I want to search for...
Permit #2006080619
Permit Details
Status: COED
| Parcel Id: 18-11-31-0000-02010-0070 |
| COMMERCIAL SQUARE FOOTAGE: 15235 sqft |
| Total Square Footage: 15235 sqft |
| Block: 02010 |
| Subdivision: - |
| Job Phone: (386) 445-4350 |
| Location Address: 5 UTILITY DR |
| Type: CA - COMM ADDITION |
| Issue Date: 11/21/2006 |
| NOC: RECORDED |
| Applicant name: MICHAEL GLEN MACHIN |
| Owner: M MACHIN ENTERPRISES INC |
|
Address P O BOX 353460 PALM COAST, FL 32135 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤1,000,000.00 |
| Job Description: SHELL ADDITION TO THE WOODLANDS COMMON CENTER (RETAIL) |
| Type: CN |
Contractor
MACHIN CONSTRUCTION CO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
3 HARGROVE GRADE SUITE 1 Palm Coast, FL 32137 |
CGC058789 (Exp: 08/31/2024) | (386) 445-4350 | (386)446-5459 |
Sub Contractors
RANDALL E BROWN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
765 HAWKS RIDGE ROAD PORT ORANGE, FL 32127 |
EC13002369 (Exp: 08/31/2014) | (386)761-3179 | (386)767-5013 |
DAVID FRANKLIN POWELL
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
2610 Dobbs Road St. Augustine, FL 32086 |
CAC053851 (Exp: 08/31/2026) | 904-794-2665 | 904-794-2329 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JAMES A. CROSBY III
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
96 HAWKS LANE FLAGLER BEACH, FL 32136 |
CCC0582581 (Exp: 08/31/2010) | (386)986-1234 | (386)439-6439 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 01/28/2008 | FINAL APPROVED | JLEVRAULT |
| Note: When the inspector does the building final-- Please check the roof- per Michael Moore CALLED BY CONTRACTOR | |||
| FIRE FINAL | 01/25/2008 | APPROVED | JLEWIS |
| H.V.A.C. FINAL | 01/25/2008 | APPROVED | JLEVRAULT |
| Note: UNIT NUMBER 28 | |||
| H.V.A.C. ROUGH | 01/18/2008 | APPROVED | JLEVRAULT |
| Note: THIS IS A REINSPECTION PLENUM HAS BEEN MOVED. | |||
| H.V.A.C. FINAL | 01/18/2008 | APPROVED | JLEVRAULT |
| Note: UNITS 18, 19, 20, 21, 22, AND 27. | |||
| RESIDENTIAL EARLY POWER | 01/16/2008 | APPROVED - AS NOTED | RMARVEL |
| Note: UNIT #"S 18-22,27,28 | |||
| H.V.A.C. ROUGH | 01/15/2008 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: need 4 inch clearance between plentums on unit 28 | |||
| ABOVE CEILING | 01/10/2008 | PARTIALLY APPROVED | JLEVRAULT |
| Note: Gary from Machin Construction called to schedule this inspection UNITS 18, 19, 20, 21, 22, 27, AND 28, | |||
| FIREWALL FINAL INSPECTION | 01/10/2008 | APPROVED | JPATTEE |
| UTILITY COMMERCIAL FINAL | 01/08/2008 | APPROVED | KKING |
| UTILITY COMPANY FINAL | 01/08/2008 | APPROVED | MBACON |
| LANDSCAPE FINAL | 12/05/2007 | APPROVED | WBUTLER |
| ALL ROUGH | 11/28/2007 | APPROVED | JLEVRAULT |
| Note: THIS IS A REINSPECTION | |||
| ENGINEERING FINAL | 11/20/2007 | APPROVED | DMAY |
| ALL ROUGH | 10/30/2007 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: NEED TO HAVE 24" BETWEEN RECEPTICALS IN FIREWALLS...... FIRESTOP TOP PLATE OF EXTERIOR WALLS... NEED TO GET REVISIONS TO SHOW ADDED MECHANICAL IN UNITS... NEED TO SHOW ON PLANS HOW MECHANICAL IS SUPPORTED ON BATHROOM WALLS.... O.K. TO SHEETROCK 1 SIDE OF WALLS... | |||
