Permit #2006110486
Permit Details
Status: COED
| Parcel Id: 14-11-30-5538-00000-0080 |
| COMMERCIAL SQUARE FOOTAGE: 108787 sqft |
| Total Square Footage: 108787 sqft |
| Block: 00000 |
| Subdivision: 0 - |
| Job Phone: (386) 445-7945 |
| Location Address: 515 PALM COAST PKWY SW |
| Type: BC - BUILDING COMMERCIAL |
| Issue Date: 02/02/2007 |
| NOC: RECORDED |
| Applicant name: RYSZARD A SKLADZIEN |
| Owner: DELUCIA JOSEPH L TRUSTEE & JOSEPH DELUCIA JR & MIC |
|
Address 650 A HERITAGE HILLS SOMERS, NY 10589 |
|
Address DELUCIA & DAVID DELUCIA SOMERS, NY 10589 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤7,000,000.00 |
| Job Description: ROMA COURT COMMERICAL 36 UNIT |
| Type: CN |
Contractor
RYSKCON CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2 Market Place Unit D Palm Coast, FL 32137 |
CGC037470 (Exp: 08/31/2014) | (386) 445-7945 | (386)446-3871 |
Sub Contractors
JOHN PHILLIPS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
235 S.R. 207 #2-B ST. AUGUSTINE, FL 32080 |
CMC048017 (Exp: 08/30/2008) | (904)823-1223 | (904)823-1424 |
RYSZARD ALOJZY SKLADZIEN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2 MARKET PLACE UNIT D PALM COAST, FL 32137 |
CCC057546 (Exp: 08/31/2016) | (386)445-7945 | (386)446-3871 |
PAUL NOEL BIELEFELDT
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
320 Aragon Street Holly Hill, FL 32117 |
EC0001646 (Exp: 08/31/2026) | (386) 677-0447 | 386-673-9868 |
GARY WAYNE EVERS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 740106 ORANGE CITY, FL 32763 |
CFC050566 (Exp: 08/31/2026) | 386-775-0909 | 386-775-0918 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 10/28/2008 | FINAL APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION ok per Larry revision was approved | |||
| FINAL COMPLETE BUILDING INSPECTION | 10/23/2008 | Disapproved - NO FEE | JHINDMAN |
| Note: Inspection offered by Mr. Abreau to meet Ms. Weeks at the site at 1:00 pm for a complete building inspection and to discuss any deficiencies. Mr. McGowen and I met with Ms Weeks and determined the following items need to be corrected. 1. all sump covers and plates in the garage floor are to be leveled with floor. 2. all penetrations in the floor/ceiling must be fire sealed. 3. unused EMT and MC cable at north garage entry need straps and EMT needs proper termination. 4. A/c units in elevator equipment rooms must be removed from the 2 hour rated wall and the wall needs to be closed up. 5. The 2 hour rated walls for the electrical and meter rooms have penetrations that must be properly sealed. 6. The stairs and restroom doors are missing signage. 7. Holes in exterior ceilings must be repaired. 8. fire caulk all conduits that penetrate rated walls in all units. 9. Fix broken tiles in walkways. 10. Unit 17 fix EMT that has come loose from its strap. The stairways have been checked and were determined to be within construction tolerances. The thresholds to the unoccupied units will be corrected by the interior alteration contractor. Jerry Hindman | |||
| FINAL COMPLETE BUILDING INSPECTION | 10/21/2008 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: THIS IS A REINSPECTION requested by contractor Inspection Resulted at 10/21/2008 3:27:49 PM NEED COMPLETE SET OF APPROVED PLANS WITH ALL REVISIONS ON SITE FOR FULL INSPECTION, IN PARKING LEVEL 1, ALL SUMP COVERS AND OTHER STEEL PLATES IN THE GROUND MUST BE LEVELED TO THE FLOOR OR MEET FBC ADA 11-4.5.2, ALL PENETRATIONS THRU THE FLOOR/CEILING MUST BE PROPERLY FIRE SEALED, FINISH AND SEAL OFF UNUSED EMT AT NORTH GARAGE ENTRY CEILING, MC CABLE NEEDS STRAP AT GARAGE ENTRY,CANNOT HAVE PORTABLE A/C UNITS IN THE ELEVATOR EQUIPMENT ROOMS THAT ARE 2 HOUR RATED, ELECTRICAL AND WATER METER ROOMS IN PARKING GARAGE ARE 2 HOUR RATED AND HAVE AREAS OF CMU``S MISSING, NEED REVISION WITH ENGINEERS DESIGNED REPAIR, REPAIR HOLES IN EXTERIOR CEILINGS, STAIR DOORS AND PUBLIC RESTROOM DOORS ARE NOT LABELED KIDNEY CENTERS WATER HAS BAD SULFER SMELL, WAS TOLD THAT WATER HEATER NEEDS TO BE DRAINED, LABEL ELECTRICAL BREAKERS IN PANELS ALL UNITS, ALL UNITS NEED OPEN CONDUITS THAT PENETRATE PATRY WALLS TO BE FIRE CAULKED, ENTRY THRESHOLDS TO UNITS EXCEED 1/2" PER FBC ADA 11-4.13.8. UNIT 17 STRAP LOOSE EMT ON CEILING, FIX BOKEN TILES IN WALKWAY THAT ARE A TRIPPING HAZARD, UPSTAIRS PUBLIC RESTROOMS OUTER UNITS DO NOT HAVE CLEAR MANUVERING SPACE NEED REVISED PLANS THAT SHOW THAT THESE ARE NOT THE ACCESSIBLE RESTROOMS.EXTERIOR STAIRWAYS LEADING TO THE 2ND FLOOR HAVE RISERS OF MORE THAN 7" PER FBC 1009.3. INCOMPLETE INSPECTION. | |||
| FINAL COMPLETE BUILDING INSPECTION | 10/20/2008 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: Inspection Resulted at 10/20/2008 3:28:17 PM NO PLANS ON SITE. HANDRAILING IS NOT COMPLETE. INCOMPLETE INSPECTION | |||
| UTILITY COMMERCIAL FINAL | 10/20/2008 | APPROVED | KKING |
| Note: THIS IS A REINSPECTION | |||
| FIRE FINAL | 10/17/2008 | APPROVED | JLEWIS |
| ELEVATOR CERTIFICATION INSPECTION | 10/17/2008 | APPROVED | LWOODROME |
| Note: approved per Larry Woodrone | |||
| LANDSCAPE FINAL | 10/14/2008 | APPROVED | WBUTLER |
| Note: THIS IS A REINSPECTION | |||
| LANDSCAPE FINAL | 10/10/2008 | PARTIALLY APPROVED | WBUTLER |
| Note: THIS IS A REINSPECTION CALLED BY CONTRACTOR | |||
| ENGINEERING FINAL | 10/09/2008 | APPROVED | CCZUPRYNA |
| LANDSCAPE FINAL | 10/06/2008 | PARTIALLY APPROVED | WBUTLER |
| Note: A few punchlist items for landscaping need to be completed. The irrigation as-built drawing was not correct and requires modification per the red lined plan given to the contractor by Bill Butler at the time of inspection on 10/6/08. | |||
| UTILITY COMPANY FINAL | 09/16/2008 | APPROVED | KKING |
| Note: Richard from Ryscon called to schedule this inspection | |||
| TRAFFIC ENGINEER | 09/16/2008 | APPROVED | CCZUPRYNA |
| Note: Richard from Ryscon called to schedule this inspection | |||
| UTILITY COMMERCIAL FINAL | 09/16/2008 | Disapproved - NO FEE | KKING |
| Note: Richard from Ryscon called to schedule this inspection All condiitions of the Utility Developers agreement have not been met. Keith King | |||
| FINAL - PARTIAL | 09/15/2008 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: Inspection Resulted at 9/15/2008 3:09:22 PM CANNOT CALL A PARTIAL FINAL. | |||
| H.V.A.C. ROUGH | 09/05/2008 | APPROVED | JMCGOWEN |
| Note: THIS IS A REINSPECTION | |||
| H.V.A.C. FINAL | 09/05/2008 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: Inspection Resulted at 9/5/2008 3:28:01 PM NOT READY.. | |||
| PROJECT STATUS INSPECTION | 08/26/2008 | Disapproved - NO FEE | CMINI |
