Permit #2006030141
Permit Details
Status: COED
| Parcel Id: 29-10-31-5540-01010-0980 |
| CONDITIONED SPACE: 2752 sqft |
| GARAGE: 548 sqft |
| OPENED PORCH (WITH ROOF) : 369 sqft |
| OPENED PORCH (WITH ROOF) : 171 sqft |
| Total Square Footage: 3840 sqft |
| Block: 1010 |
| Subdivision: 1005 - SANCTUARY |
| Job Phone: (386) 445-7001 |
| Location Address: 8 OLD OAK DR N |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/25/2006 |
| NOC: RECORDED |
| Applicant name: RICHARD M. ANDERSON |
| Owner: THOMAS R ANDERSON |
|
Address 8 CARLOS COURT PALM COAST, FL 32137 |
| Lot: 0980 |
| Contracted Stated Job Value: ¤310,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
PALM WEST HOME BUILDERS, INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 Florida Park Drive North Palm Coast, FL 32137 |
CRC054633 (Exp: 08/31/2026) | (386) 445-7001 | (386)446-5941 |
Sub Contractors
JOHN S SMITH
| Status | Location Address | State License Number |
| CANCEL |
P. O. BOX 1160 Bunnell, FL 32110 |
ER0007785 (Exp: 08/31/2015) |
MICHAEL G MORELLO JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2 HARGROVE GRADE PALM COAST, FL 32137 |
CAC014293 (Exp: 08/31/2014) | (386)447-3950 | (386)446-4614 |
THOMAS WALTER ALBANO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 352075 Palm Coast, FL 32135 |
CFC045991 (Exp: 08/31/2024) | 386-437-2795 | (386)437-2781 |
STEPHEN M RENDE
| Status | Location Address | State License Number | Phone |
| CANCEL |
22 ALAMANDA DRIVE ORMOND, FL 32176 |
CCC058058 (Exp: 08/31/2020) | 386-439-7156 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 03/05/2010 | FINAL APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| FINAL COMPLETE BUILDING INSPECTION | 02/26/2010 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Ritchie from Palm West called to schedule this inspection Inspection Resulted at 2/26/2010 12:53:47 PM TOILETS NOT GROUTED/INSTALL LAUNDRY ROOM SINK PER PLAN/ATTIC ACCESS COVER NOT FIRE-RATED/NO POWER AT SINGLE OUTLET FOR RE-CIRCULATING PUMP WATER HEATER/MISSING LIGHT IN MASTER CLOSET PER PLAN/MISSING LIGHT IN FUTURE SAUNA PER PLAN/WIRE AND BOX AT EXTERIOR WALL POOL PUMP NOT RATED FOR CURRENT USE-REMOVE AND INSTALL PROPER OUTLET | |||
| UTILITY COMPANY FINAL | 02/12/2010 | APPROVED | TSCHWEERS |
| Note: THIS IS A REINSPECTION Richie from Palm West called to schedule this inspection | |||
| STORMWATER FINAL INSPECTION | 01/14/2010 | APPROVED | JCOLASANTI |
| PROJECT STATUS INSPECTION | 01/07/2010 | Disapproved - NO FEE | DROCKWELL |
| Note: Inspection Resulted at 1/7/2010 12:29:07 PM HOUSE APPEARS READY FOR A FINAL BUILDING INSPECTION | |||
| PROJECT STATUS INSPECTION | 01/07/2009 | Disapproved - NO FEE | DROCKWELL |
| Note: Inspection Resulted at 1/7/2009 1:32:16 PM HOUSE IS COMPLETE WITH THE EXCEPTION OF FLOOR COVERINGS/APPLIANCES/LANDSCAPING/EXTERIOR FINAL PAINTING/SITE APPEARS SECURE AND SAFE.NO ONGOING WORK AT THIS TIME | |||
| RESIDENTIAL EARLY POWER | 04/11/2008 | APPROVED | LHITES |
| UTILITY COMPANY FINAL | 12/11/2007 | CANCELLED BY APPLICANT | TSCHWEERS |
| Note: Cancelled by builder 12/11 1/29, utility cancelled per Barbie Bembry. | |||
| INSULATION INSPECTION | 03/21/2007 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| INSULATION INSPECTION | 03/20/2007 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: all approved plans, including energy sheets need to be on the job. | |||
| ALL ROUGH | 02/20/2007 | APPROVED - AS NOTED | LHITES |
| Note: THIS IS A REINSPECTION NEED FIRESTOP AT GARAGE HEIGHT CEILING BEHIND NITCH, NEED TO CAP 1" PVC COMING OUT OF PANEL, NEED NAIL PLATE OVER ATLEAST SER AT PANEL, WILL CHECK AT INSULATION | |||
| ALL ROUGH | 02/06/2007 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: NEED REVISION FOR FRONT DOOR HEADER, FIRESTOP OF DINING BEHIND NITCH, ARCH COLUMNS, AND SMART BOX CONNECTION BOX, NEED JUMPER BETWEEN GROUND BARS | |||
