I want to search for...
Permit #2006040516
Permit Details
Status: COED
| CONDITIONED SPACE: 16449 sqft |
| GARAGE: 2535 sqft |
| OPENED PORCH (WITH ROOF) : 1158 sqft |
| Total Square Footage: 20142 sqft |
| Subdivision: 2085 - Tidelands at the Village Phase II |
| Job Phone: (407)838-1486 |
| Location Address: 190 RIVERVIEW BEND S |
| Type: BCR - BUILDING COMMERCIAL RESIDENTIAL -CONDO |
| Issue Date: 05/12/2006 |
| NOC: RECORDED |
| Applicant name: JAMES NICHOLSON BOYCE IV |
| Owner: CENTEX DESTINATION PROPERTIES |
|
Address 1064 GREENWOOD BLVD SUITE 200 LAKE MARY, FL 32746 |
| Contracted Stated Job Value: ¤1,300,000.00 |
| Job Description: BUILDING #10 - 10 PLEX TOWNHOMES |
| Type: CN |
Contractor
CENTEX DESTINATION PROPERTIES
| Status | Location Address | Mailing Address | State License Number | Phone |
| CANCEL |
1064 GREENWOOD BLVD LAKE MARY, FL 32746 |
STE. 200 LAKE MARY, FL 32746 |
CGC1508651 (Exp: 08/31/2010) | (407)838-1486 |
Sub Contractors
TRUMAN E GAILEY JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
231 Jean St. DAYTONA BEACH, FL 32114 |
EC0000265 (Exp: 08/31/2026) | (386) 255-1418 | (386)255-3429 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
GARY WAYNE EVERS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 740106 ORANGE CITY, FL 32763 |
CFC050566 (Exp: 08/31/2026) | 386-775-0909 | 386-775-0918 |
WAYNE STEED
| Status | Location Address | State License Number | Phone |
| CANCEL |
318 N. PINE AVENUE IVERNESS, FL 34450 |
CCC058299 (Exp: 08/31/2010) | (352)637-2422 |
Inspection History
| Type | Request Date | Result | Inspector |
| LANDSCAPE FINAL | 07/13/2007 | APPROVED | WBUTLER |
| Note: per request of Brian | |||
| FINAL COMPLETE BUILDING INSPECTION | 07/13/2007 | FINAL APPROVED | JLEVRAULT |
| FIRE FINAL | 07/12/2007 | APPROVED | JPATTEE |
| Note: per request of contractor | |||
| UTILITY COMMERCIAL FINAL | 06/29/2007 | APPROVED | KKING |
| UTILITY COMPANY FINAL | 06/29/2007 | APPROVED | TSCHWEERS |
| PLUMBING FINAL | 06/26/2007 | APPROVED | PGALLMANN |
| ELECTRICAL FINAL | 06/21/2007 | APPROVED | RMARVEL |
| Note: | |||
| H.V.A.C. FINAL | 06/15/2007 | APPROVED | JLEVRAULT |
| COMMERCIAL POWER INSPECTION | 03/14/2007 | APPROVED | RMARVEL |
| ENGINEERING FINAL | 02/19/2007 | APPROVED | DMAY |
| COMMERCIAL POWER INSPECTION | 02/14/2007 | APPROVED - AS NOTED | RMARVEL |
| Note: CALLED FPL AT 3:30 R.M. | |||
| INSULATION INSPECTION | 02/09/2007 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| INSULATION INSPECTION | 02/07/2007 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: NOT READY. | |||
| INSULATION INSPECTION | 01/31/2007 | Disapproved -FEE REQUIRED | CMINI |
| Note: NEED TO FIRESTOP PENATRATIONS AND ADD MISSING INSULATION. | |||
| FIREWALL INSPECTION | 01/19/2007 | APPROVED | JPATTEE |
| Note: THIS IS A REINSPECTION | |||
| FRAMING | 01/18/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: REPLACT T'S WITH Y'S FOR BATH VENTS IN 4 UNITS. CHECK ALL EXTERIOR DOOR TAPCONS. | |||
| FRAMING | 11/13/2006 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: THIS IS A REINSPECTION complete firestopping. description for fastening of hat channel needed. | |||
| 2ND ROUGH ELECTRICAL | 11/13/2006 | APPROVED | LHITES |
| Note: THIS IS A REINSPECTION | |||
| 2ND ROUGH ELECTRICAL | 11/02/2006 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: check strapping , nail plates, grounding, boxfill, anti-short bushings. | |||
| FRAMING | 11/02/2006 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: NOT READY. | |||
| SECOND ROUGH PLUMBING INSPECTION | 10/27/2006 | APPROVED | JLEVRAULT |
| H.V.A.C. ROUGH | 10/27/2006 | APPROVED | JLEVRAULT |
| ALL ROUGH | 09/29/2006 | CANCELLED BY APPLICANT | JLEVRAULT |
| FIREWALL INSPECTION | 09/29/2006 | CANCELLED BY APPLICANT | JPATTEE |
| THRESHOLD/AFFIDAVIT | 09/25/2006 | APPROVED | PPROVIDER |
