I want to search for...
Permit #2006040659
Permit Details
Status: COED
| Parcel Id: 07-11-31-7027-00560-0290 |
| CONDITIONED SPACE: 1524 sqft |
| CONDITIONED SPACE: 1524 sqft |
| GARAGE: 291 sqft |
| GARAGE: 291 sqft |
| OPENED PORCH (WITH ROOF) : 163 sqft |
| OPENED PORCH (WITH ROOF) : 163 sqft |
| OPENED PORCH (WITH ROOF) : 48 sqft |
| OPENED PORCH (WITH ROOF) : 48 sqft |
| Total Square Footage: 4052 sqft |
| Block: 00560 |
| Subdivision: - |
| Job Phone: (386)445-7343 |
| Location Address: 16 WOOD AMBER LN |
| Type: DU - DUPLEX |
| Issue Date: 06/02/2006 |
| NOC: RECORDED |
| Applicant name: BURTON ROBERT BERMAN |
| Owner: REIS JOSE |
|
Address 54 WYNNFIELD DRIVE PALM COAST, FL 32137 |
| Lot: 0290 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
PALM COAST HOMES & DEVELOPMENT CORP.
| Status | Location Address | State License Number | Phone |
| CANCEL |
138 PALM COAST PARKWAY NE # 348 PALM COAST, FL 32137 |
CRC1326612 (Exp: 08/31/2012) | (386)445-7343 |
Sub Contractors
GLEN STEWART COLE
| Status | Location Address | State License Number | Phone | Fax |
| HOLD |
P. O. Box 1677 Palm Coast, FL 32136 |
EC0002522 (Exp: 08/31/2010) | (386) 437-4364 | (386)437-0412 |
MICHAEL G MORELLO JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2 HARGROVE GRADE PALM COAST, FL 32137 |
CAC014293 (Exp: 08/31/2014) | (386)447-3950 | (386)446-4614 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 01/26/2007 | FINAL APPROVED | JLEVRAULT |
| STORMWATER FINAL INSPECTION | 01/25/2007 | APPROVED | DRANDALL |
| Note: THIS IS A REINSPECTION check sod in swale | |||
| STORMWATER FINAL INSPECTION | 01/23/2007 | Disapproved -FEE REQUIRED | DRANDALL |
| Note: THIS IS A REINSPECTION place sod in left adj. property swale, can not use seed & straw in city right of way, must be sod | |||
| STORMWATER FINAL INSPECTION | 01/19/2007 | Disapproved -FEE REQUIRED | DRANDALL |
| Note: THIS IS A REINSPECTION place sod in left adj. property swale where dumpster was, all exposed earth | |||
| UTILITY COMPANY FINAL | 01/18/2007 | APPROVED | TSCHWEERS |
| STORMWATER FINAL INSPECTION | 01/17/2007 | Disapproved -FEE REQUIRED | DRANDALL |
| Note: remove dumpster, regrade, and sod same area.....no other inspection was done | |||
| DRIVEWAY | 12/07/2006 | APPROVED | DRANDALL |
| Note: THIS IS A REINSPECTION | |||
| DRIVEWAY | 12/05/2006 | Disapproved -FEE REQUIRED | DRANDALL |
| Note: need 50% coverage on culvert pipe see detail provided | |||
| INSULATION INSPECTION | 11/02/2006 | APPROVED | CMINI |
| FIREWALL FRAMING (DUPLEX) | 10/31/2006 | APPROVED | PGALLMANN |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 10/31/2006 | APPROVED | PGALLMANN |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 10/27/2006 | Disapproved - NO FEE | JMCGOWEN |
| Note: NEED NAIL PLATES ABOVE PANEL BOTH APTS. NEED TO MAKE UP BOX IN GARAGE. NEED TO FIRESTOP ALONG BLOCK WALL ABOVE TUFF-R. NEED TO HAVE 12 WIRE FOR DISPOSEL IN KITCHEN BOTH APTS. STRAP WIRES ALONG WALLS AND CEILING. TIGHTEN NUTS. NEED TO MOVE SMOKE DETECTORS. | |||
| FIREWALL INSPECTION | 10/27/2006 | Disapproved -FEE REQUIRED | CMINI |
| Note: NEED TO WRAP WOOD PENATRATIONS 2' THAT IS GOING INTO FIREWALL BOTH SIDES. | |||
| FRAMING | 10/23/2006 | APPROVED | CMINI |
| FIREWALL FRAMING (DUPLEX) | 10/23/2006 | Disapproved -FEE REQUIRED | CMINI |
| Note: NEED TO FIRE SEAL WOOD PENATRATIONS ON OVER FRAMING OF RAFTERS REAR OF HOUSE 2' FROM FIREWALL. SOFFIT NEEDS TO BE SEAL TO THE END. | |||
| LATH /BRICK FLASHING | 10/23/2006 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| LATH /BRICK FLASHING | 10/19/2006 | Disapproved -FEE REQUIRED | PGALLMANN |
| Note: NOT READY / NO VAPOR BARRIER OR WIRE LATH. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 09/28/2006 | APPROVED - AS NOTED | LHITES |
| Note: FINISH VALLEY STRAPS | |||
| FOUNDATION SURVEY APPROVED BY STORMWATER | 07/18/2006 | APPROVED | LAPTEKAR |
| LINTEL | 07/13/2006 | APPROVED | JLEVRAULT |
| TEMPORARY POLE | 07/13/2006 | APPROVED | JLEVRAULT |
| Note: called susan at fpl 11:20 | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 06/28/2006 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION Check foundation for compaction in footer area per Joe M | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 06/26/2006 | Disapproved -FEE REQUIRED | ARITTER |
