I want to search for...
Permit #2006090454
Permit Details
Status: COED
| Parcel Id: 07-11-31-7025-00320-0080 |
| CONDITIONED SPACE: 3125 sqft |
| GARAGE: 414 sqft |
| OPENED PORCH (WITH ROOF) : 328 sqft |
| OPENED PORCH (WITH ROOF) : 45 sqft |
| Total Square Footage: 3912 sqft |
| Block: 00320 |
| Subdivision: 1228 - SOUTHWEST QUADRANT |
| Job Phone: (386)851-7940 |
| Location Address: 33 PEPPERCORN LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/06/2006 |
| NOC: RECORDED |
| Applicant name: LISA MARIE STEINER |
| Owner: MERCEDES HOMES INC |
|
Address 775 HARLEY STRICKLAND BLVD STE 110 ORANGE, FL 32763 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤327,000.00 |
| Job Description: SINGLE FAMILY |
| Type: CN |
Contractor
MERCEDES HOMES INC.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
12001 SCIENCE DRIVE #160 ORLANDO, FL 32826 |
CGC1510145 (Exp: 08/31/2012) | (407)272-5591 | (407)282-1563 |
Sub Contractors
STEVEN JAY SMITH
| Status | Location Address | State License Number | Phone |
| INACTIVE |
104 West Cedar Avenue Orange City, FL 32763 |
EC0001542 (Exp: 08/31/2022) | (386)775-7776 |
EDDIE T PALMATEER
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
2985 ENTERPRISE ROAD DEBARY, FL 32713 |
SUITE A DEBARY, FL 32713 |
CAC1813533 (Exp: 08/31/2024) | (386)668-8651 | (386)668-7758 |
KATRINA ELAINE RIEF-D'ERRICO
| Status | Location Address | State License Number | Phone |
| CANCEL |
157 BOULDER ROCK DR Palm Coast, FL 32137 |
CFC1425676 (Exp: 09/30/2008) | (386)437-4250 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 02/23/2007 | FINAL APPROVED | JHINDMAN |
| Note: | |||
| STORMWATER FINAL INSPECTION | 02/21/2007 | APPROVED | GLALIMA |
| Note: 0 road damage | |||
| UTILITY COMPANY FINAL | 02/08/2007 | APPROVED | MBACON |
| RESIDENTIAL EARLY POWER | 02/07/2007 | APPROVED | LHITES |
| Note: THIS IS A REINSPECTION | |||
| RESIDENTIAL EARLY POWER | 02/05/2007 | CANCELLED BY APPLICANT | RMARVEL |
| Note: called fpl at 3:30. RM | |||
| DRIVEWAY | 01/23/2007 | APPROVED | DRANDALL |
| LATH /BRICK FLASHING | 12/28/2006 | APPROVED | JHINDMAN |
| LATH /BRICK FLASHING | 12/27/2006 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: THIS IS A REINSPECTION improper laps on wire mesh | |||
| LATH /BRICK FLASHING | 12/22/2006 | Disapproved -FEE REQUIRED | CMINI |
| Note: LATH NOT READY FOR INSPECTION. | |||
| INSULATION INSPECTION | 12/22/2006 | APPROVED | CMINI |
| INSULATION INSPECTION | 12/21/2006 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: need fire blocking in master bedroom. | |||
| ALL ROUGH | 12/19/2006 | APPROVED | ACOOPER |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 12/18/2006 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: THIS IS A REINSPECTION need test on drain waste and vent | |||
| ALL ROUGH | 12/15/2006 | Disapproved -FEE REQUIRED | PGALLMANN |
| Note: 1) NO WATER TEST ON SECOND FLOOR WASTE & VENTS. 2) DRYER VENT IS BACK-PITCHED. | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 11/30/2006 | APPROVED | JHINDMAN |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 11/30/2006 | APPROVED | ACOOPER |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 11/29/2006 | Disapproved -FEE REQUIRED | ACOOPER |
