
| MECHANICAL FEE | ¤150.00 | 03/31/2006 |
| PERMIT FEE | ¤780.00 | 03/31/2006 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 03/31/2006 |
| PLAN CHECK FEE | ¤80.00 | 03/31/2006 |
| PLUMBING FEE | ¤150.00 | 03/31/2006 |
| RADON FEE | ¤13.68 | 03/31/2006 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,192.25 |