| Note: THIS INSPECTION IS FOR WATER ISSUSES COMING INTO BUILDING UNITS.INSPECTION IS DUE TO A COMPLAINT THAT WAS CALLED INTO THE CIT OF PALM COAST...NEED TO CALL IN A STATUS INPECTION WHEN DRYWALL REPAIR IS MADE,WINDOWS ARE SEALED AND IF ROOF IS NEEDED TO BE REPAIRED. | |||
| FIREWALL FINAL INSPECTION | 08/14/2008 | APPROVED | JLEWIS |
| PLUMBING FINAL | 07/28/2008 | FINAL APPROVED | PGALLMANN |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING FINAL | 07/24/2008 | CANCELLED BY APPLICANT | PGALLMANN |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING FINAL | 07/22/2008 | CANCELLED BY APPLICANT | PGALLMANN |
| H.V.A.C. ROUGH | 07/22/2008 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: THIS IS A REINSPECTION NEED REVISION SHOWING ALL BUT 1 AND 19 BATHROOM A/C DUCT.......2 ...2ND FL..STRAP EXHAUST AT ROOF PENETRATION .....3 2ND FL. EXHAUST DUCT LOCATION AND DESION NOT TO PLAN....3 ALL 1ST FL. CONDISATE DRAIN WALL PENETRATION NEEDS 12 INCHES OF COPPER PIPE EXTENDING EACH SIDE OF WALL PER PLAN... | |||
| ELECTRICAL FINAL | 07/22/2008 | APPROVED | LHITES |
| MONOLITHIC SLAB INSPECTION/SLAB | 06/30/2008 | APPROVED | MMOORE |
| Note: COURTYARD ENTRY STAIRS FROM FOUNTAIN RAMPWAY TO 1ST FLOOR ON NORTH AND SOUTH SIDES | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 06/27/2008 | APPROVED | MMOORE |
| Note: REFORMING OF STAIRS: RIGHT STAIRS IN COURTYARD FROM MAIN LEVEL TO 2ND FLOOR, NORTHWEST END OF BUILDING, STAIRS FROM 1ST TO 2ND FLOOR | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 06/11/2008 | APPROVED | MMOORE |
| Note: THIS IS A REINSPECTION STAIRS BEING POURED OVER EXISTING STAIRS FROM THE FIRST FLOOR TO THE BASEMENT ( UNDER GROUND PARKING / GARAGE ), THE PURPOSE OF THIS POUR IS TO CORRECT THE RISE AND RUN OF THE FIRST SET OF STAIRS | |||
| FIREWALL INSPECTION 3ND ROUGH | 06/10/2008 | APPROVED | JPATTEE |
| SECOND ROUGH PLUMBING INSPECTION | 06/06/2008 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS IS A REINSPECTION ALL SECOND ROUGH COMPLETED ON ALL UNITS | |||
| SECOND ROUGH PLUMBING INSPECTION | 06/05/2008 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: THIS IS A REINSPECTION DAYLIGHT IS STILL VISIBLE IN MANY AREAS , WALKED WITH SUPER AND WAS NOTIFYIED........MARK 931-2912 | |||
| INSULATION INSPECTION | 05/30/2008 | APPROVED | MMOORE |
| Note: 2ND FLOOR EXTERIOR WALLS INCLUDING WALK-WAY WALLS | |||
| FIREWALL INSPECTION | 05/29/2008 | CANCELLED BY APPLICANT | JPATTEE |
| FIREWALL INSPECTION | 05/27/2008 | APPROVED - AS NOTED | JPATTEE |
| Note: 2nd floor firewalls | |||
| INSULATION INSPECTION | 05/23/2008 | APPROVED | MMOORE |
| Note: ALL EXTERIOR WALLS IN ALL ROOMS / 1ST FLOOR ONLY | |||
| FIREWALL INSPECTION | 05/19/2008 | APPROVED - AS NOTED | JPATTEE |
| Note: THIS IS A REINSPECTION Outside walls | |||
| SECOND ROUGH PLUMBING INSPECTION | 05/19/2008 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: THIS IS A REINSPECTION ALL PENITRATIONS FOR WATER PIPES AND SANITARY NOT FILLED PER HILTI SPECS.........MARK 931-2912 | |||
| SECOND ROUGH PLUMBING INSPECTION | 05/14/2008 | PARTIALLY APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION ALL OF SECOND ROUGH PLUMBING COMPLETED EXCEPT FOR PATCHING HOLES IN WHERE CORE DRILLING MISSED DESIGNATED AREA..........MARK | |||
| FIREWALL INSPECTION | 05/07/2008 | Disapproved - NO FEE | JPATTEE |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 04/25/2008 | Disapproved - NO FEE | JLEVRAULT |
| Note: Richard came in to the office yesterday and I had him meet with Larry Woodrolhm regarding the stair problem at 515 Palm Coast Parkway. I informed Richard several months ago that his stairs were not built to plan or code. I informed him that a revision was required to be approved by the plans dept.. He never submitted a revision for approval and he proceeded to repair the stairs without the revised detail. I was at the project yesterday to tell Richard yet again that a revision was required to correct the stairs. I informed him of this again in front of Larry and Richard said that he has a revised repair from the engineer but he never submitted it. | |||
| SECOND ROUGH PLUMBING INSPECTION | 04/24/2008 | PARTIALLY APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION ALL UNITS ON FIRST AND SECOND FLOOR INCLUDING BREEZE WAY UNITS ARE APPROVED FOR SECOND ROUGH PLUMBING INSPECTION NONE OF THE NORTH SIDE UNITS HAVE BEEN INSPECTED EXCEPT FOR PRESSURE ON SANITARY AND WATER MAINS.........MARK | |||
| FIREWALL INSPECTION | 04/24/2008 | Disapproved -FEE REQUIRED | JPATTEE |
| Note: THIS IS A REINSPECTION | |||
| SECOND ROUGH PLUMBING INSPECTION | 04/23/2008 | PARTIALLY APPROVED | JGIBSON |
| Note: Requested by ucontractor FIRST FLOOR ALL APPROVED WITH THE EXCEPTION OF UNIT ``13`` AND 31 SECOND FLOOR IS APPROVED ON SOUTH SIDE WITH EXCEPTION OF PUBLIC REST ROOMS NO FIRE CAULKING OR WRAP AROUND WATER CLOSET VERTICAL STUB UP MIDDLE UNITS ARE OK WITH THE EXCEPTION OF ROOF TOP HOSE BIBS NEED ISOLATION TAPE OR MEANS OF PROTECTION OF DISIMALAR MATERIALS...........MARK | |||
| H.V.A.C. ROUGH | 04/23/2008 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: THIS IS A REINSPECTION called by contractor BAR JOISTS DRILLED TO ANCHOR DUCT STRAPS - PROVIDE ENGINEERS REPORT ON STRUCTURAL INTEGRITY OF BAR JOISTS AND PROVIDE METHOD FOR SUPPORTING SAME. PROVIDE DETAIL FOR DUCT MATERIALS INSTALLED. CHECK ALL STRAPPING - PROVIDE STRAP AT END OF DUCT RUNS. RUN MAKEUP AIR DUCT LEVEL OR PITCH UP. MISSING CORNER STRAPS IN UNITS 8, 11, AND 12. BATH SUPPLY DUCT PINCHED IN UNIT NUMBER 9. | |||
| SECOND ROUGH PLUMBING INSPECTION | 04/22/2008 | PARTIALLY APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION WASTE AND WATER LINES OK, NEED RISER CLAMPS ON ALL WASTE LINES 3'' AND 2'' VERTICAL PER CODE SOUTH SIDE FIRST FLOOR ONLY.......MARK | |||
| FIREWALL INSPECTION | 04/22/2008 | Disapproved -FEE REQUIRED | JPATTEE |
| Note: THIS IS A REINSPECTION No one on site did not know what to inspect. | |||
| 2ND ROUGH ELECTRICAL | 04/18/2008 | APPROVED | LHITES |
| Note: THIS INSPECTION WAS FOR THE SERVICE PENETRATIONS BETWEEN BASEMENT AND 1ST FLOOR. THE ELECTRICIAN HAS THEM ALL FIRE CAULKED. OK TO SHEETROCK | |||
| SECOND ROUGH PLUMBING INSPECTION | 04/11/2008 | CANCELLED BY APPLICANT | PGALLMANN |
| Note: THIS IS A REINSPECTION | |||
| SECOND ROUGH PLUMBING INSPECTION | 04/03/2008 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: THIS IS A REINSPECTION NOT READY MISSING SHOCK ARRESTORS AND RISER SHUT OFFS PER PLAN, LEAKS ON SANITARY, INCOMPLETE LIST......... MARK 931-2912 | |||