| LATH /BRICK FLASHING | 11/16/2006 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| LATH /BRICK FLASHING | 11/14/2006 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: Must have 2 layers for moisture barrier. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 10/13/2006 | APPROVED | LHITES |
| LINTEL | 08/25/2006 | APPROVED | LHITES |
| Note: THIS IS A REINSPECTION | |||
| LINTEL | 08/24/2006 | Disapproved -FEE REQUIRED | LHITES |
| Note: THIS IS A REINSPECTION RITCHIE CALLED TO SCHEDULE A LINTEL FOR 8/24/06 need approved revision from city | |||
| LINTEL | 08/04/2006 | CANCELLED BY APPLICANT | JMCGOWEN |
| Note: THIS IS A REINSPECTION Richie called to cancel | |||
| LINTEL | 08/02/2006 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: need 4 inches of bearing for headers resting on colum block in front need revision from cast-cretes enginer | |||
| FOUNDATION SURVEY APPROVED BY STORMWATER | 06/19/2006 | APPROVED | WKINELL |
| MONOLITHIC SLAB INSPECTION/SLAB | 06/05/2006 | APPROVED | JMCGOWEN |
| FIRST ROUGH PLUMBING INSPECTION | 06/01/2006 | APPROVED | JMCGOWEN |
| Note: THIS IS A REINSPECTION | |||
| FIRST ROUGH PLUMBING INSPECTION | 05/31/2006 | CANCELLED BY APPLICANT | JMCGOWEN |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 02/15/2007 | 02/19/2007 |
| Note: Released By: CCOTE Approved for Release. REVISION: Door opening modification detail. | |||
| BLD | COMPLETE | 08/22/2006 | 08/22/2006 |
| Note: Released By: CCOTE Approved for Release. REVISION: Engineering letter from cast-crete regarding bearing of lintel at front entry. | |||
| BLD | COMPLETE | 04/17/2006 | 04/24/2006 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Fred R. | |||
| URB | HOLD | 03/13/2006 | 03/20/2006 |
| Note: Held By: CBENNETT 3/20/06 CB We inspected this property there are trees located on siie which are not shown on your sitie plan. Please send a revised site plan show ALL INDEX TREES. 3/27/06 (CG) PLEASE CORRECT AND RESUBMIT PLAN SO WE CAN MOVE THIS PERMIT ON. THANKS. | |||
| ZON | COMPLETE | 03/13/2006 | 03/13/2006 |
| Note: Released By: HHERKERT Plant schedule not required, has own HOA | |||
| PLFM | COMPLETE | 03/10/2006 | 03/17/2006 |
| Note: Released By: CBENTLEY | |||
| SW1 | COMPLETE | 03/03/2006 | 03/15/2006 |
| Note: Released By: WKINELL | |||
| ZON | HOLD | 03/03/2006 | 03/10/2006 |
| Note: Held By: ECOYNE need plant schedule called spoke with Fred this date need elevation certificate | |||
| URB | COMPLETE | 04/24/2006 | |
| Note: Released By: CBENNETT |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | ¤40.00 | 03/17/2010 |
| EXTENSION | ¤40.00 | 03/17/2010 |
| EXTENSION | ¤40.00 | 03/17/2010 |
| EXTENSION | ¤40.00 | 03/17/2010 |
| EXTENSION | ¤40.00 | 03/17/2010 |
| EXTENSION | ¤40.00 | 03/17/2010 |
| EXTENSION | ¤40.00 | 03/17/2010 |
| REINSPECTION FEE | ¤40.00 | 03/17/2010 |
| REINSPECTION FEE | ¤40.00 | 03/17/2010 |
| REINSPECTION FEE | ¤40.00 | 03/17/2010 |
| REINSPECTION FEE | ¤40.00 | 03/17/2010 |
| REINSPECTION FEE | ¤40.00 | 03/17/2010 |
| REINSPECTION FEE | ¤40.00 | 03/17/2010 |
| RENEW PERMIT FEES | ¤40.00 | 03/17/2010 |
| REVISION | ¤40.00 | 03/17/2010 |
| REVISION | ¤40.00 | 03/17/2010 |
| RENEW PERMIT FEES | ¤40.00 | 12/13/2007 |
| FIRE RES IMPACT FEE 4-1-05 | ¤173.47 | 04/25/2006 |
| MECHANICAL FEE | ¤216.00 | 04/25/2006 |
| PERMIT FEE | ¤1,209.00 | 04/25/2006 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 04/25/2006 |
| PLAN CHECK FEE | ¤124.00 | 04/25/2006 |
| PLUMBING FEE | ¤216.00 | 04/25/2006 |
| RADON FEE | ¤19.20 | 04/25/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 04/25/2006 |
| STORM WATER PERMIT FEES | ¤80.00 | 04/25/2006 |
| TRANS IMPACT FEE 4 - PER UNIT | ¤3,248.51 | 04/25/2006 |
| ADMIN FEE | ¤20.00 | 04/25/2006 |
| ARC HOUSE REVIEW | ¤125.00 | 04/25/2006 |
| BUILDING CODE ADMIN FUND | ¤19.20 | 04/25/2006 |
| ELECTRIC FEE | ¤216.00 | 04/25/2006 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤11,067.29 |