| Note: All OSB laid verticaly on the roof must be blocked on the bottom, block at all step down trusses, Point 203 on truss layout should be SYP, truss H151SP4S & H171SP4S are missing engineering. Also noted separately is the fact that the exterior insulation has a 1x2 on top of it at the top plate. This is not proper firestopping and will be checked on next inspection along with missing header over step area going upstairs. | |||
| LINTEL | 11/13/2006 | APPROVED | DROCKWELL |
| FOUNDATION SURVEY APPROVED BY STORMWATER | 11/09/2006 | APPROVED - AS NOTED | LAPTEKAR |
| Note: Advised that a new lot grading plan will be required as the FFE changed. | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 11/03/2006 | APPROVED | CMINI |
| FIRST ROUGH PLUMBING INSPECTION | 11/02/2006 | APPROVED | ACOOPER |
| FIRST ROUGH PLUMBING INSPECTION | 11/01/2006 | Disapproved -FEE REQUIRED | ACOOPER |
| Note: No head pressure. |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 09/28/2006 | 09/29/2006 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Auba. | |||
| SW1 | COMPLETE | 09/21/2006 | 09/22/2006 |
| Note: Released By: LAPTEKAR Proposed culvert inverts maybe too high. | |||
| ZON | COMPLETE | 09/21/2006 | 09/28/2006 |
| Note: Released By: ECOYNE |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | (¤40.00) | 02/26/2007 |
| EARLY POWER INSPECTION | ¤40.00 | 02/26/2007 |
| EARLY POWER INSPECTION | (¤40.00) | 02/26/2007 |
| EARLY POWER INSPECTION | (¤40.00) | 02/26/2007 |
| EARLY POWER INSPECTION | (¤40.00) | 02/26/2007 |
| EARLY POWER INSPECTION | (¤40.00) | 02/26/2007 |
| EARLY POWER INSPECTION | ¤40.00 | 02/26/2007 |
| EARLY POWER INSPECTION | ¤40.00 | 02/26/2007 |
| EARLY POWER INSPECTION | ¤40.00 | 02/26/2007 |
| EARLY POWER INSPECTION | ¤40.00 | 02/26/2007 |
| EARLY POWER INSPECTION | ¤40.00 | 02/26/2007 |
| REINSPECTION FEE | ¤40.00 | 02/26/2007 |
| REINSPECTION FEE | ¤40.00 | 02/26/2007 |
| REINSPECTION FEE | ¤40.00 | 02/26/2007 |
| REINSPECTION FEE | ¤40.00 | 02/26/2007 |
| REINSPECTION FEE | ¤40.00 | 02/26/2007 |
| REINSPECTION FEE | ¤40.00 | 02/26/2007 |
| REINSPECTION FEE | ¤40.00 | 02/26/2007 |
| REINSPECTION FEE | (¤40.00) | 02/26/2007 |
| REINSPECTION FEE | ¤40.00 | 02/26/2007 |
| REINSPECTION FEE | (¤40.00) | 02/26/2007 |
| REINSPECTION FEE | ¤40.00 | 02/26/2007 |
| REINSPECTION FEE | (¤40.00) | 02/26/2007 |
| REINSPECTION FEE | ¤40.00 | 02/26/2007 |
| REINSPECTION FEE | (¤40.00) | 02/26/2007 |
| REINSPECTION FEE | ¤40.00 | 02/26/2007 |
| REINSPECTION FEE | (¤40.00) | 02/26/2007 |
| REINSPECTION FEE | ¤40.00 | 02/26/2007 |
| REINSPECTION FEE | (¤40.00) | 02/26/2007 |
| REINSPECTION FEE | ¤40.00 | 02/26/2007 |
| REINSPECTION FEE | (¤40.00) | 02/26/2007 |
| REINSPECTION FEE | ¤40.00 | 02/26/2007 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 10/06/2006 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/06/2006 |
| TRANS IMPACT FEE 4 - PER UNIT | ¤3,248.51 | 10/06/2006 |
| FIRE IMPACT FEE 4-1-06 | ¤179.37 | 10/06/2006 |
| MECHANICAL FEE | ¤226.20 | 10/06/2006 |
| PERMIT FEE | ¤1,275.30 | 10/06/2006 |
| PARKS IMPACT FEE 4/1/06 | ¤1,159.02 | 10/06/2006 |
| PLAN CHECK FEE | ¤130.80 | 10/06/2006 |
| PLUMBING FEE | ¤226.20 | 10/06/2006 |
| RADON FEE | ¤19.56 | 10/06/2006 |
| ADMIN FEE | ¤20.00 | 10/06/2006 |
| ARC HOUSE REVIEW | ¤125.00 | 10/06/2006 |
| BUILDING CODE ADMIN FUND | ¤19.56 | 10/06/2006 |
| ELECTRIC FEE | ¤226.20 | 10/06/2006 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,855.72 |