| FIREWALL INSPECTION | 03/28/2008 | Disapproved - NO FEE | JPATTEE |
| Note: THIS IS A REINSPECTION | |||
| SECOND ROUGH PLUMBING INSPECTION | 03/26/2008 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: THIS IS A REINSPECTION PLANS DO NOT MATCH JOB ON SECOND FLOOR, BATHROOMS HAVE BEEN ADDED AND FLOOR DRAINS NOT INSTALLED, CONDENSATE DRAINS ARE NOT SEPERATED BY AIR BREAK, ISOLATION VALVES @ RISERS PER PLAN, REMOVE ALL DRYWALL AND INSULATION ON HOUSE WATER LINES IN FIRE WALL FOR INSPECTION, DRINKING FOUNTAIN NOT ROUGH IN PER CODE, FIRE COLLARS NEEDED OR MEANS OF FIRE PROTECTION PASSING THRU GARAGE BASEMENT AND BETWEEN FLOORS, ROOF DRAINS NOT TESTED NOR ARE CONDENSATE DRAIN LINES MISSING SHOCK ARRESTORS PER PLANS, ALL ON SOUTH SIDE OF BUILDING, ALL REVISIONS MUST BE STAMPED AND SEALED AND SUBMITTED TO PLAN REVEIW BEFORE INSPECTION. INCOMPLETE LIST...MARK 931-2912 | |||
| COMMERCIAL POWER INSPECTION | 03/11/2008 | APPROVED | LHITES |
| 2ND ROUGH ELECTRICAL | 03/10/2008 | APPROVED | LHITES |
| Note: THIS IS A REINSPECTION THIS WAS AN COMMERCIAL POWER INSPECTION FOR THE HOUSE PANELS | |||
| FIRST ROUGH PLUMBING INSPECTION | 03/05/2008 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: NO STAMPED PLANS INCOMPLETE INSPECTION.........MARK 931-2912 | |||
| SECOND ROUGH PLUMBING INSPECTION | 03/05/2008 | Disapproved - NO FEE | JGIBSON |
| Note: NO STAMPED PLANS | |||
| H.V.A.C. ROUGH | 02/27/2008 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: NEED APPROVED PLANS ON SITE. | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 02/22/2008 | APPROVED - AS NOTED | DROCKWELL |
| Note: STAIRWAY FORMED FOR POUR AT N.W CORNER TO PARKING LOT. | |||
| SECOND FLOOR SLAB INSPECTION | 02/22/2008 | APPROVED - AS NOTED | DROCKWELL |
| Note: ELEVATIONS APPROVED BY CITY PROVIDED AS REQUESTED. | |||
| 2ND ROUGH ELECTRICAL | 02/18/2008 | Disapproved -FEE REQUIRED | LHITES |
| Note: STILL NEED CITY APPROVED REVISIONS AT JOB SITE REVISIONS FOR THE HEIGHT OF ALARM BOXES AND DELETION OF EM LITES AND FIRE WALLS | |||
| FIREWALL INSPECTION | 02/07/2008 | PARTIALLY APPROVED | JPATTEE |
| Note: Replace broken sheets in 2 units | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 01/30/2008 | PARTIALLY APPROVED | JLEVRAULT |
| Note: SECOND FLOOR INTERIOR COURTYARD ELEVATIONS. REVISION OF INTERIOR COURTYARD ELEVATION MUST BE SUBMITTED BEFORE ANOTHER SHEATHING INSPECTION. HAVE BEEN WAITING FOR SAME NOW FOR A WEEK AND A HALF. | |||
| 2ND ROUGH ELECTRICAL | 01/25/2008 | APPROVED - AS NOTED | LHITES |
| Note: NEED REVISION FOR CHANGE IN HEIGHT OF EMERGENCY LIGHTS. THEY ARE NOW AT 90" ELECTRIC PLAN SHOWS 96" NOTE: NEED REVISION ON SITE FOR DELETION OF FIRE WALLS BETWEEN UNITS 27,28 AND 29,30 | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 01/18/2008 | APPROVED - AS NOTED | JLEVRAULT |
| Note: FIRST FLOOR NORTH ELEVATION IN COURTYARD AND SAME CEILING. REVISION ON PLANS TO FOLLOW FOR INTERIOR COURTYARD ELEVATIONS. | |||
| FRAMING | 01/18/2008 | APPROVED - AS NOTED | JLEVRAULT |
| Note: SECOND FLOOR TENANT SEPARATION WALLS. | |||
| INSULATION INSPECTION | 01/15/2008 | APPROVED | JHINDMAN |
| Note: ROOF INSULATION | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 01/14/2008 | PARTIALLY APPROVED | JLEVRAULT |
| Note: FIRST FLOOR INTERIOR ELEVATION WALL SHEATHING AND CEILING DENSGLAS. SOUTH AND EAST ELEVATIONS. | |||
| 2ND ROUGH ELECTRICAL | 01/14/2008 | PARTIALLY APPROVED | RMARVEL |
| Note: FIRE WALLS ONLY. | |||
| SECOND FLOOR SLAB INSPECTION | 01/09/2008 | APPROVED - AS NOTED | JLEVRAULT |
| Note: LOADING RAMP, COLUMNS, AND STAIRS AT NORTH ELEVATION. | |||
| INSULATION INSPECTION | 01/08/2008 | PARTIALLY APPROVED | JLEVRAULT |
| Note: NORTHEAST QUADRANT - DECK INSULATION. | |||
| INSULATION INSPECTION | 01/04/2008 | PARTIALLY APPROVED | JLEVRAULT |
| Note: NORTHWEST 2/3RDS OF ROOF INSULATION. | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 01/02/2008 | PARTIALLY APPROVED | JLEVRAULT |
| Note: INTERIOR COURTYARD ARCH SHEATHING. SECOND FLOOR RIGHT ELEVATION SHEATHING. | |||
| FIRST ROUGH PLUMBING INSPECTION | 12/26/2007 | APPROVED | PGALLMANN |
| Note: WEST END SANITARY SEWER, AND NORTHEAST CORNER CLEAN-OUT CONNECTION. | |||
| FIRST ROUGH PLUMBING INSPECTION | 12/21/2007 | PARTIALLY APPROVED | JGIBSON |
| Note: TEST ON EAST SIDE AND NORTH SIDE OK EXCEPT FOR 6`` COMBO ON CONNECTION BETWEEN 2 SIDES | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 12/21/2007 | PARTIALLY APPROVED | JLEVRAULT |
| Note: LEFT AND RIGHT SIDE ROOF TOWERS PLYWOOD. | |||
| FIRST ROUGH PLUMBING INSPECTION | 12/19/2007 | PARTIALLY APPROVED | JGIBSON |
| Note: SOUTH RUN ON SANITARY UNDER-GROUND OK STILL NEED EAST NORTH AND WEST | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 12/18/2007 | PARTIALLY APPROVED | CMINI |
| Note: PARTIALLY APPROVED WALL SHEATHING HIGH LIGHTED AND DATED ON ELEVATION PLAN.. | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 12/14/2007 | PARTIALLY APPROVED | JLEVRAULT |
| Note: LOWER ELEVATION ON WEST SIDE - LEFT SIDE HALF. REVISION IS REQUIRED FOR THE BRIDGE THAT WAS REMOVED FROM THE WEST SIDE ELEVATION. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 12/12/2007 | PARTIALLY APPROVED | JLEVRAULT |
| Note: ISO TO THE END OF CENTER GABLE. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 12/11/2007 | PARTIALLY APPROVED | JLEVRAULT |
| Note: 44 FEET OF ISO HEADING NORTH OF SOUTH WALL. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 12/10/2007 | PARTIALLY APPROVED | JLEVRAULT |
| Note: SOUTHEAST CORNER 30 FEET FROM THE SOUTH WALL - ISO. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 12/06/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: CENTER OF BUILDING GABLE ROOF SHEATHING PLYWOOD. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 12/05/2007 | PARTIALLY APPROVED | JLEVRAULT |
| Note: ISO SOUTHWEST QUADRANT OF BUILDING. | |||
| FRAMING | 12/03/2007 | PARTIALLY APPROVED | JLEVRAULT |
| Note: CENTER GABLE PARAPET. | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 11/16/2007 | PARTIALLY APPROVED | JLEVRAULT |
| Note: THIS IS A REINSPECTION NORTH ELEVATION WALL SHEATHING. | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 11/14/2007 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: NAILS STICKING OUT IN AREAS. MISSING SCREWS IN AREAS. | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 11/09/2007 | PARTIALLY APPROVED | JLEVRAULT |
| Note: See revision - Engineer`s letter for the use of either 1/2" or 5/8" thick dens-glass for wall sheathing. EAST ELEVATION. | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 11/05/2007 | PARTIALLY APPROVED | JLEVRAULT |
