I want to search for...
Permit #2006050160
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-00700-0120 |
| CONDITIONED SPACE: 2191 sqft |
| GARAGE: 462 sqft |
| SCREEN PORCH (SOLID ROOF) : 148 sqft |
| OPENED PORCH (WITH ROOF) : 60 sqft |
| Total Square Footage: 2861 sqft |
| Block: 00700 |
| Subdivision: - |
| Job Phone: (386)445-9009 |
| Location Address: 6 ELIAS LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/18/2006 |
| NOC: RECORDED |
| Applicant name: BRIAN ANDREW GAZZOLI |
| Owner: SEAGATE HOMES INC |
|
Address 185 CYPRESS POINT PKWY PALM COAST, FL 32164 |
| Lot: 0120 |
| Contracted Stated Job Value: ¤244,049.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SEAGATE HOMES INC.
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
185 CYPRESS POINT PARKWAY Palm Coast, FL 32137 |
SUITE 7 Palm Coast, FL 32137 |
CRC057202 (Exp: 08/31/2010) | 386-246-6125 | 386-246-6124 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
MICHAEL G MORELLO JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2 HARGROVE GRADE PALM COAST, FL 32137 |
CAC014293 (Exp: 08/31/2014) | (386)447-3950 | (386)446-4614 |
DENNIS GENE GAINEY
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P.O. BOX 1203 Bunnell, FL 32110 |
CFC046004 (Exp: 08/31/2026) | (386) 437-5637 | 386-437-3012 |
MILLARD K KELLER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
313 S. VOLUSIA AVENUE DELAND, FL 32724 |
CCC1325778 (Exp: 08/31/2010) | (386) 774-9961 | (386)774-2388 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 03/21/2007 | FINAL APPROVED | DROCKWELL |
| STORMWATER FINAL INSPECTION | 03/20/2007 | APPROVED - AS NOTED | GLALIMA |
| Note: THIS IS A REINSPECTION ITHS ROAD HAS A 1/12 TO 2 '' OVER LAY JULY / AUG 16 FEET OF ROAD DAMAGE = 228.00 DOLLARS. | |||
| STORMWATER FINAL INSPECTION | 03/14/2007 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: SWEEP ALL OF ROAD AS I CAN ASSESS . THIS ROAD HAS A NEW 2'' OVER LAY . | |||
| RESIDENTIAL EARLY POWER | 03/13/2007 | APPROVED | LHITES |
| Note: | |||
| UTILITY COMPANY FINAL | 03/09/2007 | APPROVED | TREESE |
| DRIVEWAY | 02/26/2007 | APPROVED | GLALIMA |
| Note: THIS IS A REINSPECTION 2 / 27 / 07 READY TO POUR. | |||
| DRIVEWAY | 02/22/2007 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: NOT FORMED / SEAGATE AT ALL MOST 10:00 AM ALL READY FAILED . | |||
| LATH /BRICK FLASHING | 01/19/2007 | APPROVED | DROCKWELL |
| INSULATION INSPECTION | 01/12/2007 | APPROVED | PGALLMANN |
| ALL ROUGH | 01/10/2007 | APPROVED | PGALLMANN |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 01/10/2007 | APPROVED | PGALLMANN |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 11/13/2006 | Disapproved -FEE REQUIRED | PGALLMANN |
| Note: NO PLANS. INCOMPLETE LIST FOLLOWS: 1) MISSING NUTS & WASHERS FOR SOLE PLATE AT GARAGE SHEER WALL. 2) MISSING BOLTS AT GARAGE SHEER WALL TO CMU CONNECTION. 3) OVER-FRAMING MISSING STRAPS AT RIDGE POLE ENDS, AND AT RIDGE POLE TO RAFTER JOINTS. 4) BRIDGING MISSING FROM TOP OF GABLE ENDS (FOUR FOOT IN TO SECOND TRUSS). 5) BRIDGING MISSING ON RIGHT SIDE OF RIDGE POLE, OVER KITCHEN. | |||
| LINTEL | 10/12/2006 | APPROVED | DROCKWELL |
| FOUNDATION SURVEY APPROVED BY STORMWATER | 10/11/2006 | APPROVED | WKINELL |
| MONOLITHIC SLAB INSPECTION/SLAB | 10/03/2006 | APPROVED | PGALLMANN |
| FIRST ROUGH PLUMBING INSPECTION | 09/28/2006 | APPROVED | ACOOPER |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 02/13/2007 | 02/14/2007 |
| Note: Released By: LAPTEKAR received amended topo 2/13 swale plan completed 2/13 | |||
| SW1 | COMPLETE | 08/14/2006 | 07/17/2006 |
| Note: Released By: LAPTEKAR Released By: LAPTEKAR received topo survey 7/17/06 and site plan ....the benchmark was revised | |||
| BLD | COMPLETE | 08/14/2006 | 08/15/2006 |
| Note: Released By: CCOTE Approved for Release. Revision: Plan changes. | |||
| BLD | COMPLETE | 05/04/2006 | 05/05/2006 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Auba. | |||
| SW1 | HOLD | 05/03/2006 | 05/11/2006 |
| Note: Held By: LAPTEKAR topo survey provided missing the culvert invert elevations of the neighboring improved properties. | |||
| ZON | COMPLETE | 05/03/2006 | 05/04/2006 |
| Note: Released By: DRAMIREZ | |||
| SW1 | HOLD | 07/12/2006 | |
| Note: Held By: LAPTEKAR Please provide 3 sealed topo surveys showing the culvert elevations of the neighboring improved properties. The original submission was missing this information. The recently submitted revision was a copy of the new topo survey and only sealed copies can be accepted. | |||
| SW1 | HOLD | 02/12/2007 | |
| Note: Held By: EBLACKER Survey has mixed relative and GPS data. Swales are shown 3 feet deeper than they are. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ENGINEERING ROAD DAMAGE | ¤228.00 | 03/21/2007 |
| EARLY POWER INSPECTION | ¤40.00 | 03/21/2007 |
| REINSPECTION FEE | ¤40.00 | 03/21/2007 |
| REVISION | ¤40.00 | 03/21/2007 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 03/21/2007 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 03/21/2007 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 03/21/2007 |
| SW REVISION | ¤40.00 | 03/21/2007 |
| TRANS IMPACT FEE 4 - PER UNIT | ¤3,248.51 | 07/18/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 07/18/2006 |
| STORM WATER PERMIT FEES | ¤80.00 | 07/18/2006 |
| ADMIN FEE | ¤20.00 | 07/18/2006 |
| ARC HOUSE REVIEW | ¤125.00 | 07/18/2006 |
| BUILDING CODE ADMIN FUND | ¤14.31 | 07/18/2006 |
| ELECTRIC FEE | ¤177.00 | 07/18/2006 |
| FIRE IMPACT FEE 4-1-06 | ¤179.37 | 07/18/2006 |
| MECHANICAL FEE | ¤177.00 | 07/18/2006 |
| PERMIT FEE | ¤955.50 | 07/18/2006 |
| PARKS IMPACT FEE 4/1/06 | ¤1,159.02 | 07/18/2006 |
| PLAN CHECK FEE | ¤98.00 | 07/18/2006 |
| PLUMBING FEE | ¤177.00 | 07/18/2006 |
| RADON FEE | ¤14.31 | 07/18/2006 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,518.02 |