Permit #2006041047

Permit Details

Status: COED

Total Square Footage: 9904 sqft
Block: 000
Subdivision: 2096 - TUSCAN RESERVE
Job Phone: (407)478-4500
Location Address: 100 TUSCAN RESERVE DR BLDG 1
Type: BCR - BUILDING COMMERCIAL RESIDENTIAL -CONDO
Issue Date: 08/15/2006
NOC: RECORDED
Applicant name: ROGER B KENNEDY
Owner: TUSCAN RESERVE II

Address

1275 LAKE HEATHROW LANE

HEATHROW, FL 32746

Address

SUITE #115

HEATHROW, FL 32746

Lot: 0000
Contracted Stated Job Value: ¤786,872.00
Job Description: 8 UNIT CONDOMINIUM - BUILDING 100
Type: CN

Contractor

KENCON CORPORATION
Status Location Address Mailing Address State License Number Phone Fax
CANCEL

KENCON CORPORATION

ALTAMONTE SPRINGS, FL 32714

217 N. WESTMORE DRIVE # 3021

ALTAMONTE SPRINGS, FL 32714

CGC005368 (Exp: 09/30/2008) (407)478-4500 (407)478-4501

Sub Contractors

DANIEL R SHEFFIELD
Status Location Address State License Number Phone
INACTIVE

1100 Old Haw Creek Road

Bunnell, FL 32110

EC0003100 (Exp: 08/31/2024) 386-931-4729
DENNIS B FLETCHER
Status Location Address State License Number Phone Fax
CANCEL

1824 NE 164TH AVE

GAINESVILLE, FL 32609

CAC058215 (Exp: 09/30/2008) (352)375-7030 (352)375-7031
BRYAN KEITH NAZWORTH
Status Location Address State License Number Phone Fax
CANCEL

6318 NW 18TH DRIVE

GAINESVILLE, FL 32653

CFC043073 (Exp: 08/31/2012) (352)377-1009 (352)377-3204
ALICE ANN JOHNSON
Status Location Address State License Number Phone Fax
CANCEL

P.O. BOX 3829

ORLANDO, FL 32810

CCC055607 (Exp: 08/31/2012) (407)660-8552 (407)660-8012

Inspection History

Type Request Date Result Inspector
FINAL COMPLETE BUILDING INSPECTION 02/27/2007 FINAL APPROVED JLEVRAULT
Note: the building final is ok need enginering department to sign off
ENGINEERING FINAL 02/22/2007 APPROVED KKRUGER
LANDSCAPE FINAL 02/22/2007 APPROVED WBUTLER
UTILITY COMMERCIAL FINAL 02/19/2007 APPROVED KKING
UTILITY COMPANY FINAL 02/19/2007 APPROVED TSCHWEERS
FIRE FINAL 02/16/2007 APPROVED JPATTEE
H.V.A.C. FINAL 02/16/2007 APPROVED JLEVRAULT
Note: THIS IS A REINSPECTION
PLUMBING FINAL 02/13/2007 APPROVED JGIBSON
Note:
H.V.A.C. FINAL 02/13/2007 Disapproved -FEE REQUIRED JLEVRAULT
Note: LABEL CONDENSING UNITS. INSTALL DRYER EFFICIENCY STICKERS. CHANGE AGU FILTERS.
ELECTRICAL FINAL 02/13/2007 APPROVED RMARVEL
COMMERCIAL POWER INSPECTION 01/24/2007 APPROVED RMARVEL
INSULATION INSPECTION 12/15/2006 APPROVED JHINDMAN
Note:
ALL ROUGH 12/13/2006 APPROVED LHITES
Note: THIS WAS AN ELECTRIC INSPECTION ONLY
ALL ROUGH 12/04/2006 Disapproved -FEE REQUIRED JMCGOWEN
Note: plumbing approved per james gibson. mechanical as-noted per joe mcgowen. dryer vents exceed 25' need something stating what is going to be done to correct this problem. electric #8 aluminumis not rated 40 amp per range. replace taped nm cable. more than 3 wires under a staple or strap is bundling- not allowed. need 11/4" clearance or nail plate wire along bas board. no more than 2 conductors in romex clamp @ panel. add stud next to panel and strap all pvc. nail plate all block walls. nail plates and issue throughout building.
LATH /BRICK FLASHING 11/15/2006 APPROVED JHINDMAN
Note:
FIRST ROUGH PLUMBING INSPECTION 11/14/2006 Disapproved - NO FEE JGIBSON
Note: Plumber wanted second rough on sanitary only, was informed not City of Palm Coast policies.
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 11/13/2006 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION.NEED TO HAVE REVISIONS STAMPED BY CITY.
FIREWALL INSPECTION 11/07/2006 CANCELLED BY INSPECTOR JPATTEE
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 10/26/2006 Disapproved -FEE REQUIRED JHINDMAN
Note: need approved truss repair letters, need approved truss repair lettr for drilling girder truss, need approved engineers letters for tapcons into straps and using usp straps. expose straps on walls se corner unit. balcony trusses need stap for 995 lbs. uplift.
LINTEL 10/11/2006 APPROVED - AS NOTED JHINDMAN
Note: 2nd floor lintel
LINTEL 10/10/2006 Disapproved -FEE REQUIRED JHINDMAN
Note: NOT READY 2ND LIFT
LINTEL 10/03/2006 APPROVED - AS NOTED DROCKWELL
Note: Bldg #1....Balcony inspection
LINTEL 09/26/2006 APPROVED - AS NOTED JHINDMAN
Note: 1st floor
LINTEL 09/22/2006 APPROVED - AS NOTED JHINDMAN
Note: partial
MONOLITHIC SLAB INSPECTION/SLAB 09/06/2006 APPROVED DROCKWELL
UNDERGROUND ELECTRICAL 08/28/2006 APPROVED RMARVEL
FIRST ROUGH PLUMBING INSPECTION 08/21/2006 APPROVED JGIBSON

