Permit #2006080375
Permit Details
Status: COED
| Parcel Id: 15-11-31-2970-00000-1150 |
| CONDITIONED SPACE: 3808 sqft |
| GARAGE: 598 sqft |
| OPENED PORCH (WITH ROOF) : 170 sqft |
| OPENED PORCH (WITH ROOF) : 500 sqft |
| OPENED PORCH (WITH ROOF) : 263 sqft |
| Total Square Footage: 5339 sqft |
| Block: 00000 |
| Subdivision: - |
| Job Phone: (386)672-3955 |
| Location Address: 18 NORTH PARK LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/07/2007 |
| NOC: RECORDED |
| Applicant name: JERRY JAMES COLUMBUS |
| Owner: GOURIN ALEXANDER & |
|
Address MARINA GOURINA H/W PALM COAST, FL 32137 |
|
Address 40 EASTLAKE DRIVE PALM COAST, FL 32137 |
| Lot: 1150 |
| Contracted Stated Job Value: ¤604,647.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
DISCOVERY HOMES INC.
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
300 INTERCHANGE BLVD. PORT ORANGE, FL 32129 |
SUITE B ORMOND BEACH, FL 32174 |
CGC046483 (Exp: 09/30/2008) | (386)672-3955 | (386)672-6958 |
Sub Contractors
GLEN STEWART COLE
| Status | Location Address | State License Number | Phone | Fax |
| HOLD |
P. O. Box 1677 Palm Coast, FL 32136 |
EC0002522 (Exp: 08/31/2010) | (386) 437-4364 | (386)437-0412 |
LARRY MILTON HISS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1315 A LPGA BLVD Holly Hill, FL 32117 |
CAC032450 (Exp: 08/31/2018) | (386) 672-8688 | (386)238-8688 |
STEPHEN M RENDE
| Status | Location Address | State License Number | Phone |
| CANCEL |
22 ALAMANDA DRIVE ORMOND, FL 32176 |
CCC058058 (Exp: 08/31/2020) | 386-439-7156 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 02/19/2008 | FINAL APPROVED | JGIBSON |
| STORMWATER FINAL INSPECTION | 02/12/2008 | APPROVED | DRANDALL |
| UTILITY COMPANY FINAL | 02/05/2008 | APPROVED | TSCHWEERS |
| Note: Gravity ok. | |||
| RESIDENTIAL EARLY POWER | 01/16/2008 | APPROVED | RMARVEL |
| LATH /BRICK FLASHING | 07/27/2007 | APPROVED | RMARVEL |
| INSULATION INSPECTION | 07/13/2007 | APPROVED | CMINI |
| ALL ROUGH | 07/10/2007 | APPROVED - AS NOTED | JGIBSON |
| Note: GUEST TUB NOT SET YET CHECK @ INSULATION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 04/20/2007 | APPROVED | RMARVEL |
| Note: | |||
| RESIDENTIAL EARLY POWER | 04/20/2007 | APPROVED | LHITES |
| Note: Contractor called to schedule an early power inspection for 4/20/07 THIS IS A TUG SERVICE INSPECTION AND IS OK | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 04/16/2007 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: MISSING STRAPS. | |||
| LINTEL | 03/29/2007 | APPROVED | JGIBSON |
| Note: | |||
| FOUNDATION SURVEY APPROVED BY STORMWATER | 03/28/2007 | APPROVED | WKINELL |
| MONOLITHIC SLAB INSPECTION/SLAB | 03/14/2007 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION NEED TO HAVE REVISION BY LINTEL INSPECTION. | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 03/09/2007 | CANCELLED BY APPLICANT | JGIBSON |
| FIRST ROUGH PLUMBING INSPECTION | 03/07/2007 | APPROVED | JGIBSON |
| Note: |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 03/20/2007 | 03/21/2007 |
| Note: Released By: CCOTE Approved for Release. REVISION: Foundation plan change, move garage door from side to front. | |||
| BLD | REJECT | 03/09/2007 | 03/13/2007 |
| Note: Rejected By: CCOTE Details must be signed and sealed. | |||
| SW1 | COMPLETE | 02/02/2007 | 02/02/2007 |
| Note: Released By: LAPTEKAR Driveway columns moved from easement | |||
| URB | HOLD | 01/30/2007 | 01/30/2007 |
