I want to search for...

Permit #2006080619

Permit Details

Status: COED

Parcel Id: 18-11-31-0000-02010-0070
COMMERCIAL SQUARE FOOTAGE: 15235 sqft
Total Square Footage: 15235 sqft
Block: 02010
Subdivision: -
Job Phone: (386) 445-4350
Location Address: 5 UTILITY DR
Type: CA - COMM ADDITION
Issue Date: 11/21/2006
NOC: RECORDED
Applicant name: MICHAEL GLEN MACHIN
Owner: M MACHIN ENTERPRISES INC

Address

P O BOX 353460

PALM COAST, FL 32135

Lot: 0070
Contracted Stated Job Value: ¤1,000,000.00
Job Description: SHELL ADDITION TO THE WOODLANDS COMMON CENTER (RETAIL)
Type: CN

Contractor

MACHIN CONSTRUCTION CO
Status Location Address State License Number Phone Fax
INACTIVE

3 HARGROVE GRADE SUITE 1

Palm Coast, FL 32137

CGC058789 (Exp: 08/31/2024) (386) 445-4350 (386)446-5459

Sub Contractors

RANDALL E BROWN
Status Location Address State License Number Phone Fax
CANCEL

765 HAWKS RIDGE ROAD

PORT ORANGE, FL 32127

EC13002369 (Exp: 08/31/2014) (386)761-3179 (386)767-5013
DAVID FRANKLIN POWELL
Status Location Address State License Number Phone Fax
INACTIVE

2610 Dobbs Road

St. Augustine, FL 32086

CAC053851 (Exp: 08/31/2026) 904-794-2665 904-794-2329
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
JAMES A. CROSBY III
Status Location Address State License Number Phone Fax
CANCEL