Review History

Department Status Date In Date Out
BLD COMPLETE 12/07/2006 12/12/2006
Note: Released By: CCOTE Approved for Release. Review by Fred R. REVISION: Revision to meter center.
BLD COMPLETE 11/15/2006 11/16/2006
Note: Released By: CCOTE Approved for Release. REVISION: Truss repairs C1, F01, R10, R11, F01, F01B; Truss connector substitution; Omit fire dampers at 2nd floor level ceiling/attic level.
BLD COMPLETE 09/20/2006 09/21/2006
Note: Released By: CCOTE Approved for Release. REVISION: Balcony detail change.
BLD COMPLETE 08/16/2006 08/16/2006
Note: Released By: CCOTE Approved for Release. Revision: Slab reinforcing change, post tension shop drawings submitted.
BLD COMPLETE 07/31/2006 08/02/2006
Note: Released By: CCOTE Approved for Release. Building 1 (100): 9,904 sf – 8 unit condo building. The value on application is a little low. This is a Type VB construction so 9904 x 79.45 = $786,872.80. (original value submitted - 678,270)
BLD HOLD 07/11/2006 07/12/2006
Note: Held By: CCOTE CITY OF PALM COAST BUILDING DIVISION Comments on Permit Application (Tuscan Reserve Buildings 1-9) The following items must be submitted/clarified in order to complete the Building Permit Application plan review. Previous items that were addressed and completed that need no further action have been removed. New comments made to previous items are shown as Bold Italic. 3. Sheet S1.2 and S1.3 provide generic connector schedules. Details 3&4/S6.3 indicate to use an H5 connector. Details mentioned above as well as 5,6,8/S6.3 give an option to use either 1 or 2 connectors based on the uplift. The specific connector and the number of connectors to be used are not allowed to be selected in the field by the contractor. Either specify specific connector and quantity for each truss on the drawings or add note stating that connectors to be installed per signed and sealed truss connector shop drawing schedule. What occurs when the uplift exceeds 1,200? Possibly the girder trusses? 5. Sheet S1.3 has a generic truss to wood connector schedule however the details indicate some of the connectors to be used. The note #1 of this schedule indicates to provide truss anchor that provides an uplift capacity equal to or greater than the uplift indicated on the truss shop drawings. This is not acceptable, note shall be removed or modified. The drawings need to identify the specific connector(s) to use for each truss or a signed and sealed truss connector shop drawing can be included during construction as a part of the truss shop drawing package. This note was modified however it still lets the contractor select the connectors to use out in the field. This is not acceptable. Refer to note 5 comments as to what is acceptable. 14. Detail 8/S6.2 identifies a precast lintel, see schedule. Based on the on Sheet S1.2 the first floor level would require an 8" high lintel and the second floor level would require a 24" high lintel. This is not consistent with what is shown on the elevations as well as the architectural detail 8/A7.1. Revise detail(s) and drawing(s) as necessary to provide consistent information. The details were revised however sheet S1.2 removed lintels for lengths over 12'-0". Sheet A3.1 dimensions the clear opening width as 12'-8". Please clarify what lintel is to be used here. 17. Provide information identifying how railing & balusters will be constructed and installed to meet structural loading. In addition identify if any posts are required, if so provide size spacing and attachment detail(s) to comply with Florida Building Code Section 1015. Response to this item refers you to sheet A8.4 however this is not a revised sheet. The only details on this sheet are door installation details. Provide requested information. ------------------------------------------------- Carl L. Cote, R.A. Senior Plans Examiner City of Palm Coast - Building Department 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-4753 [fax]: (386) 986-3781 [email]: ccote@ci.palm-coast.fl.us -------------------------------------------------
BLD HOLD 05/25/2006 06/08/2006
