I want to search for...
Permit #2006060389
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-01380-0100 |
| CONDITIONED SPACE: 2653 sqft |
| GARAGE: 491 sqft |
| OPENED PORCH (WITH ROOF) : 263 sqft |
| OPENED PORCH (WITH ROOF) : 61 sqft |
| Total Square Footage: 3468 sqft |
| Block: 01380 |
| Subdivision: - |
| Job Phone: (386)445-9009 |
| Location Address: 1 BILTMORE PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/28/2006 |
| NOC: RECORDED |
| Applicant name: BRIAN ANDREW GAZZOLI |
| Owner: SEAGATE HOMES INC |
|
Address 185 CYPRESS POINT PKWY STE 7 PALM COAST, FL 32164 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤235,824.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SEAGATE HOMES INC.
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
185 CYPRESS POINT PARKWAY Palm Coast, FL 32137 |
SUITE 7 Palm Coast, FL 32137 |
CRC057202 (Exp: 08/31/2010) | 386-246-6125 | 386-246-6124 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
MICHAEL G MORELLO JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2 HARGROVE GRADE PALM COAST, FL 32137 |
CAC014293 (Exp: 08/31/2014) | (386)447-3950 | (386)446-4614 |
DENNIS GENE GAINEY
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P.O. BOX 1203 Bunnell, FL 32110 |
CFC046004 (Exp: 08/31/2026) | (386) 437-5637 | 386-437-3012 |
MILLARD K KELLER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
313 S. VOLUSIA AVENUE DELAND, FL 32724 |
CCC1325778 (Exp: 08/31/2010) | (386) 774-9961 | (386)774-2388 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 03/09/2007 | FINAL APPROVED | MMOORE |
| STORMWATER FINAL INSPECTION | 03/08/2007 | APPROVED | DRANDALL |
| STORMWATER FINAL INSPECTION | 03/02/2007 | Disapproved -FEE REQUIRED | DRANDALL |
| Note: REMOVE do not just cover up dirt pile across street adj. property [follow bobcat tracks in].....remove silt fence in same area.....you will not pass stormwater inspection if you just seed & straw that dirt pile | |||
| UTILITY COMPANY FINAL | 03/01/2007 | APPROVED | DHANEY |
| UTILITY COMPANY FINAL | 02/15/2007 | APPROVED | TSCHWEERS |
| RESIDENTIAL EARLY POWER | 02/15/2007 | APPROVED - AS NOTED | RMARVEL |
| Note: CALLED FPL AT 3:30 R.M. | |||
| PRE DRIVEWAY | 02/13/2007 | APPROVED | DRANDALL |
| LATH /BRICK FLASHING | 01/16/2007 | APPROVED | JLEVRAULT |
| INSULATION INSPECTION | 01/12/2007 | APPROVED | MMOORE |
| ALL ROUGH | 01/10/2007 | APPROVED | MMOORE |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 12/29/2006 | APPROVED | MMOORE |
| LINTEL | 11/29/2006 | APPROVED | MMOORE |
| FOUNDATION SURVEY APPROVED BY STORMWATER | 11/27/2006 | APPROVED | WKINELL |
| MONOLITHIC SLAB INSPECTION/SLAB | 10/30/2006 | APPROVED | MMOORE |
| FIRST ROUGH PLUMBING INSPECTION | 10/24/2006 | APPROVED | MMOORE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 07/21/2006 | 07/28/2006 |
| Note: Released By: LWOODROME Revision: Change house plan | |||
| SW1 | HOLD | 07/19/2006 | 07/19/2006 |
| Note: Held By: LAPTEKAR Revision packet did not have 11x17 size site plan with the FFE and proposed culvert elevation changed. Returned packet to builders box with a note of what is needed. | |||
| BLD | COMPLETE | 06/13/2006 | 06/14/2006 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Auba. | |||
| SW1 | HOLD | 06/12/2006 | 06/14/2006 |
| Note: Held By: LAPTEKAR Proposed FFE of home needs to be at least 1 foot above the crown of the road. The proposed elevations of the culvert pipe and the swale are too high in reference the crown of the road. | |||
| ZON | COMPLETE | 06/12/2006 | 06/13/2006 |
| Note: Released By: HHERKERT | |||
| SW1 | COMPLETE | 07/21/2006 | |
| Note: Released By: LAPTEKAR received new proposed FFE and culvert inverts |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | ¤40.00 | 03/09/2007 |
| EARLY POWER INSPECTION | ¤40.00 | 03/09/2007 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 03/09/2007 |
| TRANS IMPACT FEE 4 - PER UNIT | ¤3,248.51 | 07/28/2006 |
| ADMIN FEE | ¤20.00 | 07/28/2006 |
| ARC HOUSE REVIEW | ¤125.00 | 07/28/2006 |
| BUILDING CODE ADMIN FUND | ¤17.34 | 07/28/2006 |
| ELECTRIC FEE | ¤183.00 | 07/28/2006 |
| FIRE IMPACT FEE 4-1-06 | ¤179.37 | 07/28/2006 |
| MECHANICAL FEE | ¤183.00 | 07/28/2006 |
| PERMIT FEE | ¤994.50 | 07/28/2006 |
| PARKS IMPACT FEE 4/1/06 | ¤1,159.02 | 07/28/2006 |
| PLAN CHECK FEE | ¤102.00 | 07/28/2006 |
| PLUMBING FEE | ¤183.00 | 07/28/2006 |
| RADON FEE | ¤17.34 | 07/28/2006 |
| REVISION | ¤80.00 | 07/28/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 07/28/2006 |
| STORM WATER PERMIT FEES | ¤80.00 | 07/28/2006 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,287.08 |