| Note: Held By: JBEAUDET need to install tree barricades across the left side builder scheduled a reinspection for the 31st of january 2007 | |||
| URB | COMPLETE | 01/30/2007 | 02/02/2007 |
| Note: Released By: JBEAUDET | |||
| BLD | COMPLETE | 01/19/2007 | 01/19/2007 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Auba. | |||
| BLD | HOLD | 12/19/2006 | 12/20/2006 |
| Note: Held By: JJOSEPH 1- Please clarify in porch section detail (1/A4) ; we cannot find out any connector called ETA22. 2-Specify beam size and connectors at balcony 3- Provide the beam Size (LVLA and LVLB) ( signed and sealed sheet) 4- Specify how the beams will be supported . 5-The Residential System Sizing Calculation sheet was performed by an outdated version of the EnergyGauge software. Any version lower than 4.0 will not be accepted for either code compliance or system sizing. This software is definitely outdated and should be replaced with version 4.21. The ACCA Manual J is 7 in version 3.3 and WILL NOT be accepted any longer. Version 4.0 of the software has ACCA Manual J 8 and should be accepted as it is certified by ACCA as referenced in the current Florida Building Code. In addition, the energy compliance form is an outdated copy (600A-2001), please submit a current version 600A-2004. | |||
| ZON | HOLD | 10/04/2006 | 10/04/2006 |
| Note: Held By: ECOYNE came in with new survey, new placement does not meet setbacks refer to DSD | |||
| DSD | REJECT | 10/04/2006 | 10/05/2006 |
| Note: Rejected By: DCHAUDOIN | |||
| DSD | REJECT | 09/06/2006 | 10/05/2006 |
| Note: Rejected By: DCHAUDOIN | |||
| ZON | HOLD | 09/05/2006 | 09/11/2006 |
| Note: Held By: CBENTLEY Received revised plans. House is not oriented toward front as discussed with Cary. House still does not meet setback requirements. | |||
| URB | HOLD | 08/16/2006 | 01/19/2007 |
| Note: Held By: JBEAUDET NEED TO INSTALL BARRICADES AROUND ALL SAVED TREES AND CALL JOHN WITH URBAN FORESTRY AT 386- 986-3762 FOR A RE-INSPECTION | |||
| SW1 | HOLD | 08/15/2006 | 08/17/2006 |
| Note: Held By: LAPTEKAR there is a column by the driveway in the 7.5' drainage easement | |||
| ZON | HOLD | 08/15/2006 | 08/16/2006 |
| Note: Held By: CBENTLEY Held By: HHERKERT structure does not meet the required front or rear setback. House must be turned to be able to fit on the lot. | |||
| ZON | REJECT | 10/05/2006 | |
| Note: Rejected By: DCHAUDOIN | |||
| DSD | COMPLETE | 12/22/2006 | |
| Note: Released By: CBENTLEY | |||
| ZON | COMPLETE | 12/19/2006 | |
| Note: Released By: ECOYNE approved by DSD/Dee Chaudoin gave back to zoning for processing ecoyne 12/19/06 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | ¤40.00 | 02/20/2008 |
| EARLY POWER INSPECTION | ¤40.00 | 02/20/2008 |
| EARLY POWER INSPECTION | ¤40.00 | 02/20/2008 |
| REINSPECTION FEE | ¤40.00 | 02/20/2008 |
| REVISION | ¤40.00 | 02/20/2008 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 02/07/2007 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/07/2007 |
| TRANS IMPACT FEE 4 - PER UNIT | ¤3,248.51 | 02/07/2007 |
| ADMIN FEE | ¤20.00 | 02/07/2007 |
| BUILDING CODE ADMIN FUND | ¤26.70 | 02/07/2007 |
| ELECTRIC FEE | ¤393.00 | 02/07/2007 |
| FIRE IMPACT FEE 4-1-06 | ¤179.37 | 02/07/2007 |
| MECHANICAL FEE | ¤393.00 | 02/07/2007 |
| PERMIT FEE | ¤2,359.50 | 02/07/2007 |
| PARKS IMPACT FEE 4/1/06 | ¤1,159.02 | 02/07/2007 |
| PLAN CHECK FEE | ¤242.00 | 02/07/2007 |
| PLUMBING FEE | ¤393.00 | 02/07/2007 |
| RADON FEE | ¤26.70 | 02/07/2007 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤12,320.80 |