I want to search for...

Permit #2006040938

Permit Details

Status: COED

Parcel Id: 07-11-31-7004-00230-0040
CONDITIONED SPACE: 2116 sqft
GARAGE: 539 sqft
OPENED PORCH (WITH ROOF) : 301 sqft
OPENED PORCH (WITH ROOF) : 36 sqft
Total Square Footage: 2992 sqft
Block: 00230
Subdivision: -
Job Phone: (386) 445-5239
Location Address: 13 COLUMBUS CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/31/2006
NOC: RECORDED
Applicant name: KEITH M PARKER
Owner: LARRY D. MULKEY AND GAIL D. MULKEY

Address

1736 LAKE CIRCLE

HIXON, TN 37343

Lot: 0040
Contracted Stated Job Value: ¤203,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

DILLARD CONSTRUCTION LLC.
Status Location Address State License Number Phone Fax
CANCEL

PO BOX 355007

PALM COAST, FL 32137

CGC1510399 (Exp: 09/30/2010) 386-864-1320 (386)986-3054

Sub Contractors

ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853
MARTIN JOHN EVANS
Status Location Address State License Number
ACTIVE

14 FORT CAROLINE CT

BUNNELL, FL 32110

CFC057676 (Exp: 08/31/2026)
MILLARD K KELLER
Status Location Address State License Number Phone Fax
CANCEL

313 S. VOLUSIA AVENUE

DELAND, FL 32724

CCC1325778 (Exp: 08/31/2010) (386) 774-9961 (386)774-2388
RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
CANCEL

P. O. Box 1963

Bunnell, FL 32110

ER0011613 (Exp: 08/31/2008) (386) 437-0607 (386)437-1847

Inspection History

Type Request Date Result Inspector
FINAL COMPLETE BUILDING INSPECTION 03/19/2007 FINAL APPROVED JMCGOWEN
Note:
UTILITY COMPANY FINAL 03/16/2007 APPROVED AGRAHAM
Note: Jackie from Dillard called for inspection
UTILITY COMPANY FINAL 03/09/2007 Disapproved - NO FEE TSCHWEERS
Note: FAILED GRAVITY FAILED 4" CLEAN OUT CRASHED
STORMWATER FINAL INSPECTION 03/08/2007 APPROVED - AS NOTED DRANDALL
Note: 24 sf road
PATIO 01/30/2007 APPROVED CMINI
Note:
DRIVEWAY 01/26/2007 APPROVED DRANDALL
STEM FOOTING FOUNDATION 01/11/2007 APPROVED CMINI
Note: THIS IS A REINSPECTION
STEM FOOTING FOUNDATION 01/10/2007 Disapproved - NO FEE CMINI
Note: CONTRACTOR MET ME ON JOB TO CANCEL,SUB DID NOT SHOW UP TO FINISH WORK.
STEM FOOTING FOUNDATION 01/09/2007 CANCELLED BY APPLICANT JM
Note: THIS IS A REINSPECTION JACKIE FROM DILLARD CALLED TO CANCEL THIS INSPECTION, AND RESCHEDULE IT FOR 1/10/07
STEM FOOTING FOUNDATION 01/08/2007 CANCELLED BY APPLICANT CMINI
INSULATION INSPECTION 10/20/2006 APPROVED ACOOPER
LATH /BRICK FLASHING 10/16/2006 APPROVED JHINDMAN
ALL ROUGH 10/09/2006 APPROVED - AS NOTED LHITES
Note: FIX NUMEROUS ELEC. BOXES, QUESTION ON 12-2 IN M-BATH, PHASE WHITE CONDUCTOR IN SWITCH BOXES, CHANGE 1" SMURF TO 1" PVC WITH CAP OR FIRE CAULK, CHECK NAIL PLATES, INSTALL LAUNDRY WINDOW.
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 10/06/2006 APPROVED LHITES
Note: THIS IS A REINSPECTION
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 10/03/2006 Disapproved -FEE REQUIRED LHITES
Note: missing strap at truss t-02, x-bracing to be continuous 4-bays, also dimension A of gable truss detail is greater than 6', add 2x4 per detail, need to finish existing bolts and add bolts to 2x6 of slider doors, finish straping valley straps in front bedroom, Note: tuff-r cannot be continuous to attic- must add 1x2 or 2x4 for fire stop
LINTEL 08/11/2006 APPROVED CMINI
FOUNDATION SURVEY APPROVED BY STORMWATER 08/11/2006 APPROVED LAPTEKAR
MONOLITHIC SLAB INSPECTION/SLAB 08/04/2006 APPROVED JMCGOWEN
FIRST ROUGH PLUMBING INSPECTION 08/01/2006 APPROVED JMCGOWEN

Review History

Department Status Date In Date Out
SW1 COMPLETE 01/12/2007 01/12/2007
Note: Released By: LAPTEKAR added 3' sidewalk
BLD COMPLETE 01/02/2007 01/04/2007
Note: Released By: CCOTE Approved for Release. REVISION: Retaining wall detail for patio.
PLLA COMPLETE 05/17/2006 05/17/2006
Note: Released By: MDEFREITAS Held By: WBUTLER/ OK TO COMPLETE PER BILL
ZON COMPLETE 04/28/2006 04/28/2006
Note: Released By: ECOYNE
BLD COMPLETE 04/28/2006 05/01/2006
Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Auba.
SW1 COMPLETE 04/25/2006 05/05/2006
Note: Released By: LAPTEKAR
ZON HOLD 04/25/2006 04/27/2006
Note: Held By: HHERKERT hold for ARC meeting 4-28-06

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ENGINEERING ROAD DAMAGE ¤292.00 03/28/2007
REINSPECTION FEE ¤40.00 03/28/2007
REVISION ¤40.00 03/28/2007
SCHOOL BOARD IMPACT FEE RES ¤3,600.00 07/31/2006
STORM WATER PERMIT FEES ¤80.00 07/31/2006
TRANS IMPACT FEE 4 - PER UNIT ¤3,248.51 07/31/2006
ADMIN FEE ¤20.00 07/31/2006
BUILDING CODE ADMIN FUND ¤14.96 07/31/2006
ELECTRIC FEE ¤157.20 07/31/2006
FIRE IMPACT FEE 4-1-06 ¤179.37 07/31/2006
MECHANICAL FEE ¤157.20 07/31/2006
PERMIT FEE ¤826.80 07/31/2006
PARKS IMPACT FEE 4/1/06 ¤1,159.02 07/31/2006
PLAN CHECK FEE ¤84.80 07/31/2006
PLUMBING FEE ¤157.20 07/31/2006
RADON FEE ¤14.96 07/31/2006
Fees Total Due: ¤0.00 Total Paid: ¤10,072.02