I want to search for...
Permit #2006040421
Permit Details
Status: COED
| Parcel Id: 07-11-31-7033-00470-0090 |
| CONDITIONED SPACE: 2473 sqft |
| GARAGE: 619 sqft |
| OPENED PORCH (WITH ROOF) : 318 sqft |
| OPENED PORCH (WITH ROOF) : 67 sqft |
| Total Square Footage: 3477 sqft |
| Block: 00470 |
| Subdivision: - |
| Job Phone: (386) 445-2222 |
| Location Address: 17 RENMONT CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/03/2006 |
| NOC: RECORDED |
| Applicant name: MICHAEL STEPHAN MULLEN |
| Owner: WENDY HASSOCK A SINGLE PERSON AND RUSSELL JENKINS |
|
Address A SINGLE PERSON CORAL SPRINGS, FL 33065 |
|
Address 100101 NW 36TH ST CORAL SPRINGS, FL 33065 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤130,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
TOWN & COUNTRY HOMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1 Enterprise Drive Bunnell, FL 32110 |
CGC049972 (Exp: 08/31/2026) | (386) 445-2222 |
Sub Contractors
DANIEL P HUCKS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
400 N. U.S. 1 Ormond Beach, FL 32174 |
CAC029376 (Exp: 08/31/2024) | 386-672-8494 | 386-673-7856 |
STEVEN DUANE DENSLOW
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
400 N. US # 1 Ormond Beach, FL 32174 |
EC0001678 (Exp: 08/31/2012) | (386) 672-8494 | (386)673-7856 |
DENNIS GENE GAINEY
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P.O. BOX 1203 Bunnell, FL 32110 |
CFC046004 (Exp: 08/31/2026) | (386) 437-5637 | 386-437-3012 |
EUGENIA MAY MILHOLEN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
P. O. Box 2088 Bunnell, FL 32110 |
CCC048174 (Exp: 08/31/2010) | (386) 437-6457 | (386)437-6457 |
Inspection History
| Type | Request Date | Result | Inspector |
| STORMWATER FINAL INSPECTION | 06/05/2007 | FINAL APPROVED | GLALIMA |
| Note: check for road repair/ GARY WAIVED THE ROAD DAMAGE FEE IT'S OK TO FINAL | |||
| FINAL COMPLETE BUILDING INSPECTION | 06/04/2007 | FINAL APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| FINAL COMPLETE BUILDING INSPECTION | 05/31/2007 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: List on mobile hwy...In permit box | |||
| STORMWATER FINAL INSPECTION | 05/30/2007 | APPROVED - AS NOTED | GLALIMA |
| Note: NEW DRIVE / 60' FEET ROAD DAMAGE = 580.00. READY FOR FINAL | |||
| PRE DRIVEWAY | 05/22/2007 | APPROVED | DRANDALL |
| STORMWATER FINAL INSPECTION | 05/07/2007 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: REMOVE CULVERT PIPE AND REPLACE . CITY DID RECHECK ELEVATIONS AT TIME OF INSPECTION . REPLACE ALL DEAD SOD AS NEEDED . | |||
| RESIDENTIAL EARLY POWER | 05/04/2007 | APPROVED | RMARVEL |
| Note: | |||
| UTILITY COMPANY FINAL | 05/04/2007 | APPROVED | MBACON |
| RESIDENTIAL EARLY POWER | 05/02/2007 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: NO ACCESS TO HOUSE FOR INSPECTION. ALUMINUM CONDUCTORS NEED TO BE COATED WITH ANTI OXIDENT AT CONNECTION POINTS. NOT JUST ONE SIDE. RECHECK METER CONNECTIONS. | |||
| PRE DRIVEWAY | 04/12/2007 | APPROVED - AS NOTED | GLALIMA |
| Note: RECHECK YOUR ELEVATIONS , I DID CALL APRIL 13 / 07 AND APRIL 16/ 07 READY TO POUR. Meet with Builder 4/30/07.//wk | |||
| LATH /BRICK FLASHING | 02/16/2007 | APPROVED | ACOOPER |
| INSULATION INSPECTION | 02/01/2007 | APPROVED | PGALLMANN |
| ALL ROUGH | 01/25/2007 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 01/03/2007 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: truss engineering and plans do not show hanging of air handler from trusses | |||
| ALL ROUGH | 12/15/2006 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: DOOR FRAMES ARE NOT INSTALLED, DRAWINGS AND TRUSS ENGINEERING DOES NOT SHOW AIR HANDLER HANGING DOWN FROM TRUSSES | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 12/13/2006 | APPROVED | JHINDMAN |
| Note: | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 11/16/2006 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: NEED ANCHOR SCHEDULE FOR S22, S23, S24 THAT MATCHES AS BUILTS, NEED ANCHOR SCHEDULE FOR 3 MEMBER 2X12 AT REAR PORCH | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 10/30/2006 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: NEED TRUSS REPAIRS G02, S17, NEED STRAPS GDR04, HG01, ANCHOR SCHEDULE S22 -S24 DOES NOT MATCH AS BUILT, NEED ANCHOR DETAIL FOR TRIPLE 2X12 ON PORCH, POUR 3 CELLS THAT WERE MISSED | |||