96 HAWKS LANE

FLAGLER BEACH, FL 32136

CCC0582581 (Exp: 08/31/2010) (386)986-1234 (386)439-6439

Inspection History

Type Request Date Result Inspector
FINAL COMPLETE BUILDING INSPECTION 01/28/2008 FINAL APPROVED JLEVRAULT
Note: When the inspector does the building final-- Please check the roof- per Michael Moore CALLED BY CONTRACTOR
FIRE FINAL 01/25/2008 APPROVED JLEWIS
H.V.A.C. FINAL 01/25/2008 APPROVED JLEVRAULT
Note: UNIT NUMBER 28
H.V.A.C. ROUGH 01/18/2008 APPROVED JLEVRAULT
Note: THIS IS A REINSPECTION PLENUM HAS BEEN MOVED.
H.V.A.C. FINAL 01/18/2008 APPROVED JLEVRAULT
Note: UNITS 18, 19, 20, 21, 22, AND 27.
RESIDENTIAL EARLY POWER 01/16/2008 APPROVED - AS NOTED RMARVEL
Note: UNIT #"S 18-22,27,28
H.V.A.C. ROUGH 01/15/2008 Disapproved -FEE REQUIRED JMCGOWEN
Note: need 4 inch clearance between plentums on unit 28
ABOVE CEILING 01/10/2008 PARTIALLY APPROVED JLEVRAULT
Note: Gary from Machin Construction called to schedule this inspection UNITS 18, 19, 20, 21, 22, 27, AND 28,
FIREWALL FINAL INSPECTION 01/10/2008 APPROVED JPATTEE
UTILITY COMMERCIAL FINAL 01/08/2008 APPROVED KKING
UTILITY COMPANY FINAL 01/08/2008 APPROVED MBACON
LANDSCAPE FINAL 12/05/2007 APPROVED WBUTLER
ALL ROUGH 11/28/2007 APPROVED JLEVRAULT
Note: THIS IS A REINSPECTION
ENGINEERING FINAL 11/20/2007 APPROVED DMAY
ALL ROUGH 10/30/2007 Disapproved -FEE REQUIRED JMCGOWEN
Note: NEED TO HAVE 24" BETWEEN RECEPTICALS IN FIREWALLS...... FIRESTOP TOP PLATE OF EXTERIOR WALLS... NEED TO GET REVISIONS TO SHOW ADDED MECHANICAL IN UNITS... NEED TO SHOW ON PLANS HOW MECHANICAL IS SUPPORTED ON BATHROOM WALLS.... O.K. TO SHEETROCK 1 SIDE OF WALLS...
FRAMING 08/02/2007 APPROVED - AS NOTED JLEVRAULT
Note: THIS IS A REINSPECTION CEILING Z CHANNEL.
INSULATION INSPECTION 07/20/2007 APPROVED - AS NOTED JLEVRAULT
Note: ROOF ISO SPRAY ON INSULATION.
RESIDENTIAL EARLY POWER 07/20/2007 APPROVED LHITES
Note: HOUSE PANEL ONLY ALL OTHER METER CANS TO BE CAPED BY FPL
ROOF IN PROGRESS 06/22/2007 APPROVED MMOORE
ROOF IN PROGRESS 06/06/2007 APPROVED MMOORE
LATH /BRICK FLASHING 06/05/2007 APPROVED MMOORE
Note: 1. AREA INSPECTED: DENSGLAS BEHIND ENTRY COLUMNS AND ARCHES AT THE EXTERIOR SOFFIT
LATH /BRICK FLASHING 06/01/2007 APPROVED - AS NOTED JLEVRAULT
Note: GABLE ENDS.
LATH /BRICK FLASHING 05/31/2007 Disapproved - NO FEE JLEVRAULT
Note: INSPECTION CANCELLED BY JOB SUPER.
2ND ROUGH ELECTRICAL 05/29/2007 APPROVED LHITES
Note: front walkway recessed lights are ok
2ND ROUGH ELECTRICAL 05/25/2007 CANCELLED BY APPLICANT AIRS WEB
H.V.A.C. ROUGH 05/25/2007 CANCELLED BY APPLICANT AIRS WEB
ALL ROUGH 05/25/2007 CANCELLED BY APPLICANT AIRS WEB
LATH /BRICK FLASHING 05/15/2007 APPROVED - AS NOTED MMOORE
Note: 1. EXTERIOR DENSGLASS AT 2 CUPOLA ON ROOF
LATH /BRICK FLASHING 05/14/2007 APPROVED MMOORE
Note: Rick called in inspection Partial Inspection for dense glass sofits 1. INSPECTED DENSGLASS AT EAST AND N.WEST SIDES OF BLDG. AT SOFFITS AND FASCIA 2. ARCH FRAMING CHECKED AND IS TAPCONNED 3. SCRATCH, BROWN AND FINISH COATES APPLIED TO EAST AND N. WEST EXTERIOR WALLS...TEXTURE NOT APPLIED 4. ARCHES NOT LATHED
EXTERIOR WALL SHEATHING/SHEAR WALL 05/08/2007 APPROVED MMOORE
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 05/08/2007 APPROVED MMOORE
FRAMING 05/08/2007 Disapproved -FEE REQUIRED MMOORE
Note: 1. ROOF FROM NEW STRUCTURE TO EXISTING BUILDING / NEED FRAMING DETAIL 2. ARCHES AT ENTRY AREA NEED TO BE ATTACHED AT 12" O.C.
LINTEL 03/14/2007 APPROVED JLEVRAULT
LINTEL 03/12/2007 CANCELLED BY APPLICANT AIRS WEB
LINTEL 03/07/2007 APPROVED - AS NOTED JHINDMAN
Note: PARTIAL
LINTEL 02/28/2007 APPROVED - AS NOTED JLEVRAULT
Note: PARTIAL - HILITED AND DATED ON JOB PLANS.
LINTEL 02/20/2007 APPROVED - AS NOTED JLEVRAULT
Note: THIS IS A REINSPECTION PARTIAL APPROVED - HILITED AND DATED ON JOB PLANS.
LINTEL 02/19/2007 Disapproved -FEE REQUIRED MMOORE
Note: 1. FORMING NOT COMPLETED
LINTEL 02/12/2007 APPROVED - AS NOTED JLEVRAULT
Note: ELEVEN FOOT HIGH EXTERIOR WALLS (PARTIAL) HILITED AND DATED ON JOB PLANS.
MONOLITHIC SLAB INSPECTION/SLAB 01/16/2007 APPROVED JHINDMAN
Note:
UNDERGROUND ELECTRICAL 01/10/2007 APPROVED LHITES
FIRST ROUGH PLUMBING INSPECTION 01/08/2007 APPROVED - AS NOTED JGIBSON
Note: First rough plumbing OK check FIRE MAIN @ SLAB INSPECTION ON SOUTH END BY EXISTING BUILDING.

