I want to search for...
Permit #2006060687
Permit Details
Status: COED
| Parcel Id: 4811311700000000440 |
| CONDITIONED SPACE: 3745 sqft |
| GARAGE: 741 sqft |
| OPENED PORCH (WITH ROOF) : 295 sqft |
| OPENED PORCH (WITH ROOF) : 293 sqft |
| OPENED PORCH (WITH ROOF) : 79 sqft |
| Total Square Footage: 5153 sqft |
| Subdivision: - |
| Job Phone: (386) 445-4747 |
| Location Address: 156 WILLOW OAK WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/18/2006 |
| NOC: RECORDED |
| Applicant name: WILLIAM VALENTINE GROFF |
| Owner: COUNTRY CLUB HOMES OF FLORIDA |
|
Address 13 SENTRY OAK PLACE PALM COAST, FL 32137 |
| Lot: 44 |
| Contracted Stated Job Value: ¤475,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
COUNTRY CLUB HOMES OF FLORIDA, INC.
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
4440 N. Oceanshore Blvd Palm Coast, FL 32137 |
SUITE 101 Palm Coast, FL 32137 |
CRC043737 (Exp: 08/31/2012) | (386) 445-4747 | (386)445-5955 |
Sub Contractors
STEVEN DUANE DENSLOW
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
400 N. US # 1 Ormond Beach, FL 32174 |
EC0001678 (Exp: 08/31/2012) | (386) 672-8494 | (386)673-7856 |
DANIEL P HUCKS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
400 N. U.S. 1 Ormond Beach, FL 32174 |
CAC029376 (Exp: 08/31/2024) | 386-672-8494 | 386-673-7856 |
THOMAS WALTER ALBANO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 352075 Palm Coast, FL 32135 |
CFC045991 (Exp: 08/31/2024) | 386-437-2795 | (386)437-2781 |
STEPHEN M RENDE
| Status | Location Address | State License Number | Phone |
| CANCEL |
22 ALAMANDA DRIVE ORMOND, FL 32176 |
CCC058058 (Exp: 08/31/2020) | 386-439-7156 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 07/23/2007 | FINAL APPROVED | JGIBSON |
| Note: CALLED BY CONTRACTOR | |||
| STORMWATER FINAL INSPECTION | 07/18/2007 | APPROVED | DRANDALL |
| Note: William came in to schedule | |||
| UTILITY COMPANY FINAL | 07/18/2007 | APPROVED | TSCHWEERS |
| Note: FAILED, SEWER CLEAN OUT TIED INTO TOP OF 4" STACK WITH A 6-7 FOOT DROP TO ENTER 6" STACK. pass per David mitchum | |||
| RESIDENTIAL EARLY POWER | 06/18/2007 | APPROVED | LHITES |
| LATH /BRICK FLASHING | 03/16/2007 | APPROVED | JGIBSON |
| Note: | |||
| INSULATION INSPECTION | 03/05/2007 | APPROVED | RMARVEL |
| GAS ROUGH | 02/23/2007 | APPROVED | JGIBSON |
| Note: | |||
| ALL ROUGH | 02/23/2007 | APPROVED | JGIBSON |
| Note: | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 02/12/2007 | APPROVED - AS NOTED | JMCGOWEN |
| Note: NEED TO TIGHTEN ALL THREAD AT KIT, FINISH X-BRACING AT GABLE END, FINISH STRAPPING 2PLY GIRDIR ATFRONT DOOR | |||
| GAS ROUGH | 02/12/2007 | APPROVED | JMCGOWEN |
| TEMPORARY POLE | 11/29/2006 | APPROVED | JGIBSON |
| LINTEL | 11/29/2006 | APPROVED | JGIBSON |
| Note: called to release power 11/29 10:45 | |||
| LINTEL | 11/27/2006 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: Missing several dowels,window seals steel needs to extend into ajacent cells further. | |||
| TEMPORARY POLE | 11/27/2006 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION Libby - Susan - 11:00 - 11-27-06 | |||
| TEMPORARY POLE | 11/22/2006 | CANCELLED BY APPLICANT | JGIBSON |
| LINTEL | 11/22/2006 | CANCELLED BY APPLICANT | JGIBSON |
| FOUNDATION SURVEY APPROVED BY STORMWATER | 11/14/2006 | APPROVED | WKINELL |