| FOUNDATION SURVEY APPROVED BY STORMWATER | 10/24/2006 | APPROVED | LAPTEKAR |
| Note: received revised proposed FFE and revised topo | |||
| LINTEL | 10/16/2006 | APPROVED | CMINI |
| FOUNDATION SURVEY APPROVED BY STORMWATER | 10/13/2006 | APPROVED - AS NOTED | MBRENNAN |
| Note: Per MB...please submit a new lot grading plan to accommodate the 6" higher FFE and a corrected site plan for stormwater regarding the driveway placement of circular addition. | |||
| TEMPORARY POLE | 10/03/2006 | APPROVED | ACOOPER |
| Note: CALLED FPL | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 09/22/2006 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB INSPECTION/SLAB | 09/21/2006 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: THIS IS A REINSPECTION no plans or permit | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 08/31/2006 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: garage does not match plans | |||
| FIRST ROUGH PLUMBING INSPECTION | 08/21/2006 | APPROVED | ACOOPER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 01/18/2007 | 01/22/2007 |
| Note: Released By: CCOTE Approved for Release. REVISION: Revised plan AHU to hang from truss. | |||
| BLD | COMPLETE | 12/07/2006 | 12/08/2006 |
| Note: Released By: CCOTE Approved for Release. Review by Fred R. REVISION: Revised connectors. | |||
| BLD | COMPLETE | 11/09/2006 | 11/14/2006 |
| Note: Released By: CCOTE Approved for Release. REVISION: Truss repairs G02, S17. | |||
| SW1 | COMPLETE | 10/24/2006 | 10/24/2006 |
| Note: Released By: LAPTEKAR received new topo showing single driveway from front garage and FFE adjusted. | |||
| SW1 | HOLD | 10/13/2006 | 10/13/2006 |
| Note: Held By: LAPTEKAR The recent changes to move the house 9/18/06 were not submitted to the stormwater department for approval .The change shows the garage entrance to the front with a circular driveway encroaching the left side 5' utility easement and does not show the appropriate driveway flairs at the road edge..a two foot minimum opening is required between culverts and a 16 foot minimum flair at the road...and is.not to encroach the neighboring right of way. Please submit a corrected version to the stormwater department of the driveway placement with the appropriate widths of the driveway flair at the road. | |||
| BLD | COMPLETE | 09/18/2006 | 09/19/2006 |
| Note: Released By: CCOTE Approved for Release. | |||
| ZON | COMPLETE | 09/18/2006 | 09/18/2006 |
| Note: Released By: ECOYNE change location of house still meets setback change to garage in front | |||
| BLD | COMPLETE | 04/19/2006 | 04/20/2006 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Fred R. | |||
| SW1 | COMPLETE | 04/11/2006 | 04/25/2006 |
| Note: Released By: LAPTEKAR | |||
| ZON | COMPLETE | 04/11/2006 | 04/19/2006 |
| Note: Released By: HHERKERT |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | ¤40.00 | 06/05/2007 |
| EARLY POWER INSPECTION | ¤40.00 | 06/05/2007 |
| EARLY POWER INSPECTION | ¤40.00 | 06/05/2007 |
| REINSPECTION FEE | ¤40.00 | 06/05/2007 |
| REINSPECTION FEE | ¤40.00 | 06/05/2007 |
| REINSPECTION FEE | ¤40.00 | 06/05/2007 |
| REINSPECTION FEE | ¤40.00 | 06/05/2007 |
| REINSPECTION FEE | ¤40.00 | 06/05/2007 |
| REINSPECTION FEE | ¤40.00 | 06/05/2007 |
| REINSPECTION FEE | ¤40.00 | 06/05/2007 |
| REINSPECTION FEE | ¤40.00 | 06/05/2007 |
| REVISION | ¤40.00 | 06/05/2007 |
| REVISION | ¤40.00 | 06/05/2007 |
| REVISION | ¤40.00 | 06/05/2007 |
| REVISION | ¤40.00 | 06/05/2007 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 06/05/2007 |
| SW REVISION | ¤40.00 | 06/05/2007 |
| TRANS IMPACT FEE 4 - PER UNIT | ¤3,248.51 | 05/03/2006 |
| ADMIN FEE | ¤20.00 | 05/03/2006 |
| ARC HOUSE REVIEW | ¤125.00 | 05/03/2006 |
| BUILDING CODE ADMIN FUND | ¤17.39 | 05/03/2006 |
| ELECTRIC FEE | ¤178.20 | 05/03/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 05/03/2006 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/03/2006 |
| FIRE IMPACT FEE 4-1-06 | ¤179.37 | 05/03/2006 |
| MECHANICAL FEE | ¤178.20 | 05/03/2006 |
| PERMIT FEE | ¤963.30 | 05/03/2006 |
| PARKS IMPACT FEE 4/1/06 | ¤1,159.02 | 05/03/2006 |
| PLAN CHECK FEE | ¤98.80 | 05/03/2006 |
| PLUMBING FEE | ¤178.20 | 05/03/2006 |
| RADON FEE | ¤17.39 | 05/03/2006 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,718.38 |