| Note: THIS IS A REINSPECTION SOUTH SIDE WALL ELEVATION. | |||
| SECOND FLOOR SLAB INSPECTION | 11/05/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: WEST SIDE STAIR STEEL. | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 10/31/2007 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: SCREWS NOT DRIVEN HOME. NEED REVISION FOR NAILS USED IN LIEU OF SCREWS PER PLAN. | |||
| FRAMING | 10/23/2007 | APPROVED - AS NOTED | LWOODROME |
| Note: Rev.-Missed inspection- see engineer's letter from Universal Engineering Services. | |||
| LINTEL | 10/23/2007 | PARTIALLY APPROVED | JLEVRAULT |
| Note: MAIN STAIRS (LEFT AND RIGHT SIDE). | |||
| LINTEL | 10/19/2007 | APPROVED | JLEVRAULT |
| Note: FINAL LIFT FOR ENTRANCE TOWERS. | |||
| LINTEL | 10/16/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: FRONT ENTRANCE COLUMNS AT SECOND LIFT. | |||
| FRAMING | 10/12/2007 | PARTIALLY APPROVED | JLEVRAULT |
| Note: I INSPECTED THE SCREWS ON THE BOTTOM RAIL OF THE WINDOWS TO ENSURE PROPER SIZE AND NUMBER OF SCREWS BEFORE BEING COVERED BY WINDOW ALUMINUM. NEED LETTER OF MISSED INSPECTION FOR DENSGLAS INSTALLED ON THE SECOND FLOOR SOUTH SIDE OR REMOVE SAME FOR FRAMING INSPECTION. | |||
| FRAMING | 10/09/2007 | APPROVED | MMOORE |
| Note: THIS IS A REINSPECTION...1. EXTERIOR METAL STUD WINDOW FRAMING AT IST FLOOR / SOUTH END | |||
| LINTEL | 10/09/2007 | APPROVED | MMOORE |
| Note: THIS IS A REINSPECTION 1. ENTRANCE DRIVE-THRU TOWERS AT EACH SIDE / 1ST LIFT AT 12' +/- | |||
| SECOND FLOOR SLAB INSPECTION | 10/09/2007 | APPROVED | MMOORE |
| Note: THIS IS A REINSPECTION 1. THIS INSPECTION USED FOR A STAIR FORMING INSPECTION / THE ANGLE OF THE RISER TO BE CHECKED 2. BOTTOM OF STAIR PRE-MOLDED ISOLATION JOINT TO BE FORMED | |||
| LINTEL | 10/08/2007 | Disapproved - NO FEE | JLEVRAULT |
| Note: CANCELLED BY JOB SUPER - NOT READY. | |||
| FRAMING | 10/08/2007 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: THIS IS A REINSPECTION STILL MISSING SCREWS IN FRAMING. | |||
| SECOND FLOOR SLAB INSPECTION | 10/08/2007 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: STEEL NOT SET HIGH ENOUGH FROM BOTTOM OF FORMS. MISSING NOSING BARS. | |||
| FRAMING | 10/04/2007 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: MISSING SCREWS AT ALL WINDOW OPENINGS (BOTH SIDES) AND MISSING SCREWS AT VERTICAL LEG OF BOTTOM CLIPS. CHECK PROPER FASTENER SIZE FOR THE HORIZONTAL LEG OF BOTTOM CLIPS. | |||
| FOOTER | 09/27/2007 | APPROVED | MMOORE |
| FOOTER | 09/26/2007 | Disapproved - NO FEE | JLEVRAULT |
| Note: CANCELLED BY APPLICANT - NOT READY. | |||
| FOOTER | 09/24/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: RETAINING WALL FOOTINGS. | |||
| SECOND FLOOR SLAB INSPECTION | 09/14/2007 | PARTIALLY APPROVED | JLEVRAULT |
| Note: SECOND FLOOR BRIDGE SLAB. | |||
| FOOTER | 09/06/2007 | PARTIALLY APPROVED | JLEVRAULT |
| Note: THIS IS A REINSPECTION FIVE COLUMN FOOTINGS - HILITED AND DATED ON JOB PLANS. | |||
| SECOND FLOOR SLAB INSPECTION | 08/27/2007 | APPROVED | MMOORE |
| Note: 1. SUPERINTENDENT REMINDED OF SAFETY RAILS AND HARDHATS | |||
| SECOND FLOOR SLAB INSPECTION | 08/22/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: FROM LINES A TO I AND 6 TO 10. | |||
| SECOND FLOOR SLAB INSPECTION | 08/17/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: PARTIAL FROM BUILDING LINES A TO F AND 6 TO 10. | |||
| SECOND FLOOR SLAB INSPECTION | 08/14/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: second floor requested by SZARAPKA COLUMN LINES 1 THRU 6 AND A THRU E. HILITED AND DATED ON JOB PLAN. | |||
| FOOTER | 07/18/2007 | Disapproved - NO FEE | JLEVRAULT |
| Note: Richard came in to schedule CANCELLED BY JOB SUPER. | |||
| LINTEL | 07/12/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: Richard came in to schedule LAST LIFT - SOUTH ELEVATOR SHAFT. | |||
| LINTEL | 07/11/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: per the request of contractor NORTH SIDE ELEVATOR SHAFT - LAST LIFT. | |||
| LINTEL | 07/03/2007 | APPROVED | MMOORE |
| Note: Richard came in to schedule 1. 3RD LIFT AT EVEVATOR SHAFT | |||
| LINTEL | 06/29/2007 | APPROVED - AS NOTED | JHINDMAN |
| Note: Requested by Richard Prefer p.m inspection this is for a stemwall | |||
| SECOND FLOOR SLAB INSPECTION | 06/29/2007 | APPROVED | MMOORE |
| Note: Requested by Richard Prefer a p.m inspection | |||
| FOOTER | 06/20/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: TWO FOOTING PAD COLUMNS - SOUTH END. | |||
| LINTEL | 06/18/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: THIS IS A REINSPECTION REQUESTED BY CONTRACTOR ELEVATOR SHAFTS - SECOND FLOOR. | |||
| LINTEL | 06/13/2007 | Disapproved - NO FEE | JLEVRAULT |
| Note: CANCELLED BY CONTRACTOR. | |||
| LINTEL | 06/12/2007 | Disapproved - NO FEE | JLEVRAULT |
| Note: REQUESTED BY CONTRACTOR CANCELLED BY JOB SUPER. | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 06/12/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: CONTRACTOR REQUESTED PARTIAL APPROVED. | |||
| SECOND FLOOR SLAB INSPECTION | 06/12/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: CALLED BY CONTRACTOR PARTIAL APPROVED - DATED AND HILITED ON JOB PLANS. | |||
| SECOND FLOOR SLAB INSPECTION | 06/11/2007 | Disapproved - NO FEE | JLEVRAULT |
| Note: Richard came in to schedule INSPECTION CANCELLED BY JOB SUPER. | |||
| LINTEL | 06/11/2007 | Disapproved - NO FEE | JLEVRAULT |
| Note: Richard came in to schedule INSPECTION CANCELLED BY JOB SUPER. | |||
| SECOND FLOOR SLAB INSPECTION | 05/29/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: PARTIAL - HILITED AND DATED ON JOB PLANS. | |||
| TEMPORARY POLE | 05/23/2007 | APPROVED | LHITES |
| Note: called fpl 5/23 | |||
| LINTEL | 05/15/2007 | APPROVED - AS NOTED | MMOORE |
| Note: CALLED BY 1. LINTEL INSPECTED: COLUMN LINES B TO C AT COLUMN LINE #1 AT SOUTH WING 2. AT ELEVATOR, , SHAFT INSPECTED DOWNCELLS, FULL HEIGHT WALLS TO THE FLOOR ABOVE AND ADJOINING AIR CHASE | |||
| SECOND FLOOR SLAB INSPECTION | 05/15/2007 | APPROVED - AS NOTED | MMOORE |
| Note: Requested by Richard........1. IST SLAB POUR WEST WING | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 05/02/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: called by Linda PARTIAL - HILITED AND DATED ON JOB PLANS. | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 04/27/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: PARTIAL APPROVED - HILITED AND DATED ON JOB PLANS. | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 04/24/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: PARTIAL APPROVED - HILITED AND DATED ON JOB PLANS. | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 04/23/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: PARTIAL APPROVED - HILITED AND DATED ON JOB PLANS. | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 04/20/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: PARTIAL - HILITED AND DATED ON JOB PLANS. | |||