| MONOLITHIC SLAB INSPECTION/SLAB | 11/08/2006 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 11/07/2006 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: Missing footer steel missing vertical rods not ready. | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 11/06/2006 | CANCELLED BY APPLICANT | JGIBSON |
| Note: Canceled by William. | |||
| FIRST ROUGH PLUMBING INSPECTION | 10/24/2006 | APPROVED - AS NOTED | JGIBSON |
| Note: USE OF UNMETERED WATER WAS OBSERVED. KEITH KING FROM THE UTILITY DEPARTMENT WAS NOTIFIED. | |||
| RETAINING WALL | 10/05/2006 | APPROVED | RMARVEL |
| Note: THIS IS A REINSPECTION | |||
| RETAINING WALL | 10/04/2006 | CANCELLED BY APPLICANT | RMARVEL |
| Note: called to reschedule for first thing in the morning. | |||
| STEM FOOTING FOUNDATION | 09/07/2006 | APPROVED | RMARVEL |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 02/02/2007 | 02/06/2007 |
| Note: Released By: CCOTE Approved for Release. REVISION: Bracket Details. | |||
| BLD | COMPLETE | 08/04/2006 | 08/09/2006 |
| Note: Released By: CCOTE Approved for Release. Revison: Added interior footing and beam at rear porch. | |||
| BLD | COMPLETE | 07/14/2006 | 07/17/2006 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. Reveiw by Auba. | |||
| BLD | HOLD | 06/30/2006 | 07/05/2006 |
| Note: Held By: JJOSEPH 1 - Please provide the sheet S2.2 since the sheet S1.1 indicates details referencing S2.2. 2 -Provide masonry details. 3 -Omit details that do no apply to this specific project. 4- Provide project specific truss connector schedule; identify connectors to be used for each trus connection point | |||
| URB | HOLD | 06/20/2006 | 06/23/2006 |
| Note: Held By: CBENNETT CB 6/23/06 Proper Tree Barricades are required on saved trees before clearing of site. Install barricades and call for reinspection 986.3722. | |||
| SW1 | HOLD | 06/19/2006 | 07/05/2006 |
| Note: Held By: LAPTEKAR Need to check with Eng. Dept. are road improvements complete and checking verbage regarding drainage | |||
| ZON | COMPLETE | 06/19/2006 | 06/20/2006 |
| Note: Released By: HHERKERT | |||
| URB | COMPLETE | 06/30/2006 | |
| Note: Released By: CBENNETT CB 6/30/06 Ken and William will contact me first before clearing the lot. Barricades are installed properly, great job! | |||
| SW1 | COMPLETE | 07/18/2006 | |
| Note: Released By: LAPTEKAR Per Eng Dept. they will put a CO hold on permit until subdiv improvements are made....road is under construction. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | ¤40.00 | 07/24/2007 |
| ADDITIONAL FEE | ¤40.00 | 07/24/2007 |
| REINSPECTION FEE | ¤40.00 | 07/24/2007 |
| REINSPECTION FEE | ¤40.00 | 07/24/2007 |
| REVISION | ¤40.00 | 07/24/2007 |
| REVISION | ¤40.00 | 07/24/2007 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 07/18/2006 |
| STORM WATER PERMIT FEES | ¤80.00 | 07/18/2006 |
| TRANS IMPACT FEE 4 - PER UNIT | ¤3,248.51 | 07/18/2006 |
| ADMIN FEE | ¤20.00 | 07/18/2006 |
| BUILDING CODE ADMIN FUND | ¤25.77 | 07/18/2006 |
| ELECTRIC FEE | ¤315.00 | 07/18/2006 |
| FIRE IMPACT FEE 4-1-06 | ¤179.37 | 07/18/2006 |
| MECHANICAL FEE | ¤315.00 | 07/18/2006 |
| PERMIT FEE | ¤1,852.50 | 07/18/2006 |
| PARKS IMPACT FEE 4/1/06 | ¤1,159.02 | 07/18/2006 |
| PLAN CHECK FEE | ¤190.00 | 07/18/2006 |
| PLUMBING FEE | ¤315.00 | 07/18/2006 |
| RADON FEE | ¤25.77 | 07/18/2006 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤11,565.94 |