| FRAMING | 08/02/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: THIS IS A REINSPECTION CEILING Z CHANNEL. | |||
| INSULATION INSPECTION | 07/20/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: ROOF ISO SPRAY ON INSULATION. | |||
| RESIDENTIAL EARLY POWER | 07/20/2007 | APPROVED | LHITES |
| Note: HOUSE PANEL ONLY ALL OTHER METER CANS TO BE CAPED BY FPL | |||
| ROOF IN PROGRESS | 06/22/2007 | APPROVED | MMOORE |
| ROOF IN PROGRESS | 06/06/2007 | APPROVED | MMOORE |
| LATH /BRICK FLASHING | 06/05/2007 | APPROVED | MMOORE |
| Note: 1. AREA INSPECTED: DENSGLAS BEHIND ENTRY COLUMNS AND ARCHES AT THE EXTERIOR SOFFIT | |||
| LATH /BRICK FLASHING | 06/01/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: GABLE ENDS. | |||
| LATH /BRICK FLASHING | 05/31/2007 | Disapproved - NO FEE | JLEVRAULT |
| Note: INSPECTION CANCELLED BY JOB SUPER. | |||
| 2ND ROUGH ELECTRICAL | 05/29/2007 | APPROVED | LHITES |
| Note: front walkway recessed lights are ok | |||
| 2ND ROUGH ELECTRICAL | 05/25/2007 | CANCELLED BY APPLICANT | AIRS WEB |
| H.V.A.C. ROUGH | 05/25/2007 | CANCELLED BY APPLICANT | AIRS WEB |
| ALL ROUGH | 05/25/2007 | CANCELLED BY APPLICANT | AIRS WEB |
| LATH /BRICK FLASHING | 05/15/2007 | APPROVED - AS NOTED | MMOORE |
| Note: 1. EXTERIOR DENSGLASS AT 2 CUPOLA ON ROOF | |||
| LATH /BRICK FLASHING | 05/14/2007 | APPROVED | MMOORE |
| Note: Rick called in inspection Partial Inspection for dense glass sofits 1. INSPECTED DENSGLASS AT EAST AND N.WEST SIDES OF BLDG. AT SOFFITS AND FASCIA 2. ARCH FRAMING CHECKED AND IS TAPCONNED 3. SCRATCH, BROWN AND FINISH COATES APPLIED TO EAST AND N. WEST EXTERIOR WALLS...TEXTURE NOT APPLIED 4. ARCHES NOT LATHED | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 05/08/2007 | APPROVED | MMOORE |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 05/08/2007 | APPROVED | MMOORE |
| FRAMING | 05/08/2007 | Disapproved -FEE REQUIRED | MMOORE |
| Note: 1. ROOF FROM NEW STRUCTURE TO EXISTING BUILDING / NEED FRAMING DETAIL 2. ARCHES AT ENTRY AREA NEED TO BE ATTACHED AT 12" O.C. | |||
| LINTEL | 03/14/2007 | APPROVED | JLEVRAULT |
| LINTEL | 03/12/2007 | CANCELLED BY APPLICANT | AIRS WEB |
| LINTEL | 03/07/2007 | APPROVED - AS NOTED | JHINDMAN |
| Note: PARTIAL | |||
| LINTEL | 02/28/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: PARTIAL - HILITED AND DATED ON JOB PLANS. | |||
| LINTEL | 02/20/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: THIS IS A REINSPECTION PARTIAL APPROVED - HILITED AND DATED ON JOB PLANS. | |||
| LINTEL | 02/19/2007 | Disapproved -FEE REQUIRED | MMOORE |
| Note: 1. FORMING NOT COMPLETED | |||
| LINTEL | 02/12/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: ELEVEN FOOT HIGH EXTERIOR WALLS (PARTIAL) HILITED AND DATED ON JOB PLANS. | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 01/16/2007 | APPROVED | JHINDMAN |
| Note: | |||
| UNDERGROUND ELECTRICAL | 01/10/2007 | APPROVED | LHITES |
| FIRST ROUGH PLUMBING INSPECTION | 01/08/2007 | APPROVED - AS NOTED | JGIBSON |
| Note: First rough plumbing OK check FIRE MAIN @ SLAB INSPECTION ON SOUTH END BY EXISTING BUILDING. |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 11/26/2007 | 11/27/2007 |