| Note: Concrete patio @ rear not shown on plan, no compaction results. | |||
| FIRST ROUGH PLUMBING INSPECTION | 06/20/2006 | APPROVED | ARITTER |
| Note: THIS IS A REINSPECTION | |||
| FIRST ROUGH PLUMBING INSPECTION | 06/19/2006 | Disapproved -FEE REQUIRED | ARITTER |
| Note: low head pressure on waste system , check for leaks | |||
| FIRST ROUGH PLUMBING INSPECTION | 06/16/2006 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: no plans on job need temp. toilet on job |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 07/07/2006 | 07/07/2006 |
| Note: Released By: HHERKERT | |||
| ZON | COMPLETE | 07/06/2006 | 07/06/2006 |
| Note: Released By: ECOYNE add 10' X 14.67' patio to each side of duplex. | |||
| BLD | COMPLETE | 07/06/2006 | 07/06/2006 |
| Note: Released By: CCOTE Approved for Release. Revision: Added concrete patios. | |||
| BLD | COMPLETE | 06/01/2006 | 06/02/2006 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Auba. | |||
| ZON | COMPLETE | 05/23/2006 | 05/24/2006 |
| Note: Released By: ECOYNE | |||
| SW1 | HOLD | 04/18/2006 | 05/19/2006 |
| Note: Held By: LAPTEKAR Need 3 sealed topo surveys...checked main file..no extra copies available | |||
| ZON | HOLD | 04/18/2006 | 04/24/2006 |
| Note: Held By: HHERKERT 1. tree survey indicating tree type size and location is required 2. landscape plan with landscape key is required | |||
| SW1 | COMPLETE | 05/30/2006 | |
| Note: Released By: LAPTEKAR received 3 sealed topo surveys |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 01/29/2007 |
| REINSPECTION FEE | ¤40.00 | 01/29/2007 |
| REINSPECTION FEE | ¤40.00 | 01/29/2007 |
| REINSPECTION FEE | ¤40.00 | 01/29/2007 |
| REINSPECTION FEE | ¤40.00 | 01/29/2007 |
| REINSPECTION FEE | ¤40.00 | 01/29/2007 |
| REVISION | ¤40.00 | 01/29/2007 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 01/29/2007 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 01/29/2007 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 01/29/2007 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 01/29/2007 |
| TRANS IMPACT FEE 4 - PER UNIT | ¤6,497.02 | 06/02/2006 |
| TRANS IMPACT FEE 4 - PER UNIT | (¤6,497.02) | 06/02/2006 |
| TRANS IMPACT FEE 4 - PER UNIT | ¤6,497.02 | 06/02/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤7,200.00 | 06/02/2006 |
| SCHOOL BOARD IMPACT FEE RES | (¤7,200.00) | 06/02/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤7,200.00 | 06/02/2006 |
| STORM WATER PERMIT FEES | (¤80.00) | 06/02/2006 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/02/2006 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/02/2006 |
| ADMIN FEE | (¤20.00) | 06/02/2006 |
| ADMIN FEE | ¤20.00 | 06/02/2006 |
| ADMIN FEE | ¤20.00 | 06/02/2006 |
| ARC HOUSE REVIEW | ¤125.00 | 06/02/2006 |
| ARC HOUSE REVIEW | (¤125.00) | 06/02/2006 |
| ARC HOUSE REVIEW | ¤125.00 | 06/02/2006 |
| BUILDING CODE ADMIN FUND | (¤20.26) | 06/02/2006 |
| BUILDING CODE ADMIN FUND | ¤20.26 | 06/02/2006 |
| BUILDING CODE ADMIN FUND | ¤20.26 | 06/02/2006 |
| ELECTRIC FEE | ¤207.00 | 06/02/2006 |
| ELECTRIC FEE | (¤207.00) | 06/02/2006 |
| ELECTRIC FEE | ¤207.00 | 06/02/2006 |
| FIRE IMPACT FEE 4-1-06 | (¤358.74) | 06/02/2006 |
| FIRE IMPACT FEE 4-1-06 | ¤358.74 | 06/02/2006 |
| FIRE IMPACT FEE 4-1-06 | ¤358.74 | 06/02/2006 |
| MECHANICAL FEE | ¤207.00 | 06/02/2006 |
| MECHANICAL FEE | (¤207.00) | 06/02/2006 |
| MECHANICAL FEE | ¤207.00 | 06/02/2006 |
| PERMIT FEE | (¤1,150.50) | 06/02/2006 |
| PERMIT FEE | ¤1,150.50 | 06/02/2006 |
| PERMIT FEE | ¤1,150.50 | 06/02/2006 |
| PARKS IMPACT FEE 4/1/06 | ¤2,318.04 | 06/02/2006 |
| PARKS IMPACT FEE 4/1/06 | (¤2,318.04) | 06/02/2006 |
| PARKS IMPACT FEE 4/1/06 | ¤2,318.04 | 06/02/2006 |
| PLAN CHECK FEE | (¤118.00) | 06/02/2006 |
| PLAN CHECK FEE | ¤118.00 | 06/02/2006 |
| PLAN CHECK FEE | ¤118.00 | 06/02/2006 |
| PLUMBING FEE | ¤207.00 | 06/02/2006 |
| PLUMBING FEE | (¤207.00) | 06/02/2006 |
| PLUMBING FEE | ¤207.00 | 06/02/2006 |
| RADON FEE | (¤20.26) | 06/02/2006 |
| RADON FEE | ¤20.26 | 06/02/2006 |
| RADON FEE | ¤20.26 | 06/02/2006 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤18,948.82 |