| FIRST ROUGH PLUMBING INSPECTION | 04/19/2007 | APPROVED | PGALLMANN |
| Note: THIS IS A REINSPECTION SECOND HALF OF STORM WATER PIPING IN GARAGE/PARKING LEVEL. | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 04/18/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: PARTIAL SLAB - HILITED AND DTED ON JOB PLANS. | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 04/16/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: PARTIAL SLAB - HILITED AND DATED ON JOB PLANS. | |||
| COLUMN INSPECTION | 04/13/2007 | APPROVED | JLEVRAULT |
| Note: LAST OF FIRST FLOOR COLUMNS. | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 04/12/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: PARTIAL SLAB - HILITED AND DATED ON JOB PLANS. | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 04/11/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: PARTIAL HILITED AND DATED ON JOB PLANS. | |||
| FIRST ROUGH PLUMBING INSPECTION | 04/11/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: PARTIAL SIX INCH UNDERGROUND DRAIN LINE - HILITED AND DATED ON JOB PLANS. | |||
| COLUMN INSPECTION | 04/11/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: PARTIAL APPROVED - HILITED AND DATED ON JOB PLANS. | |||
| RETAINING WALL | 04/11/2007 | APPROVED | JLEVRAULT |
| Note: FINAL WALL SECTIONS. | |||
| FIRST ROUGH PLUMBING INSPECTION | 04/10/2007 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: NEED 5 FEET OF TEST HEAD PRESSURE. | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 04/05/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: PARTIAL APPROVED. HILITED AND DATED ON JOB PLANS. | |||
| RETAINING WALL | 04/05/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: ELEVATOR WALLS. REVISION TO FOLLOW. HILITED AND DATED ON JOB PLANS. | |||
| COLUMN INSPECTION | 04/05/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: PARTIAL APPROVED - HILITED AND DATED ON JOB PLANS. | |||
| FOOTER | 04/02/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: ELEVATOR SHAFT FOOTERS. | |||
| COLUMN INSPECTION | 03/28/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: PARTIAL - HILITED AND DATED ON JOB PLANS. | |||
| RETAINING WALL | 03/28/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: EXTERIOR WALLS PARTIAL - HILITED AND DATED ON JOB PLANS. | |||
| RETAINING WALL | 03/22/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: PARTIAL FOUNDATION WALLS AND COLUMNS. HILITED AND DATED ON JOB PLANS. | |||
| FOOTER | 03/21/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: FOOTING PAD FOOTING STEEL ONLY. THIRD PARTY WILL MONITOR ONSITE CONCRETE PLACEMENT AND SUBMIT REPORT. | |||
| FOOTER | 03/16/2007 | APPROVED | MMOORE |
| PROJECT STATUS INSPECTION | 03/14/2007 | APPROVED | LWOODROME |
| Note: Letters (3) from Universal Engineering Re: Dewatering of footings before concrete pour | |||
| FOOTER | 03/09/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: Column and footings. Hilited and dated on job pans. Concrete placement to be monitored by Universal. | |||
| FOOTER | 03/07/2007 | APPROVED - AS NOTED | JLEVRAULT |
| Note: AM Inspection requested COLUMN FOOTINGS APPROVED. ENGINEER HAS SUBMITTED LETTER ASSUMING RESPONSIBILITY FOR PROPER PLACEMENT OF CONCRETE AND WILL SUBMIT FINAL ENGINEERED STAMPED LETTER OF SAME. | |||
| FOOTER | 03/06/2007 | Disapproved - NO FEE | JLEVRAULT |
| Note: THIS IS A REINSPECTION NOT READY - FOOTINGS UNDER WATER. | |||
| FOOTER | 03/05/2007 | CANCELLED BY APPLICANT | MMOORE |
| FOOTER | 03/01/2007 | APPROVED | MMOORE |
| Note: EAST AND NORTH FOOTER | |||
| FOOTER | 02/23/2007 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: DOWEL RODS NEED TO BE TIED TO FOOTING STEEL | |||
| FOOTER | 02/23/2007 | APPROVED | JMCGOWEN |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 10/28/2008 | 10/28/2008 |
| Note: Released By: JJOSEPH Revision : Change from fire-rated wall to non- fire rated wall | |||
| BLD | COMPLETE | 09/17/2008 | 09/17/2008 |
| Note: Released By: JJOSEPH Revision: Change partition in A102,and A103from non rated to 2 hours rated (lease space 22-24) and change bathroom opening in suite 101. | |||
| MECH | COMPLETE | 09/08/2008 | 09/08/2008 |
| Note: Released By: FREODICA Revision: 1. Clarification letter from engineer re. electrical power to HVAC equipments will be provided per tenant fit out permitting process. | |||
| MECH | COMPLETE | 09/02/2008 | 09/02/2008 |
| Note: Released By: FREODICA Re-submittal of revision: (Response to comments on previous revision dated 8-25-08). REVISION TO SHOW TENANT DUCTWORK. Note: Total revision charge includes previous revision which is = (4 hrs+1hr)($80.00/hr)= $400.00. | |||
| DSD | HOLD | 08/26/2008 | 08/28/2008 |
| Note: Held By: JGONZALEZ Need to do a modification to the Approved Site Plan to make changes on plans | |||
| MECH | HOLD | 08/25/2008 | 08/26/2008 |
| Note: Held By: FREODICA Revision: 1. Review comments on submitted revision: a. Provide supply air in CFM to all first floor bathrooms or indicate note on plan the design CFM. b. Lease spaces 02, 03 & 04 belong to a separate Permit No. 2007110084. Indicate on plan this reference Permit Number and delete ductwork and all informations not applicable to the shell building permit. c. AHU-05 indicates 4- ton unit on plan but calculated distributed supply air in CFM is close to 3-ton only. Please clarify. d. Lease space 06 is supplied by (2) units, AHU-6a and 6b but plan does not indicate their capacities (tons). The condenser unit on roof shows only (1) unit. Please clarify. e. Provide supply air distribution for unit AHU-12. f. Clarify unit capacity (ton) of AHU-14. It appears to be closer to 3-ton. g. Indicate unit capacity of AHU-13a & 13b. Clarify their condensers on roof as only (1) unit is shown. h. Clarify RTU(s) capacities on second floor for units RTU-20, 21, 22, 23, 26, 27 & 28. i. Clarify unit capacities of RTU- 29 & 30 as they do not match with those units shown on roof. j. Clarify unit capacities of RTU(s) 32, 33, 34, 35, & 36. k. Lease space 31 belongs to a separate permit No. 2008040063. Indicate this reference Permit Number and delete ductwork and all informations not applicable to the shell building permit. l. Clarify locations of condenser units (CU's) on roof. It appears that some CU's have exceeded the maximum required lenght of refrigerant piping to serve the AHU's. m. Clarify why are there CU's 25 thru 30 on roof. What units do they serve? Delete if not applicable. | |||