Review History

Department Status Date In Date Out
BLD COMPLETE 11/26/2007 11/27/2007
Note: Released By: FREODICA Rev.- Added HVAC on units 18,19,21,22,27 & 28.
BLD HOLD 11/06/2007 11/08/2007
Note: Held By: FREODICA Rev.- Submitted mechanical (HVAC) layout needs more inforamation: 1. Provide supply air duct sizes of both main duct and brach duct. 2. Indicate supply CFM from each diffuser. 3. Show how air is returned to the unit and indicate return air duct size, return grille and CFM. 4. Show how make-up air (ventilation air) is accomplished and indicate duct size and CFM. 5. Thermostat location. 6. Toilet exhaust - provide exhaust duct layout, size, and CFM. 7. Provide equipment schedules for HVAC Units (AHU/CU) and Exhaust Fans. Indicate on plan which unit serves the retail units. 8. Provide support details of AHU and ductwork. 9. Indicate or show how condensate disposal will be accomplished to comply with 2004 FBC/M Section 307.
BLD COMPLETE 07/11/2007 07/17/2007
Note: Released By: FREODICA Revision- Deleted the word FUTURE on electrical panels. Electrical will be completed. Released per LW.
BLD COMPLETE 06/06/2007 06/07/2007
Note: Released By: CCOTE Approved for Release. REVISION: Roof Tie-In.
BLD COMPLETE 02/19/2007 02/20/2007
Note: Released By: CCOTE Approved for Release. REVISION: Change walls from metal to wood, Downspout reconfiguration and change from 4" to 3".
BLD COMPLETE 01/11/2007 01/12/2007
Note: Released By: LWOODROME Revision: footing detail at existing sprinkler main BB
BLD HOLD 10/11/2006 11/16/2006
Note: Held By: LWOODROME PLAN REVIEW COMMENTS: " Provide signed and sealed engineering design for the 1000 amp electrical system,. Larry Woodrome, CBO Chief Plans Examiner City of Palm Coast 386-986-3786
DSD COMPLETE 10/09/2006 10/11/2006
Note: Released By: DCHAUDOIN
FI1 COMPLETE 10/06/2006 10/09/2006
Note: Released By: JPATTEE
FI1 COMPLETE 08/23/2006 09/07/2006
Note: Released By: JPATTEE Held By: JPATTEE Electrical legend indicates exit lighting, unable to locate. Electrical legend does not indicate emergency lighting. Provide design criteria for automatic fire sprinkler system per F.A.C..
BLD COMPLETE 11/20/2006
Note: Released By: LWOODROME

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
EARLY POWER INSPECTION ¤40.00 01/25/2008
REINSPECTION FEE ¤40.00 01/25/2008
REINSPECTION FEE ¤40.00 01/15/2008
REVISION ¤40.00 01/15/2008
REVISION ¤40.00 01/15/2008
EARLY POWER INSPECTION ¤40.00 01/15/2008
REINSPECTION FEE ¤40.00 01/15/2008
REVISION ¤40.00 02/20/2007
REINSPECTION FEE ¤40.00 02/20/2007
REVISION ¤40.00 01/17/2007
TRANSPORTATION IMPACT FEE ¤67,202.65 11/21/2006
ADMIN FEE ¤20.00 11/21/2006
BUILDING CODE ADMIN FUND ¤76.18 11/21/2006
ELECTRIC FEE ¤630.00 11/21/2006
FIRE PLANS REVIEW ¤152.35 11/21/2006
MECHANICAL FEE ¤630.00 11/21/2006
PERMIT FEE ¤7,000.00 11/21/2006
PLAN CHECK FEE ¤1,150.00 11/21/2006
PLUMBING FEE ¤630.00 11/21/2006
RADON FEE ¤76.18 11/21/2006
Fees Total Due: ¤0.00 Total Paid: ¤77,967.36