Note: Held By: CCOTE CITY OF PALM COAST BUILDING DIVISION Comments on Permit Application No. 2006041047 (Tuscan Reserve Building - 100) The following items must be submitted in order to complete the Building Permit Application plan review. 1. The drawing sets contain drawings for all building types. To help us expedite our review and to make it less cumbersome for our inspectors to check the drawings out in the field we are requesting that the drawing sets be made building specific. For example building 100 shall have all drawings removed that do not apply to this building and shall have details on sheets to remain that do not apply to be removed, (manually crossing out is acceptable). In addition, it is not clear what building applies to each permit since the permit applications reference 100, 200, 300, … and the site plan on A1.0 indicates 1, 2,3, … Also, none of the garages are numbered and no permits have been applied for these buildings yet. It is also highly recommended that each garage building be permitted separately. 2. Sheet S3.1, Note 4: This note conflicts with size of opening indicated on sheet A2.1 General Note #1. Revise either drawing note so that size is consistent. 3. Sheet S1.2 and S1.3 provide generic connector schedules. Details 3&4/S6.3 indicate to use an H5 connector. 4. Sheet S1.2 has a generic truss to masonry connector schedule however the details show that the trusses will be bearing on wood plates that are on top of the masonry wall. Clarify where these connectors will be used and if not to be used then remove. The note #2 of this schedule indicates to provide truss anchor that provides an uplift capacity equal to or greater than the uplift indicated on the truss shop drawings. This is not acceptable, note shall be removed or modified. The drawings need to identify the specific connector(s) to use for each truss or a signed and sealed truss connector shop drawing can be included during construction as a part of the truss shop drawing package. 5. Sheet S1.3 has a generic truss to wood connector schedule however the details indicate some of the connectors to be used. The note #1 of this schedule indicates to provide truss anchor that provides an uplift capacity equal to or greater than the uplift indicated on the truss shop drawings. This is not acceptable, note shall be removed or modified. The drawings need to identify the specific connector(s) to use for each truss or a signed and sealed truss connector shop drawing can be included during construction as a part of the truss shop drawing package. 6. Detail 8/S6.3 has a note to refer to Sheet S1.01 for shear wall location. This sheet could not be found. Either revise note or provide missing sheet. 7. Sheet A2.1, General Note #3 refers to a shearwall schedule. This schedule could not be found and it appears that none apply to this plan. Either remove note or provide schedule. 8. Sheet A2.1, General Note #9 references an outdated code and incorrect section. Update code year and section reference. 9. Detail 2/A2.1 has wall hatching at the tenant separation walls per the Wall Legend. They appear to be hatched for a standard masonry wall was well as hatched for 1-hour rated studs. Hatch wall to indicate a 1-hour rated masonry wall. 10. Detail 6&7/A7.2 have a note that references UL# L5211. Update note to reference correct UL#. 11. Sheet A7.2, Note 03300L references a concrete beam. This note is not referenced on all details that have a concrete beam. The details that have this beam appear to show the beam as 2 courses high and at locations that are not aligned with the bolt locations. The note also refers you to the structural drawings where it is shown on Details 1&3/A6.2 which appears to show the beam as 3 courses high however, the note only indicates the beam as 1 course. Clarify notes and details to be clear and consistent. 12. Sheet A4.1 Note 6; Sheets A6.1, A6.2, A6.3 Note 16; Sheet A11.3, A7.2 Note 11; Sheet A11.1 Note 9; Sheet A11.2 Note 8 all reference an outdated code and incorrect section. Update code year and section reference. 13. Detail 8/S6.2 does not match Detail 8/A7.1. Revise either detail to provide consistent information. 14. Detail 8/S6.2 identifies a precast lintel, see schedule. Based on the on Sheet S1.2 the first floor level would require an 8" high lintel and the second floor level would require a 24" high lintel. This is not consistent with what is shown on the elevations as well as the architectural detail 8/A7.1. Revise detail(s) and drawing(s) as necessary to provide consistent information. 15. Drawing General Notes, many sheets. There is a note that states "Provide double pane glass at all exterior windows". The energy calculations indicate (single default). Revise notes or update energy calculations to provide consistent information. 