| BLD | CANCEL | 08/25/2008 | |
| ZON | COMPLETE | 08/25/2008 | 08/26/2008 |
| Note: Released By: ECOYNE | |||
| MECH | COMPLETE | 07/21/2008 | 07/21/2008 |
| Note: Released By: JMCGOWEN Revision ductwork letter | |||
| BLD | COMPLETE | 07/17/2008 | 07/21/2008 |
| Note: Released By: JJOSEPH REVISION TOILET ROOMS PROVIDED IN TENANT COMPLETION TO MEET PLUMBING FIXTURES REQUIREMENTS OF STANDARD PLUMBING CODE, AND ACCESSIBILITY REQUIREMENTS FOR CONSTRUCTION (2004 EDITION FLORIDA ACCESSIBILITY CODE FOR BUILDING). BATHROOM DOORS WILL BE INSTALLED IN OPENING PROVIDED DURING TENANT COMPLETION PHASE. | |||
| MECH | HOLD | 06/25/2008 | 06/25/2008 |
| Note: Held By: FREODICA 1. Submitted revision on duct specifications shall be signed and sealed by the Engineer of Record of the project. | |||
| BLD | COMPLETE | 06/02/2008 | 06/02/2008 |
| Note: Released By: FREODICA Rev.- stair corrections, Sheets Rev-A3, & Rev-A4. | |||
| PLUM | COMPLETE | 05/28/2008 | 05/30/2008 |
| Note: Released By: JJOSEPH 1. Relocated bathroom at lease space 20. | |||
| MECH | COMPLETE | 05/28/2008 | 05/30/2008 |
| Note: Released By: JJOSEPH 1. Flex duct attachment aproved by project engineer. | |||
| MECH | HOLD | 05/16/2008 | 05/16/2008 |
| Note: Held By: FREODICA 1. Submitted revision for ductwork using fiberglass shall be signed and sealed by Mechanical Engineer who designed the mechanical system. 2. Provide specifications of the fiberglass duct to comply with FMC 2004 section 603.4. | |||
| BLD | CANCEL | 04/28/2008 | |
| Note: REVISION STAIR DETAIL FIRE STOP DETAIL | |||
| MECH | COMPLETE | 04/22/2008 | 04/22/2008 |
| Note: Released By: FREODICA Revision Mechanical shaft detail | |||
| PLUM | COMPLETE | 04/17/2008 | 04/17/2008 |
| Note: Released By: FREODICA Revision Fire stop system- Hilti FA 2067, FA 2058 & CAJ 2407. | |||
| MECH | COMPLETE | 04/03/2008 | 04/03/2008 |
| Note: Released By: FREODICA Rev. - Fire stop detail, HVAC ductwork, condensate drain using hartell condensate pumps. | |||
| PLUM | COMPLETE | 04/02/2008 | 04/02/2008 |
| Note: Released By: FREODICA Rev.- 1. Deleted all toilet floor drains. 2. Deleted bathroom at 2nd floor unit 31. 3. Added bathroom on unit 31 next to wall with unit 32. | |||
| MECH | HOLD | 03/18/2008 | 03/19/2008 |
| Note: Held By: FREODICA 1. Submitted revision on HVAC needs the following clarifications: a. Floor plans on M-1 show Lease Space Typical Small, Medium and Large which are being served by AH-1, AH-2, RTU-1 and RTU-2. The other Lease Space Typical Large does not identify what unit is used. Please identify the HVAC units used for Each Tenant by using the Lease Space Numbers shown on floor plans. b. The detail for condensate drain shows 3/8" plastic tubing connected to a copper tubing which is not code compliance per FBC/Mech Section 307. Please revise. c. Bathroom Exhaust Ducting Route First Floor Detail- Exhaust duct penetrating the fire rated floor/ceiling shall comply with FBC 2004 Section 716.6.1. or FBC 2004/Mechanical Section 607.6.1 | |||
| ELEC | HOLD | 02/25/2008 | 02/26/2008 |
| Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to Permit #2006110486 (Roma Court @ 515 Palm Coast Pkwy) 2/26/2008 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. Sheet E201: a. Fixture type 'P' just north of Stair #1 has no circuit identified. Identify circuit and all load at panel. 2. Sheet E202: a. Circuits HP1-29 and HP2-29 show (1) EF-G2 which per sheet M102 is a 1/2HP motor at 120V (approx 9.8A). In addition there are 5 convenience receptacles on each of these same circuits for a total of 900VA. Total actual load on circuits HP1-29 and HP2-29 appears to be 2370VA per NEC 220.18(A) on a 20A circuit. Review and revise panel schedule loads. 3. Sheet E203: a. Circuit HP1-21 shows some added and revised fixtures. Sheet E401 panel schedule HP1 does not reflect the increased load. Review and revise panel load. b. HP1-7 (E203) and HP1-9 (E203 and E206) both reflect undersized loads in Panel Schedule HP1. Please review and revise panel schedule loads for these circuits. 4. Sheet E204 and E205: a. Fixtures have been revised for circuits HP2-8 (E204 and E205), and HP2-11 (E204), but loads in Panel HP2 sheet E401 have not been updated to show increased load. Review and revise loads in panel schedule. 5. Sheet E205: a. Receptacle has been added outside lease space 14 with no circuit identification. Identify circuit and update load in panel schedule. b. Fixtures have been revised for circuit HP2-7 but load in panel schedule HP2 sheet E401 has not been updated to show increased load. Review and revise loads in panel schedule. c. Last fixture on west end of covered walkway 100B is not identified for fixture type. Identify fixture type. 6. Sheet E206 and E207: a. Circuit HP1-13 shows total of (15) type 'A' and (1) type 'V' fixtures on this circuit. Panel Schedule HP1 does not reflect increased load. Review and revise panel load. 7. Sheet E206: a. In revised restrooms on Terrace, identify fixture and exhaust fan types shown in both restrooms, and update load to circuit HP1-9 in panel schedule on E401. 8. Sheet E203 and E206: a. Circuit HP1-27 is reflected on both sheets showing a total of (8) receptacles for a load of 1440VA. Panel schedule only shows 780VA for this circuit. Update panel load. 9. Sheet E206 and E401: a. Circuit HP1-11 is reflected on both sheets with a total of (12) type 'S', (8) type 'EM', and (4) type 'E' for a total of 1512 VA. Panel schedule load shows only 710VA. Review and revise panel schedule load. 10. Sheet E206 and E207: a. Circuit HP1-25 shows various fixtures in lease spaces 24, 25 and 26. Panel schedule HP1 shows circuit 25 as bridge light with 140VA. Total actual load is significantly higher. Review and revise load in panel schedule. b. Sheet E206 shows receptacle on circuit HP1-23 moved across hall from elevator. E207 still shows what appears to be same receptacle still located on elevator wall. Review and revise. 11. Sheet E207 and E208: a. Circuit HP2-13 shows total of (12) type 'A' and (2) type 'V' fixtures. Panel schedule HP2 does not reflect increased load to this circuit. Review and revise load in panel schedule. 