Permit #2006090451
Permit Details
Status: COED
| Parcel Id: 07-11-31-7032-00890-0140 |
| CONDITIONED SPACE: 2552 sqft |
| GARAGE: 547 sqft |
| OPENED PORCH (WITH ROOF) : 349 sqft |
| OPENED PORCH (WITH ROOF) : 45 sqft |
| Total Square Footage: 3493 sqft |
| Block: 00890 |
| Subdivision: - |
| Job Phone: (386)851-7940 |
| Location Address: 90 ROBINSON DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/10/2006 |
| NOC: RECORDED |
| Applicant name: LISA MARIE STEINER |
| Owner: MERCEDES HOMES, INC |
|
Address 775 HARLEY STRICKLAND BLVD ORANGE CITY, FL 32763 |
|
Address # 110 ORANGE CITY, FL 32763 |
| Lot: 0140 |
| Contracted Stated Job Value: ¤295,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MERCEDES HOMES INC.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
12001 SCIENCE DRIVE #160 ORLANDO, FL 32826 |
CGC1510145 (Exp: 08/31/2012) | (407)272-5591 | (407)282-1563 |
Sub Contractors
STEVEN JAY SMITH
| Status | Location Address | State License Number | Phone |
| INACTIVE |
104 West Cedar Avenue Orange City, FL 32763 |
EC0001542 (Exp: 08/31/2022) | (386)775-7776 |
EDDIE T PALMATEER
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
2985 ENTERPRISE ROAD DEBARY, FL 32713 |
SUITE A DEBARY, FL 32713 |
CAC1813533 (Exp: 08/31/2024) | (386)668-8651 | (386)668-7758 |
KATRINA ELAINE RIEF-D'ERRICO
| Status | Location Address | State License Number | Phone |
| CANCEL |
157 BOULDER ROCK DR Palm Coast, FL 32137 |
CFC1425676 (Exp: 09/30/2008) | (386)437-4250 |
LISA MARIE STEINER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
12001 SCIENCE DRIVE #160 ORLANDO, FL 32826 |
CGC1510145 (Exp: 08/31/2012) | (407)272-5591 | (407)282-1563 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 02/07/2007 | FINAL APPROVED | ACOOPER |
| Note: | |||
| STORMWATER FINAL INSPECTION | 02/02/2007 | APPROVED | GLALIMA |
| UTILITY COMPANY FINAL | 01/23/2007 | APPROVED | MBACON |
| RESIDENTIAL EARLY POWER | 01/17/2007 | APPROVED | JHINDMAN |
| Note: CONTRACTOR CALLED TO SCHEDULE AN EARLY POWER INSPECTION FOR 1/17/07 | |||
| DRIVEWAY | 01/04/2007 | APPROVED - AS NOTED | GLALIMA |
| Note: THIS IS A REINSPECTION 1 / 5 / 07 CLEAN OUT AROUND CULVERT ENDS 6 '' DOWN AND UNDER . | |||
| DRIVEWAY | 01/03/2007 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: NOT FORMED AT ALL . | |||
| LATH /BRICK FLASHING | 12/14/2006 | APPROVED | CMINI |
| INSULATION INSPECTION | 12/13/2006 | APPROVED | JHINDMAN |
| Note: | |||
| ALL ROUGH | 12/11/2006 | APPROVED - AS NOTED | ACOOPER |
| Note: Tapcon the front window frame to CMU, install approved straps on electrical wires on the CMU wall, seal any unused holes in electrical boxes and check nailing on attic wiring and fasten every 4.5 ft. | |||
| ALL ROUGH | 12/07/2006 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: NEED BOND JUMPER BETWEEN GROUND BARS, NO MORE THAN 2 CONDUCTORS IN ROMEX CLAMP (PANEL), MULIAN ON WINDOWS NEED TO BE TAPCON AND NOT BENT, OR SHOW DETAIL THAT BENDING AND SCREWED TO 1X4 IS APPROVED, TREY CEILING IN MASTER NEEDS TO BE FIREBLOCKED TO BLOCK WALL, MISSING NAIL PLATE AT LIVING SLIDER, BLOCK WALL BOX NEAR SLIDER IS OVER BOX FILL, NEED APPROVED STRAPS FOR ALL BLOCK WALL WIRES, SEAL UNUSED OPENINGS IN ALL BOXES, SECURE WIRES IN ATTIC EVERY 41/2' | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 11/22/2006 | APPROVED - AS NOTED | ACOOPER |
| Note: G71S missing engineering on front of truss, strap jack J-7. | |||
| LINTEL | 11/13/2006 | APPROVED | CMINI |
| FOUNDATION SURVEY APPROVED BY STORMWATER | 11/09/2006 | APPROVED | LAPTEKAR |
| MONOLITHIC SLAB INSPECTION/SLAB | 11/03/2006 | APPROVED | JHINDMAN |
| Note: | |||
| FIRST ROUGH PLUMBING INSPECTION | 11/02/2006 | APPROVED | JHINDMAN |
| Note: |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 10/04/2006 | 10/05/2006 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Auba. | |||
| SW1 | COMPLETE | 09/21/2006 | 09/26/2006 |
| Note: Released By: LAPTEKAR | |||
| ZON | COMPLETE | 09/21/2006 | 10/04/2006 |
| Note: Released By: ECOYNE |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | ¤40.00 | 02/08/2007 |
| REINSPECTION FEE | ¤40.00 | 02/08/2007 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 02/08/2007 |
| TRANS IMPACT FEE 4 - PER UNIT | ¤3,248.51 | 10/10/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 10/10/2006 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/10/2006 |
| ADMIN FEE | ¤20.00 | 10/10/2006 |
| ARC HOUSE REVIEW | ¤125.00 | 10/10/2006 |
| BUILDING CODE ADMIN FUND | ¤17.47 | 10/10/2006 |
| ELECTRIC FEE | ¤207.00 | 10/10/2006 |
| FIRE IMPACT FEE 4-1-06 | ¤179.37 | 10/10/2006 |
| MECHANICAL FEE | ¤207.00 | 10/10/2006 |
| PERMIT FEE | ¤1,150.50 | 10/10/2006 |
| PARKS IMPACT FEE 4/1/06 | ¤1,159.02 | 10/10/2006 |
| PLAN CHECK FEE | ¤118.00 | 10/10/2006 |
| PLUMBING FEE | ¤207.00 | 10/10/2006 |
| RADON FEE | ¤17.47 | 10/10/2006 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,451.34 |