16. Detail 5/A8.1 has note 06100.K for a header, see structural. Sheet S3.4 indicates an H3 over the garage doors however no description of this could be found. Provide header information. 17. Provide information identifying how railing & balusters will be constructed and installed to meet structural loading. In addition identify if any posts are required, if so provide size spacing and attachment detail(s) to comply with Florida Building Code Section 1015. 18. Detail 10/A7.3. Modify note to state that access panel is a fire-rated access panel and that the rating shall match the ceiling assembly it is installed in. 19. Sheet P2.1 has a detail tag reference for a 1/P6.2 however Sheet P6.2 does not have any numbered details. 20. Sheet H3.1, Note 10 shall be modified to include a label that shall be placed adjacent to where the exhaust enters the wall. The label shall bear the words: "This dryer shall meet or exceed the exhausting thru a developed length of *** per the dryer manufacturer's installation instructions." *** shall be the actual developed length installed. 21. Sheet E3.1 and E3.2, Receptacles on living room side of wall between kitchen and living room, and that are within 6-feet of the kitchen sink must be GFCI protected. 22. Sheet E3.1 and E3.2, Show attic access location, attic light, as well as how attic lighting will be switched. 23. Sheet E3.2, Provide receptacle in bedroom hallway adjacent to panel C. 24. The building elevations show outdoor building lighting which is not indicated on the house panel or indicated anywhere on the electrical drawings. 25. The first floor entry porches indicate a junction box for future lighting and the entry porches for the 2nd floor units do not indicate any lighting. Lighting must be provided at time of construction at areas of exit discharge to meet the requirements of Building Code Section 1006.1.3. 26. Sheet E5.1. The light fixture types are not indicated for any of the lighting fixtures. 27. Sheet E6.1, The house panel does not indicate exterior building lighting. It also indicates a photo cell for the porch lighting and the plans indicate this light to be switched; verify whether this is on the house panel or tenant panel and whether it is on a photo cell. 28. Sheet E6.1, Meter Center #2 indicates type 'B' on diagram and the load summary indicates type 'C' units. Modify diagram or summary to be consistent. 29. Sheet E6.2, Grounding Detail. This detail indicates the ground rods to be a minimum of 6" separation. The NEC requires a minimum 6-foot separation per 250.56. 30. Energy Code Packets. The floor areas indicated do not match those on the drawings. Provide separate packets for each floor level due to floor area differences as well as ceiling type differences. In addition, provide 1st and 2nd floor packets for the middle 'B' units due to exterior wall differences as well as glazing differences. In addition, all packets must be signed at the Owner/Agent section. ------------------------------------------------- Carl L. Cote, R.A. Senior Plans Examiner City of Palm Coast - Building Department 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-4753 [fax]: (386) 986-3781 [email]: ccote@ci.palm-coast.fl.us -------------------------------------------------
FD1 COMPLETE 05/22/2006 05/24/2006
Note: Released By: JPATTEE
FD1 COMPLETE 04/27/2006 05/09/2006
Note: Released By: JPATTEE Held By: JPATTEE Plans submitted indicate automatic fire sprinklers per NFPA 13R, provide design criteria.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 02/26/2007
REVISION ¤40.00 01/26/2007
REVISION ¤40.00 01/26/2007
REVISION ¤40.00 01/26/2007
REVISION ¤40.00 01/26/2007
REINSPECTION FEE ¤40.00 01/26/2007
REINSPECTION FEE ¤40.00 01/26/2007
REINSPECTION FEE ¤40.00 01/26/2007
SCHOOL BOARD IMPACT FEE MULTI ¤7,448.00 08/15/2006
TRANS IMPACT FEE - CONDO/APT ¤13,115.68 08/15/2006
ADMIN FEE ¤20.00 08/15/2006
BUILDING CODE ADMIN FUND ¤49.52 08/15/2006
ELECTRIC FEE ¤502.12 08/15/2006
FIRE PLANS REVIEW ¤99.04 08/15/2006
FIRE IMPACT FEE 4-1-06 ¤1,434.96 08/15/2006
MECHANICAL FEE ¤502.12 08/15/2006
PERMIT FEE ¤4,327.80 08/15/2006
PARKS IMPACT FEE 4/1/06 ¤9,272.16 08/15/2006
PLAN CHECK FEE ¤904.91 08/15/2006
PLUMBING FEE ¤502.12 08/15/2006
RADON FEE ¤49.52 08/15/2006
Fees Total Due: ¤0.00 Total Paid: ¤38,547.95