12. Sheet E208: a. Terrace 100C has revised restrooms. Identify fixture and exhaust fan types for both restrooms and update load for HP2-27 in panel schedule to include these loads plus the (4) receptacles shown elsewhere on this sheet. 13. Sheet E301 Electrical Riser Diagram: a. Meter/circuit breaker is not shown in Meter Center 1B for Panel HP1, or in Meter Center 2B for HP2 and both panels are Main Lug Only. Identify Meter/circuit breaker size for each panel. b. Identify feeder size for HP1 and HP2. 14. Sheet E401: a. Panels HP1 and HP2 both show fan EF-G1 for several circuits in each panel. Sheet M102 shows EF-G1 is 20HP at 208V 3ph yielding approximately 62.1A (22,356VA). Panel schedule currently shows only 2700VA total for each circuit. Review and revise Panel load (VA), circuit breaker size, wire size, and disconnect requirements for all EF-G1 shown. b. Electrical Load Calculation for Roma Court Garage identifies Elevator as 32.5KVA. Both panels HP1 and HP2 show the elevator load as 22.5KVA. Please review and revise elevator load. 15. Due to the significant increase in loads as noted in the comments listed above, revise load calculations for all circuits for both HP1 and HP2 to reflect actual installation. Demand load appears to exceed current panel size for both panels. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us | |||
| ELEC | HOLD | 02/21/2008 | 02/21/2008 |
| Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to Permit #2006110486 (Roma Court Shopping Plaza @ 515 Palm Coast Pkwy) 2/21/2008 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. All electrical revisions must be signed and sealed by the Engineer of Record. 2. Provide a description of all electrical changes to the City of Palm Coast approved plans which should be submitted with the revised sheets. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us | |||
| FD1 | COMPLETE | 02/21/2008 | 02/26/2008 |
| Note: Released By: JPATTEE | |||
| ZON | COMPLETE | 02/20/2008 | 02/21/2008 |
| Note: Released By: ECOYNE Held By: ECOYNE not a part of original review - need to review with DSD revision approved by Kathy Davis 02/21/08 | |||
| BLD | COMPLETE | 02/20/2008 | 02/21/2008 |
| Note: Released By: JMCGOWEN revision looks like request from Joe Leavault ecoyne 02/19/08 | |||
| FD1 | HOLD | 02/13/2008 | 02/14/2008 |
| Note: Held By: JPATTEE revision The system provided appears to be acceptable, however, Item 3.C. appears to be lacking in information as to the type of forming material to be used. | |||
| BLD | HOLD | 02/08/2008 | 02/08/2008 |
| Note: Held By: JMCGOWEN Provide description of changes in detail and indicate changes clearly on plans. | |||
| BLD | HOLD | 02/08/2008 | 02/08/2008 |
| Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to Permit Application #2006110486 (Roma Court @ 515 Palm Coast Pkwy SW) 2/8/2008 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. All Sheets: Provide detailed description of all changes since last submitted revision and clearly identify revision changes on each plan sheet. (Be sure to update any load calculations as required.) …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us | |||
| BLD | HOLD | 02/08/2008 | 02/08/2008 |
| Note: Held By: FREODICA 1. Submitted (12) revised plumbing plans do not indicate which items were changed or revised. Please identify. | |||
| BLD | COMPLETE | 11/29/2007 | 11/29/2007 |
| Note: Released By: FREODICA Rev.- Gable parapet at center of building. Fire-retardant plywood is approved per LW. | |||
| BLD | HOLD | 11/26/2007 | 11/27/2007 |
| Note: Held By: FREODICA 1. The letter of Engr. Harry Brumley regarding the gable parapet at the center of the building indicates the use of plywood. It was not specified whether the plywood to be used is a fire-retardant-treated wood which is required for Type 1B construction. Please clarify. | |||
| BLD | COMPLETE | 11/02/2007 | 11/06/2007 |
| Note: Released By: FREODICA Rev. - Revised structural sections/details 5/S10, 11/S10, 1/S11, 6/S11 & 8/S11 for the use of either 1/2" or 5/8" thick dens-glass sheating. See engineer's letter. | |||
| BLD | COMPLETE | 11/02/2007 | 11/06/2007 |
| Note: Released By: FREODICA Rev.- Revised stair detail, 2/S13. See engineer's letter for description. | |||
| BLD | COMPLETE | 10/22/2007 | 10/23/2007 |
| Note: Released By: FREODICA Rev.- Missed inspection-exterior metal framing inspection. | |||
| BLD | COMPLETE | 09/27/2007 | 10/02/2007 |
| Note: Released By: FREODICA Rev. - Structural- Dome to channel connection detail. | |||
| BLD | COMPLETE | 09/27/2007 | 10/02/2007 |
| Note: Released By: FREODICA Rev.- Structural- Typical stair section. | |||
| BLD | COMPLETE | 09/13/2007 | 09/18/2007 |
| Note: Released By: FREODICA Rev. entrance tower structural plans and details. | |||
| BLD | COMPLETE | 09/13/2007 | 09/18/2007 |
| Note: Released By: FREODICA Rev. Ram loading detail. | |||
| BLD | COMPLETE | 06/25/2007 | 06/26/2007 |
| Note: Released By: CCOTE Approved for Release. REVISION: Structural changes 1/S2, 1/S3, 3/S3. | |||
| BLD | COMPLETE | 04/30/2007 | 05/01/2007 |
| Note: Released By: LWOODROME Revision: 1st floor drop panel plan | |||
| BLD | COMPLETE | 04/04/2007 | 04/05/2007 |
| Note: Released By: CCOTE Approved for Release. REVISION: Revised detail 1/S8, elevator pit. | |||
| BLD | COMPLETE | 03/14/2007 | 03/14/2007 |
| Note: Released By: JJOSEPH Rejected By: JJOSEPH Released By: LWOODROME Inspection report form Universal Engineering: Re: Dewatering of footers | |||
| BLD | COMPLETE | 03/06/2007 | 03/06/2007 |
| Note: Released By: CCOTE Approved for Release. REVISION: Engineer letter regarding water in footer. Contractor to provide on-site monitory during concrete placement. | |||
| BLD | COMPLETE | 01/26/2007 | 01/30/2007 |
| Note: Released By: LWOODROME | |||
| BLD | COMPLETE | 01/23/2007 | 01/24/2007 |
| Note: Released By: LWOODROME | |||
| BLD | HOLD | 01/16/2007 | 01/24/2007 |
| Note: Held By: LWOODROME Contacted engineer of record Re: 2nd floor outside air and exhaust duct fire dampers | |||
| BLD | HOLD | 12/19/2006 | 01/03/2007 |
