Permit #2006050346
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-00620-0050 |
| CONDITIONED SPACE: 2548 sqft |
| GARAGE: 488 sqft |
| OPENED PORCH (WITH ROOF) : 350 sqft |
| OPENED PORCH (WITH ROOF) : 80 sqft |
| OPENED PORCH (WITH ROOF) : 30 sqft |
| Total Square Footage: 3496 sqft |
| Block: 00620 |
| Subdivision: - |
| Job Phone: (386)447-0818 |
| Location Address: 117 LARAMIE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/20/2006 |
| NOC: RECORDED |
| Applicant name: GREGORY ALLAN NELSON |
| Owner: HERITAGE HOMES OF PALM COAST INC |
|
Address PO BOX 354022 PALM COAST, FL 32135 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: SINGLE FAMILY |
| Type: CN |
Contractor
HERITAGE HOMES OF PALM COAST INC.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
12 PRINCESS KIM LANE PALM COAST, FL 32137 |
CBC1251716 (Exp: 09/30/2008) | (386)447-0818 | (386)447-0359 |
Sub Contractors
MARTIN JOHN EVANS
| Status | Location Address | State License Number |
| ACTIVE |
14 FORT CAROLINE CT BUNNELL, FL 32110 |
CFC057676 (Exp: 08/31/2026) |
JEFFREY JAY MITCHELL
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
PO BOX 353178 PALM COAST, FL 32135 |
CCC1327078 (Exp: 08/31/2010) | (386)437-3929 | (386)447-2236 |
KENNETH J LOEPER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
PO BOX 353782 PALM COAST, FL 32164 |
ES12000379 (Exp: 08/31/2010) | (386)931-5106 | (386)986-2272 |
THOMAS ALAN MOSE
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO BOX 1894 HOLLY HILL, FL 32117 |
CAC048082 (Exp: 08/31/2026) | 386-255-4545 | (386)252-4979 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 04/11/2007 | FINAL APPROVED | MMOORE |
| FINAL COMPLETE BUILDING INSPECTION | 04/05/2007 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: NEED REVISION ON ENERGY SHEETS TO SHOW 2ND HOT WATER HEATER. | |||
| FINAL COMPLETE BUILDING INSPECTION | 04/04/2007 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: NEED TO HAVE ENERGY CALCS.....NEED INSULATION CERTIFICATE......NEED TO SEAL HLOES IN KITCHEN...NEED VACUM BREAKER AT LAUNDRY TUB... | |||
| UTILITY COMPANY FINAL | 04/02/2007 | APPROVED | TSCHWEERS |
| RESIDENTIAL EARLY POWER | 04/02/2007 | APPROVED | LHITES |
| Note: CALLED FPL 4/2 | |||
| STORMWATER FINAL INSPECTION | 03/28/2007 | APPROVED - AS NOTED | DRANDALL |
| Note: 24 sf road damage// road repaired by builder//verified 4/3 | |||
| PRE DRIVEWAY | 02/22/2007 | APPROVED | DRANDALL |
| INSULATION INSPECTION | 12/13/2006 | APPROVED | MMOORE |
| Note: THIS IS A REINSPECTION | |||
| INSULATION INSPECTION | 12/01/2006 | Disapproved - NO FEE | MMOORE |
| Note: 1. seal around dryer vent at roof | |||
| LATH /BRICK FLASHING | 11/14/2006 | APPROVED | MMOORE |
| Note: 1. REMINDER....TAPCON EYEBROWS FOR INSULATION INSPECTION 2. THIS WAS NOT COMPLETED BY ALL-ROUGH, ITEM #9 DATED 10-2-06 3. LEAVE AREAS TO BE TAPCONNED OPEN FOR INSPECTION AT INSULATION INSPECTION 4. LATH INSPECTION PASSES 5. NO FEE | |||
| ALL ROUGH | 10/31/2006 | APPROVED | MMOORE |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 10/02/2006 | APPROVED - AS NOTED | MMOORE |
| Note: THIS IS A REINSPECTION 1. PAGE 4/6 'GABLE END DTL' 2. NAIL BUCKETS/ GARAGE 3. 2-PLY/ GDR01 /OUTSIDE WALL / NAIL STRAPS 4. 2-PLY / GDR01 / INTERIOR WALL/ CONTINIOUS LOAD PATH 5. INSULATED BLOCK WALLS/ 2X4 P.E. AT TOP/ NOT 1X4 NAILED OVER INSULATION BOARD 6. DETAIL 12/F, MSTA 24" (SIMPSON REQUIRED) 7. NO FEE 8. COMPLETE FOR ALL-ROUGH INSPECTION 9. TAPCON EYEBROWS/ WILL FAIL IF NOT TAPCONNED | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 09/29/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: 1. STRAP TWO FRONT GABLES TO WALLS BELOW 2. FINISH THREADED DOWN-RODS 3. TAPCON (OR SHOOT) EYEBROWS | |||
| LINTEL | 08/08/2006 | APPROVED | MMOORE |
| FOUNDATION SURVEY APPROVED BY STORMWATER | 08/07/2006 | APPROVED | WKINELL |
