I want to search for...
Permit #2006050416
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-00120-0060 |
| CONDITIONED SPACE: 2321 sqft |
| GARAGE: 464 sqft |
| OPENED PORCH (WITH ROOF) : 250 sqft |
| OPENED PORCH (WITH ROOF) : 43 sqft |
| Total Square Footage: 3078 sqft |
| Block: 00120 |
| Subdivision: - |
| Job Phone: (386)445-7156 |
| Location Address: 19 LUDLOW LN E |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/22/2006 |
| NOC: RECORDED |
| Applicant name: JAMES WILLIAM KIRKSEY |
| Owner: MASTERPIECE HOMES INC |
|
Address 4721 E MOODY BLVD. UNIT5 BLDG 504 BUNNELL, FFL 32110 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤130,714.00 |
| Job Description: SINGLE FAMILY |
| Type: CN |
Contractor
MASTERPIECE HOMES INC.
| Status | Location Address | Mailing Address | Phone | Fax |
| CANCEL |
4721 E. MOODY BLVD. BUNNELL, FL 32110 |
BLDG. 5 UNIT 504 BUNNELL, FL 32110 |
(386)445-7156 | (386)445-7975 |
Sub Contractors
GLEN STEWART COLE
| Status | Location Address | State License Number | Phone | Fax |
| HOLD |
P. O. Box 1677 Palm Coast, FL 32136 |
EC0002522 (Exp: 08/31/2010) | (386) 437-4364 | (386)437-0412 |
MICHAEL DAVID CLARK
| Status | Location Address | State License Number | Phone |
| CANCEL |
P. O. Box 918 Bunnell, FL 32110 |
CAC044867 (Exp: 09/30/2008) | (386) 437-2001 |
RYSZARD ALOJZY SKLADZIEN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2 MARKET PLACE UNIT D PALM COAST, FL 32137 |
CCC057546 (Exp: 08/31/2016) | (386)445-7945 | (386)446-3871 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 12/13/2006 | FINAL APPROVED | MMOORE |
| Note: house passes final insp. ...could not locate placard to sign-off | |||
| STORMWATER FINAL INSPECTION | 12/12/2006 | APPROVED | DRANDALL |
| UTILITY COMPANY FINAL | 12/06/2006 | APPROVED | TSCHWEERS |
| DRIVEWAY | 11/21/2006 | APPROVED | DRANDALL |
| INSULATION INSPECTION | 10/05/2006 | APPROVED | JLEVRAULT |
| LATH /BRICK FLASHING | 09/29/2006 | APPROVED | ACOOPER |
| ALL ROUGH | 09/29/2006 | APPROVED - AS NOTED | ACOOPER |
| Note: Secure wiring within 12" of electrical box. Will check on sisulation inspection. | |||
| ALL ROUGH | 09/26/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: 1. PER NATIONAL ELECTRIC CODE... NON FLEXIBLE RACEWAY NOT ALLOWED AT PANEL..# 312.5 (C) EXCEPTION 2. ROMEX AND RACEWAYS TOP OF PANEL NEC 2002 312.5 (C) EXCEPTION (A) ATTACH 12" ABOVE PANEL | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 09/08/2006 | APPROVED | MMOORE |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 09/05/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: THIS IS A REINSPECTION 1. BOTH ENDS OF TRUSS # T-17 NOT PER TRUSS PLANS/ FRAME PER PLAN OR APPROVED REVISION 2. PAGE S-1 IN PLANS/ REQUIRE 2- 24" STRAPS PER SIDE OF OPENING | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 08/22/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: 1. T03 NAIL TIGHT TOGETHER. 2. ALL 2X12 JOISTS MORE THAN 5 1/2" FROM LAST STUD OF BEARING REQUIRES A STUD UNDER EACH FLOOR JOIST 3. PAGE S1 (IN YELLOW) ALL HEADERS/ LST24 STRAPS REQUIRED ATTACHED PER PLAN 4. TRUSS PLANS/ T-17 (IN YELLOW) | |||
| LINTEL | 06/29/2006 | APPROVED | MMOORE |
| FOUNDATION SURVEY APPROVED BY STORMWATER | 06/28/2006 | APPROVED | LAPTEKAR |
| MONOLITHIC SLAB INSPECTION/SLAB | 06/22/2006 | APPROVED | MMOORE |
| Note: signed-off on 6-20-06, m.m. | |||
| FIRST ROUGH PLUMBING INSPECTION | 06/20/2006 | APPROVED | MMOORE |
| Note: SCHEDULED A FIRST ROUGH PLUMBING INSPECTION FOR 6/20/06 AS PER STEVE |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 11/03/2006 | 11/03/2006 |
| Note: Released By: LAPTEKAR received new topo survey 11/3/06...forwarded to Eng. Tech. | |||
| SW1 | HOLD | 10/13/2006 | 10/13/2006 |
| Note: Held By: EBLACKER The topographic survey submitted has a problem. The roadway and edge of pavement elevations at the extended property lines do not match our as built drawings . There may be a busted shot among these elevations. We can not decide which elevation is at fault. The drop in elevation from road centerline to edge of pavement is excessive at the right side. The drop from the left to right at the road center line is excessive also. The edge of pavement elevations show a slope that is counter to the designed direction of flow. Please sort this out and submit a revised topographic survey. | |||
| BLD | COMPLETE | 05/17/2006 | 05/17/2006 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Auba. | |||
| SW1 | COMPLETE | 05/09/2006 | 05/15/2006 |
| Note: Released By: LAPTEKAR | |||
| ZON | COMPLETE | 05/09/2006 | 05/17/2006 |
| Note: Released By: ECOYNE |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 12/28/2006 |
| REINSPECTION FEE | ¤40.00 | 12/28/2006 |
| REINSPECTION FEE | ¤40.00 | 12/28/2006 |
| SW REVISION | ¤40.00 | 12/28/2006 |
| SW REVISION | ¤40.00 | 12/15/2006 |
| REINSPECTION FEE | (¤40.00) | 12/15/2006 |
| SW REVISION | (¤40.00) | 12/15/2006 |
| REINSPECTION FEE | ¤40.00 | 12/15/2006 |
| REINSPECTION FEE | ¤40.00 | 12/15/2006 |
| REINSPECTION FEE | ¤40.00 | 12/15/2006 |
| REINSPECTION FEE | (¤40.00) | 12/15/2006 |
| REINSPECTION FEE | (¤40.00) | 12/15/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 05/22/2006 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/22/2006 |
| ADMIN FEE | ¤20.00 | 05/22/2006 |
| ARC HOUSE REVIEW | ¤125.00 | 05/22/2006 |
| BUILDING CODE ADMIN FUND | ¤15.39 | 05/22/2006 |
| ELECTRIC FEE | ¤165.00 | 05/22/2006 |
| FIRE IMPACT FEE 4-1-06 | ¤179.37 | 05/22/2006 |
| MECHANICAL FEE | ¤165.00 | 05/22/2006 |
| PERMIT FEE | ¤877.50 | 05/22/2006 |
| PARKS IMPACT FEE 4/1/06 | ¤1,159.02 | 05/22/2006 |
| PLAN CHECK FEE | ¤90.00 | 05/22/2006 |
| PLUMBING FEE | ¤165.00 | 05/22/2006 |
| RADON FEE | ¤15.39 | 05/22/2006 |
| TRANS IMPACT FEE 4 - PER UNIT | ¤3,248.51 | 05/22/2006 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,065.18 |