| Note: Held By: LWOODROME PLAN REVIEW COMMENTS: " Provide coordination review and revise structural drawings, as needed, to address the changes, shown on the revised architectural plans, for the interior stairwell/utility room, elevator/vent shaft/equipment room and the exit ramps added in the parking garage. " Provide a permanent means of access, to the level of the roof mounted equipment per Florida Building Code/Mechanical, section 306.5. " Verify that the H.C. parking space, near stair # 2, does not encroach into the required maneuvering space, in front of the elevator door. " Specify fire dampers, at the rated wall penetrations, for the exhaust duct, sheet M205. " Provide duct layout for outside air, sheet(s) M207, M208, and M209. " Provide plumbing diagram for the parking garage level, including trench drains (indicated at the entrance ramps), elevator sumps and any other fixtures or receptors. " Provide exit sign(s) for the exit ramps leading from the parking garage. " Provide additional exit sign(s), in the garage area, so that each egress travel path, is clearly indicated. " Provide illumination (typical and emergency egress) at the first floor level of the stairwell(s) to the parking garage. " Provide illumination (typical and emergency egress) at the exterior stair(s) #1 and #2, between the first and second floor. " Provide for additional WPGFI receptacle outlets, on the roof, so that no piece of roof top mounted equipment (including future proposed) is more than 25' form a receptacle outlet. Larry Woodrome, CBO Chief Plans Examiner City of Palm Coast 386-986-3786 | |||
| BLD | HOLD | 11/28/2006 | 12/05/2006 |
| Note: Held By: LWOODROME " This building is intended to be a shell. However, because of certain design elements of the building (i.e. rated floor/ceiling assemblies and 2 hour rated tenant separation walls), additional information is needed. Mechanical, Electrical and Plumbing plans will be required, for systems being installed as part of the shell and to verify compliance with code requirements, where these systems either penetrate or are enclosed within the assemblies of rated construction. " Provide Energy Calculations per Florida Building Code, section 13-101.1.6. " Verify column load path. Column shown in detail 4/S8 is not centered on exterior wall. " Clarify; detail(s) show exterior walls and 10" slab as a monolithic pour, if this is correct provide note stipulating that requirement, if it is not correct, revise detail(s) to indicate location of cold joints. " Provide detail(s) of intersection of 10" floor slab and the CMU walls at the elevator shaft(s). " Provide details of space(s), in the corners of the "Parking Garage", which are labeled as "Electrical Room". " Delete structural detail note(s), which indicate wood sheathing, on exterior framed walls. (Combustibles, in concealed spaces, not permitted in type I B construction.) " Specify a Fire-Resistant Joint System, where the slab connects to the elevator shaft walls. " Provide revised exiting from the parking garage. The vehicular ramps can not be used as a means of egress per FBC, section 406.2.5, therefore, the exit stairs from this space must be separated per FBC, section 1014.2.1. " Provide detail(s), which indicate the method(s) of attaching the top of exterior frame walls, to the primary structure. " Provide detail(s), which indicate the method(s) of attaching the tops and bottoms of interior frame walls, to the primary structure. " Provide a plumbing plan. " Provide method of directing flow of rain water from roof section behind the "Decorative Parapet Wall", away from the structure. " Provide a mechanical plan. " Provide mechanical ventilation for the parking garage, per FBC, section 406.4.2. " Provide an electrical plan. Additional comments may be forth coming, based upon review of the re-submitted plans. | |||
| FI1 | COMPLETE | 12/11/2006 | |
| Note: Released By: JPATTEE Held By: JPATTEE Provide automatic fire sprinkler design criteria per florida administrative code. Parking garage exiting provided exceeds allowable travel distance per table 42.8.2.6 NFPA 101 2003 edition. | |||
| FI1 | COMPLETE | 01/26/2007 | |
| Note: Released By: JPATTEE | |||
| BLD | COMPLETE | 02/19/2008 | |
| Note: Released By: JMCGOWEN | |||
| ELEC | COMPLETE | 03/18/2008 | |
| Note: Released By: JMCGOWEN | |||
| FD1 | COMPLETE | 05/05/2008 | |
| Note: Released By: JPATTEE REVISION STAIR DETAIL FIRE STOP DETAIL | |||
| DSD | CANCEL |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 10/28/2008 |
| REVISION | ¤40.00 | 10/28/2008 |
| REINSPECTION FEE | ¤40.00 | 10/20/2008 |
| ADDITIONAL FEE | ¤80.00 | 10/16/2008 |
| MISCELLANEOUS | ¤40.00 | 10/16/2008 |
| MISCELLANEOUS | ¤40.00 | 10/16/2008 |
| REVISION | ¤80.00 | 10/16/2008 |
| REVISION | ¤40.00 | 10/16/2008 |
| REVISION | ¤400.00 | 10/16/2008 |
| REVISION | ¤40.00 | 10/16/2008 |
| REVISION | ¤40.00 | 10/16/2008 |
| REVISION | ¤40.00 | 10/16/2008 |
| REVISION | ¤40.00 | 10/16/2008 |
| REVISION | ¤40.00 | 10/16/2008 |
| REVISION | ¤40.00 | 10/16/2008 |
| REVISION | ¤120.00 | 10/16/2008 |
| REVISION | ¤40.00 | 10/16/2008 |
| REVISION | ¤40.00 | 10/16/2008 |
| REVISION | ¤40.00 | 10/16/2008 |
| REVISION | ¤80.00 | 10/16/2008 |
| REVISION | ¤40.00 | 10/16/2008 |
| REVISION | ¤40.00 | 10/16/2008 |
| REVISION | ¤40.00 | 10/16/2008 |
| REVISION | ¤40.00 | 10/16/2008 |
| REVISION | ¤40.00 | 10/16/2008 |
| REVISION | ¤40.00 | 10/16/2008 |
| REVISION | ¤40.00 | 10/16/2008 |
| REVISION | ¤40.00 | 10/16/2008 |
| REVISION | ¤40.00 | 10/16/2008 |
| REVISION | ¤40.00 | 10/16/2008 |
| REVISION | ¤40.00 | 10/16/2008 |
| REVISION | ¤40.00 | 10/16/2008 |
| REINSPECTION FEE | ¤40.00 | 10/16/2008 |
| REINSPECTION FEE | ¤40.00 | 10/16/2008 |
| REINSPECTION FEE | ¤40.00 | 10/16/2008 |
| REINSPECTION FEE | ¤40.00 | 10/16/2008 |
| REINSPECTION FEE | ¤40.00 | 10/16/2008 |
| REINSPECTION FEE | ¤40.00 | 10/16/2008 |
| REINSPECTION FEE | ¤40.00 | 10/16/2008 |
| REINSPECTION FEE | ¤40.00 | 10/16/2008 |
| REINSPECTION FEE | ¤40.00 | 10/16/2008 |
| REINSPECTION FEE | ¤40.00 | 10/16/2008 |
| REINSPECTION FEE | ¤40.00 | 10/16/2008 |
| REINSPECTION FEE | ¤40.00 | 10/16/2008 |
| REINSPECTION FEE | ¤40.00 | 10/16/2008 |
| REINSPECTION FEE | ¤40.00 | 10/16/2008 |
| REINSPECTION FEE | ¤40.00 | 10/16/2008 |
| REINSPECTION FEE | ¤40.00 | 10/16/2008 |
| REINSPECTION FEE | ¤40.00 | 10/16/2008 |
| REINSPECTION FEE | ¤40.00 | 10/16/2008 |
| REINSPECTION FEE | ¤40.00 | 10/16/2008 |
| REINSPECTION FEE | ¤40.00 | 10/16/2008 |
| TRANSPORTATION IMPACT FEE | ¤243,773.37 | 02/02/2007 |
| PERMIT FEE | ¤38,500.00 | 02/02/2007 |
| PLAN CHECK FEE | ¤8,050.00 | 02/02/2007 |
| PLUMBING FEE | ¤4,230.00 | 02/02/2007 |
| RADON FEE | ¤543.94 | 02/02/2007 |
| ADMIN FEE | ¤20.00 | 02/02/2007 |
| BUILDING CODE ADMIN FUND | ¤543.94 | 02/02/2007 |
| ELECTRIC FEE | ¤4,230.00 | 02/02/2007 |
| FIRE COMM IMPACT FEE 4-1-05 | ¤54,078.02 | 02/02/2007 |
| FIRE PLANS REVIEW | ¤1,087.87 | 02/02/2007 |
| MECHANICAL FEE | ¤4,230.00 | 02/02/2007 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤361,927.14 |