| MONOLITHIC SLAB INSPECTION/SLAB | 07/26/2006 | APPROVED | MMOORE |
| FIRST ROUGH PLUMBING INSPECTION | 07/21/2006 | APPROVED | MMOORE |
| Note: THIS IS A REINSPECTION | |||
| FIRST ROUGH PLUMBING INSPECTION | 07/20/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: waterlines not protected at pipe crossings |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 04/09/2007 | 04/10/2007 |
| Note: Released By: CCOTE Approved for Release. REVISION: Revised energy calcs. Please call the following numbers: Office 447-0818 Cell 585-0041 | |||
| SW1 | COMPLETE | 02/13/2007 | 02/15/2007 |
| Note: Released By: LAPTEKAR surveys revised | |||
| SW1 | HOLD | 01/16/2007 | 01/16/2007 |
| Note: Held By: EBLACKER We cannot complete the swale plan for this property due to a datum elevation discrepancy on the topographic survey. We check the topographic surveys against the city's as-built drawings corrected to the NAVD of 1988. Due to a swale rehab project in the area we have verified the as built elevations and found them the be between .08' and .18' higher than the original design elevations, which is consistent with the roads having been overlaid. The elevations are lower than we expected by 0.43 ft. which is outside our acceptable limits. Please submit three signed sealed topographic surveys for this property showing corrected elevations. If we can be of help regarding this issue please call (386) 986-4760. NOTE: When topographic survey elevations are changed, all documents that reference or duplicate those elevations must also be revised. | |||
| BLD | COMPLETE | 08/24/2006 | 08/24/2006 |
| Note: Released By: CCOTE Approved for Release. REVISION: GO-BOLT 2nd floor tie-down detail option. | |||
| SW1 | COMPLETE | 06/26/2006 | 06/26/2006 |
| Note: Released By: LAPTEKAR straightened driveway ...50' from interesection | |||
| BLD | COMPLETE | 06/06/2006 | 06/08/2006 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Auba. | |||
| SW1 | COMPLETE | 06/06/2006 | 06/06/2006 |
| Note: Released By: LAPTEKAR Received sealed copies of topo | |||
| BLD | HOLD | 05/16/2006 | 05/16/2006 |
| Note: Held By: JJOSEPH 4- Provide LVL Size and Ply number on a sealed and signed sheet | |||
| ZON | COMPLETE | 05/10/2006 | 05/15/2006 |
| Note: Released By: ECOYNE | |||
| SW1 | HOLD | 05/08/2006 | 05/25/2006 |
| Note: Held By: LAPTEKAR need 3 sealed topo surveys using 1988 NAVD datum and a matching lot grading plan Checked main file....there are no extra sealed copies | |||
| ZON | HOLD | 05/08/2006 | 05/09/2006 |
| Note: Held By: ECOYNE File package did not have sealed survey, site plans, landscape plans - called & informed contractor |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | ¤40.00 | 04/11/2007 |
| REINSPECTION FEE | ¤40.00 | 04/11/2007 |
| REINSPECTION FEE | ¤40.00 | 04/11/2007 |
| REINSPECTION FEE | ¤40.00 | 04/11/2007 |
| REINSPECTION FEE | ¤40.00 | 04/11/2007 |
| REVISION | ¤40.00 | 04/11/2007 |
| REVISION | ¤40.00 | 04/11/2007 |
| ADDITIONAL FEE | ¤40.00 | 04/11/2007 |
| ADDITIONAL FEE | ¤40.00 | 04/11/2007 |
| SW REVISION | ¤40.00 | 04/11/2007 |
| SW REVISION | ¤40.00 | 04/11/2007 |
| TRANS IMPACT FEE 4 - PER UNIT | ¤3,248.51 | 06/20/2006 |
| ADMIN FEE | ¤20.00 | 06/20/2006 |
| ARC HOUSE REVIEW | ¤125.00 | 06/20/2006 |
| BUILDING CODE ADMIN FUND | ¤17.48 | 06/20/2006 |
| ELECTRIC FEE | ¤210.00 | 06/20/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 06/20/2006 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/20/2006 |
| FIRE IMPACT FEE 4-1-06 | ¤179.37 | 06/20/2006 |
| MECHANICAL FEE | ¤210.00 | 06/20/2006 |
| PERMIT FEE | ¤1,170.00 | 06/20/2006 |
| PARKS IMPACT FEE 4/1/06 | ¤1,159.02 | 06/20/2006 |
| PLAN CHECK FEE | ¤120.00 | 06/20/2006 |
| PLUMBING FEE | ¤210.00 | 06/20/2006 |
| RADON FEE | ¤17.48 | 06/20/2006 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,806.86 |