I want to search for...

Permit #2006050402

Permit Details

Status: COED

Parcel Id: 07-11-31-7035-01280-0020
CONDITIONED SPACE: 2875 sqft
GARAGE: 596 sqft
OPENED PORCH (WITH ROOF) : 80 sqft
OPENED PORCH (WITH ROOF) : 56 sqft
Total Square Footage: 3607 sqft
Block: 01280
Subdivision: -
Job Phone: (386)597-6809
Location Address: 6 BIDDING PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/23/2006
NOC: RECORDED
Owner: WEEKLEY HOMES L.P.

Address

1111 N POST OAK RD

HOUSTON, TX 77055

Address

6221 8TH AVENUE

HOUSTON, TX 77055

Lot: 0020
Contracted Stated Job Value: ¤220,000.00
Job Description: SINGLE FAMILY
Type: CN

Contractor

WEEKLEY HOMES,L.P.
Status Location Address State License Number Phone Fax
CANCEL

448 VICTORIA HILLS DRIVE

DELAND, FL 32724

CBC053082 (Exp: 08/31/2012) (386)775-7206 (386)775-1709

Sub Contractors

CHRISTIAN MASARIK
Status Location Address State License Number Phone Fax
CANCEL

6321 GOMEZ ROAD

ST. AUGUSTINE, FL 32084

EC13001175 (Exp: 08/31/2010) (904)829-2700 (904)829-2751
TYRENE SCOTT
Status Location Address State License Number
CANCEL

9556 HISTORIC KINGS RD ST #306

JACKSONVILLE, FL 32206

CAC035526 (Exp: 09/30/2008)
GARY WAYNE EVERS
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 740106

ORANGE CITY, FL 32763

CFC050566 (Exp: 08/31/2026) 386-775-0909 386-775-0918
JEFFREY LUIS CARRASCO
Status Location Address State License Number Phone Fax
CANCEL

665 W. COUNTY ROAD 2006

BUNNELL, FL 32110

CCC1325557 (Exp: 08/31/2010) 904-674-4730 904-268-0471

Inspection History

Type Request Date Result Inspector
FINAL COMPLETE BUILDING INSPECTION 12/13/2006 FINAL APPROVED MMOORE
STORMWATER FINAL INSPECTION 12/11/2006 APPROVED - AS NOTED DRANDALL
Note: THIS IS A REINSPECTION 25 sf road damage
RESIDENTIAL EARLY POWER 12/07/2006 APPROVED RMARVEL
UTILITY COMPANY FINAL 12/06/2006 APPROVED TSCHWEERS
STORMWATER FINAL INSPECTION 12/05/2006 Disapproved -FEE REQUIRED DRANDALL
Note: remove all trash from left, rear, & right adj. property, thrown in by sub contractors..... marked with blue paint.....25 sf road damage $ 300.00
DRIVEWAY 10/02/2006 APPROVED DRANDALL
LATH /BRICK FLASHING 09/07/2006 APPROVED JLEVRAULT
INSULATION INSPECTION 08/29/2006 APPROVED MMOORE
ALL ROUGH 08/11/2006 APPROVED MMOORE
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 08/08/2006 APPROVED MMOORE
Note: 1. ITEMS #1 & #2 (FROM 7-21-06) NOT COMPLETED 2. OSB AT BACKWALL NOT FLUSH WITH OSB ABOVE WINDOW
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 07/21/2006 Disapproved -FEE REQUIRED MMOORE
Note: 1. LEFT BEARING WALL / GARAGE TRUSSES BEARING CENTER BETWEEN STUDS ADD A STUD UNDER THESE TRUSSES. 2. OSB OUTSIDE AT REAR OF BUILDING AT BOTTOM NOT NAILED OFFF PER NAIL PATTERN ADD 2X4 BLOCKS NEXT TO FLOOR JOIST NAIL TO FLOOR JOISTS / NAIL OFF - OSB. 3. 2ND FLOOR: NAIL EXTERIOR OFF PER PLAN. 4. 2ND FLOOR: OVER DOOR EXTERIOR WALL (AT ENTRY) NOT CONNECTED TO BLCOK BELOW. 5. 2ND FLOOR: EXTERIOR WALLS LEFT SIDE AND FRONT LEFT CHECK BOTTOM PLATE ATTACHMENT PER PLANS. 6. TAPCON EYEBROWS / GARAGE.
LINTEL 06/30/2006 APPROVED MMOORE
Note: THIS IS A REINSPECTION
LINTEL 06/29/2006 Disapproved -FEE REQUIRED MMOORE
Note: NOT READY FOR INSPECTION...9:27 A.M.
FOUNDATION SURVEY APPROVED BY STORMWATER 06/28/2006 APPROVED WKINELL
MONOLITHIC SLAB INSPECTION/SLAB 06/15/2006 APPROVED MMOORE
Note: THIS IS A REINSPECTION
MONOLITHIC SLAB INSPECTION/SLAB 06/14/2006 Disapproved -FEE REQUIRED MMOORE
Note: FOOTER DOWELS NOT COMPLETE
FIRST ROUGH PLUMBING INSPECTION 06/12/2006 APPROVED MMOORE

Review History

Department Status Date In Date Out
BLD COMPLETE 05/17/2006 05/17/2006
Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Auba.
SW1 COMPLETE 05/09/2006 05/12/2006
Note: Released By: LAPTEKAR
ZON COMPLETE 05/09/2006 05/17/2006
Note: Released By: ECOYNE

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ENGINEERING ROAD DAMAGE ¤300.00 12/20/2006
EARLY POWER INSPECTION ¤40.00 12/20/2006
REINSPECTION FEE ¤40.00 12/20/2006
REINSPECTION FEE ¤40.00 12/20/2006
REINSPECTION FEE ¤40.00 12/20/2006
STORMWATER REINSPECTION FEE ¤35.00 12/20/2006
TRANS IMPACT FEE 4 - PER UNIT ¤3,248.51 05/23/2006
SCHOOL BOARD IMPACT FEE RES ¤3,600.00 05/23/2006
STORM WATER PERMIT FEES ¤80.00 05/23/2006
ADMIN FEE ¤20.00 05/23/2006
ARC HOUSE REVIEW ¤125.00 05/23/2006
BUILDING CODE ADMIN FUND ¤18.04 05/23/2006
ELECTRIC FEE ¤195.00 05/23/2006
FIRE IMPACT FEE 4-1-06 ¤179.37 05/23/2006
MECHANICAL FEE ¤195.00 05/23/2006
PERMIT FEE ¤1,072.50 05/23/2006
PARKS IMPACT FEE 4/1/06 ¤1,159.02 05/23/2006
PLAN CHECK FEE ¤110.00 05/23/2006
PLUMBING FEE ¤195.00 05/23/2006
RADON FEE ¤18.04 05/23/2006
Fees Total Due: ¤0.00 Total Paid: ¤10,710.48