| Note: Released By: FREODICA Rev.- Added HVAC on units 18,19,21,22,27 & 28. | |||
| BLD | HOLD | 11/06/2007 | 11/08/2007 |
| Note: Held By: FREODICA Rev.- Submitted mechanical (HVAC) layout needs more inforamation: 1. Provide supply air duct sizes of both main duct and brach duct. 2. Indicate supply CFM from each diffuser. 3. Show how air is returned to the unit and indicate return air duct size, return grille and CFM. 4. Show how make-up air (ventilation air) is accomplished and indicate duct size and CFM. 5. Thermostat location. 6. Toilet exhaust - provide exhaust duct layout, size, and CFM. 7. Provide equipment schedules for HVAC Units (AHU/CU) and Exhaust Fans. Indicate on plan which unit serves the retail units. 8. Provide support details of AHU and ductwork. 9. Indicate or show how condensate disposal will be accomplished to comply with 2004 FBC/M Section 307. | |||
| BLD | COMPLETE | 07/11/2007 | 07/17/2007 |
| Note: Released By: FREODICA Revision- Deleted the word FUTURE on electrical panels. Electrical will be completed. Released per LW. | |||
| BLD | COMPLETE | 06/06/2007 | 06/07/2007 |
| Note: Released By: CCOTE Approved for Release. REVISION: Roof Tie-In. | |||
| BLD | COMPLETE | 02/19/2007 | 02/20/2007 |
| Note: Released By: CCOTE Approved for Release. REVISION: Change walls from metal to wood, Downspout reconfiguration and change from 4" to 3". | |||
| BLD | COMPLETE | 01/11/2007 | 01/12/2007 |
| Note: Released By: LWOODROME Revision: footing detail at existing sprinkler main BB | |||
| BLD | HOLD | 10/11/2006 | 11/16/2006 |
| Note: Held By: LWOODROME PLAN REVIEW COMMENTS: " Provide signed and sealed engineering design for the 1000 amp electrical system,. Larry Woodrome, CBO Chief Plans Examiner City of Palm Coast 386-986-3786 | |||
| DSD | COMPLETE | 10/09/2006 | 10/11/2006 |
| Note: Released By: DCHAUDOIN | |||
| FI1 | COMPLETE | 10/06/2006 | 10/09/2006 |
| Note: Released By: JPATTEE | |||
| FI1 | COMPLETE | 08/23/2006 | 09/07/2006 |
| Note: Released By: JPATTEE Held By: JPATTEE Electrical legend indicates exit lighting, unable to locate. Electrical legend does not indicate emergency lighting. Provide design criteria for automatic fire sprinkler system per F.A.C.. | |||
| BLD | COMPLETE | 11/20/2006 | |
| Note: Released By: LWOODROME |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | ¤40.00 | 01/25/2008 |
| REINSPECTION FEE | ¤40.00 | 01/25/2008 |
| REINSPECTION FEE | ¤40.00 | 01/15/2008 |
| REVISION | ¤40.00 | 01/15/2008 |
| REVISION | ¤40.00 | 01/15/2008 |
| EARLY POWER INSPECTION | ¤40.00 | 01/15/2008 |
| REINSPECTION FEE | ¤40.00 | 01/15/2008 |
| REVISION | ¤40.00 | 02/20/2007 |
| REINSPECTION FEE | ¤40.00 | 02/20/2007 |
| REVISION | ¤40.00 | 01/17/2007 |
| TRANSPORTATION IMPACT FEE | ¤67,202.65 | 11/21/2006 |
| ADMIN FEE | ¤20.00 | 11/21/2006 |
| BUILDING CODE ADMIN FUND | ¤76.18 | 11/21/2006 |
| ELECTRIC FEE | ¤630.00 | 11/21/2006 |
| FIRE PLANS REVIEW | ¤152.35 | 11/21/2006 |
| MECHANICAL FEE | ¤630.00 | 11/21/2006 |
| PERMIT FEE | ¤7,000.00 | 11/21/2006 |
| PLAN CHECK FEE | ¤1,150.00 | 11/21/2006 |
| PLUMBING FEE | ¤630.00 | 11/21/2006 |
| RADON FEE | ¤76.18 | 11/21/2006 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤77,967.36 |