I want to search for...
Permit #2006061074
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00620-0130 |
| CONDITIONED SPACE: 2568 sqft |
| GARAGE: 459 sqft |
| OPENED PORCH (WITH ROOF) : 24 sqft |
| OPENED PORCH (WITH ROOF) : 149 sqft |
| OPENED PORCH (WITH ROOF) : 60 sqft |
| Total Square Footage: 3260 sqft |
| Block: 00620 |
| Subdivision: - |
| Job Phone: (386)445-9009 |
| Location Address: 1 BURGESS PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/23/2006 |
| NOC: RECORDED |
| Applicant name: BRIAN ANDREW GAZZOLI |
| Owner: SEAGATE HOMES |
|
Address 185 CYPRESS POINT PKWY PALM COAST, FL 32164 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤276,154.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SEAGATE HOMES INC.
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
185 CYPRESS POINT PARKWAY Palm Coast, FL 32137 |
SUITE 7 Palm Coast, FL 32137 |
CRC057202 (Exp: 08/31/2010) | 386-246-6125 | 386-246-6124 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
MICHAEL G MORELLO JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2 HARGROVE GRADE PALM COAST, FL 32137 |
CAC014293 (Exp: 08/31/2014) | (386)447-3950 | (386)446-4614 |
DENNIS GENE GAINEY
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P.O. BOX 1203 Bunnell, FL 32110 |
CFC046004 (Exp: 08/31/2026) | (386) 437-5637 | 386-437-3012 |
MILLARD K KELLER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
313 S. VOLUSIA AVENUE DELAND, FL 32724 |
CCC1325778 (Exp: 08/31/2010) | (386) 774-9961 | (386)774-2388 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 03/29/2007 | FINAL APPROVED | JMCGOWEN |
| Note: | |||
| STORMWATER FINAL INSPECTION | 03/26/2007 | APPROVED | DRANDALL |
| UTILITY COMPANY FINAL | 03/22/2007 | APPROVED | MBACON |
| RESIDENTIAL EARLY POWER | 03/15/2007 | APPROVED | LHITES |
| Note: Connie requested an early power inspection for 3/15/07 | |||
| PRE DRIVEWAY | 03/08/2007 | APPROVED | DRANDALL |
| INSULATION INSPECTION | 02/02/2007 | APPROVED | MMOORE |
| Note: | |||
| ALL ROUGH | 01/31/2007 | APPROVED | JLEVRAULT |
| LATH /BRICK FLASHING | 01/31/2007 | APPROVED | JLEVRAULT |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 01/17/2007 | APPROVED | JGIBSON |
| LINTEL | 12/01/2006 | APPROVED | MMOORE |
| FOUNDATION SURVEY APPROVED BY STORMWATER | 11/30/2006 | APPROVED | LAPTEKAR |
| MONOLITHIC SLAB INSPECTION/SLAB | 11/17/2006 | APPROVED | MMOORE |
| FIRST ROUGH PLUMBING INSPECTION | 11/13/2006 | APPROVED | ACOOPER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 12/18/2006 | 12/20/2006 |
| Note: Released By: CCOTE Rejected By: CCOTE Repairs are not specific. Provide the following information. 1. Provide project specific truss connector schedule. Identify what connectors to use for each truss. 2. If tapcons are to be an option then provide specific type, size and length. 3. Provide additional information regarding retrofit bolts. What is a retrofit bolt? 4. Provide specific epoxy product to use. Spoke with Kevin Smith 12/27/06, he stated that connectors to be as specified and that epoxy and retrofit bolts are specified on the original drawings. | |||
| URB | HOLD | 08/28/2006 | 08/28/2006 |
| Note: Held By: CBENNETT CB 8/28/06 Barricade down on saved tree. Please reinstall for inspection on 8/29. | |||
| ZON | COMPLETE | 08/18/2006 | 08/18/2006 |
| Note: Released By: ECOYNE | |||
| BLD | COMPLETE | 08/18/2006 | 08/22/2006 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Auba. | |||
| ZON | COMPLETE | 08/14/2006 | 08/18/2006 |
| Note: Released By: ECOYNE | |||
| SW1 | COMPLETE | 06/30/2006 | 07/10/2006 |
| Note: Released By: LAPTEKAR | |||
| ZON | HOLD | 06/30/2006 | 07/05/2006 |
| Note: Held By: HHERKERT left elevation must show horizontal banding continuing down the side of the structure | |||
| ZON | HOLD | 07/12/2006 | |
| Note: Held By: ECOYNE received new elevation does not show any changes new plans have to be sealed | |||
| URB | COMPLETE | 08/31/2006 | |
| Note: Released By: CBENNETT |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | ¤40.00 | 03/30/2007 |
| REVISION | ¤40.00 | 03/30/2007 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 08/23/2006 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/23/2006 |
| TRANS IMPACT FEE 4 - PER UNIT | ¤3,248.51 | 08/23/2006 |
| ADMIN FEE | ¤20.00 | 08/23/2006 |
| ARC HOUSE REVIEW | ¤125.00 | 08/23/2006 |
| BUILDING CODE ADMIN FUND | ¤16.30 | 08/23/2006 |
| ELECTRIC FEE | ¤196.20 | 08/23/2006 |
| FIRE IMPACT FEE 4-1-06 | ¤179.37 | 08/23/2006 |
| MECHANICAL FEE | ¤196.20 | 08/23/2006 |
| PERMIT FEE | ¤1,080.30 | 08/23/2006 |
| PARKS IMPACT FEE 4/1/06 | ¤1,159.02 | 08/23/2006 |
| PLAN CHECK FEE | ¤110.80 | 08/23/2006 |
| PLUMBING FEE | ¤196.20 | 08/23/2006 |
| RADON FEE | ¤16.30 | 08/23/2006 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,304.20 |