| Note: Law & Associates, Inc. Threshold inspectors report dated 9/25/06 | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 09/06/2006 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: 1/s-6, 2/s-6 and girders a8 not anchored per plan | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 08/21/2006 | APPROVED | PPROVIDER |
| Note: THIS IS A REINSPECTION Threshold inspectors report dated 8/21/06 and 8/25/06 | |||
| POURED CELL | 07/28/2006 | APPROVED | PPROVIDER |
| Note: Threshold inspectors report. Parapit walls | |||
| LINTEL | 07/21/2006 | APPROVED | PPROVIDER |
| Note: Threshold inspectors report. 2nd floor lintel | |||
| SECOND FLOOR SLAB INSPECTION | 07/12/2006 | APPROVED | PPROVIDER |
| Note: Threshold inspectors report. 2nd floor slab | |||
| LINTEL | 06/26/2006 | APPROVED | PPROVIDER |
| Note: Threshold inspectors report. 1st floor | |||
| POURED CELL | 06/21/2006 | APPROVED | PPROVIDER |
| Note: Threshold inspectors report. 1st floor filled cells | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 06/09/2006 | APPROVED | PPROVIDER |
| Note: Threshold inspectors report. 1st floor slab | |||
| FIRST ROUGH PLUMBING INSPECTION | 06/07/2006 | APPROVED | JMCGOWEN |
| FOOTER | 05/24/2006 | APPROVED | PPROVIDER |
| Note: Threshold inspectors report. |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 09/28/2006 | 09/28/2006 |
| Note: Released By: CCOTE Approved for Release. REVISION: Connector clarification letter at GE1. | |||
| BLD | COMPLETE | 05/09/2006 | 05/11/2006 |
| Note: Released By: LWOODROME | |||
| BLD | HOLD | 04/25/2006 | 04/27/2006 |
| Note: Held By: FREODICA CITY OF PALM COAST BUILDING DIVISION Comments on Permit Application No. 2006040516 (Tidelands -Building No. 10) 1. Provide separate Energy Calculations for Unit C2. Unit C can not be assumed similar to Unit C2 due to their living space square footage big difference. 2. Dwg. Sheet A3.2: Referenced detail 3/A-7.5 is missing. 3. Dwg. Sheet A7.7: Detail 4 (CMU Wall Tenant Separation) has calculated fire resistance based on outdated code. 4. Dwg. Sheet M3 & M4: Clarify Plan Key Note 11. 5. Dwg. Sheet M5: HVAC Sheet Note 3, condensate disposal shall be based on FBC/M 2001 Section 307. Indicate condensate pipe size and provide termination detail. 6. Dwg. Sheet E1 & E3: Provide electrical disconnects for water heaters. 7. Dwg. Sheet P5: Clarify Plan Key Note 5. Is this for water heater only? How about the drain from washing machine? 8. Dwg. Sheet P7: Discharge Piping Termination Detail shown shall be at least one (1) ft. away from structure. 9. Dwg. sheet P9: (Unit D Water Riser-W5/P9) a. Clarify hw/cw pipe sizes as they do not match with layout on P3. b. Clarify water closet specs. designations (WC-1 or WC-2?). Coordinate with sanitary riser S7/P8 too. | |||
| FI1 | COMPLETE | 04/13/2006 | 04/21/2006 |
| Note: Released By: JPATTEE Plans still indicate outdated code references! Could not find location of fire alarm panel as indicated |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 07/13/2007 |
| REINSPECTION FEE | ¤40.00 | 07/13/2007 |
| REINSPECTION FEE | ¤40.00 | 07/13/2007 |
| REINSPECTION FEE | ¤40.00 | 07/13/2007 |
| REINSPECTION FEE | ¤40.00 | 07/13/2007 |
| REINSPECTION FEE | ¤40.00 | 07/13/2007 |
| REVISION | ¤40.00 | 07/13/2007 |
| TRANSPORTATION IMPACT FEE | ¤16,394.60 | 05/12/2006 |
| ADMIN FEE | ¤20.00 | 05/12/2006 |
| BUILDING CODE ADMIN FUND | ¤100.71 | 05/12/2006 |
| ELECTRIC FEE | ¤952.20 | 05/12/2006 |
| FIRE COMM IMPACT FEE 4-1-05 | ¤10,012.59 | 05/12/2006 |
| FIRE PLANS REVIEW | ¤201.42 | 05/12/2006 |
| MECHANICAL FEE | ¤952.20 | 05/12/2006 |
| PERMIT FEE | ¤8,453.50 | 05/12/2006 |
| PLAN CHECK FEE | ¤1,767.55 | 05/12/2006 |
| PLUMBING FEE | ¤952.20 | 05/12/2006 |
| RADON FEE | ¤100.71 | 05/12/2006 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤40,187.68 |