I want to search for...
Permit #2007010485
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-01140-0090 |
| CONDITIONED SPACE: 2122 sqft |
| GARAGE: 515 sqft |
| OPENED PORCH (WITH ROOF) : 321 sqft |
| OPENED PORCH (WITH ROOF) : 162 sqft |
| Total Square Footage: 3120 sqft |
| Block: 01140 |
| Subdivision: - |
| Job Phone: (386)447-8680 |
| Location Address: 5 EDGEMONT LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/07/2007 |
| NOC: RECORDED |
| Applicant name: MICHAEL LEO BRANIFF |
| Owner: STEINER, DAVID L & KAREN C |
|
Address 5 EDGEMONT LANE PALM COAST, FL 32164 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤159,150.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
RIVER CITY HOMES
| Status | Location Address | State License Number | Phone |
| CANCEL |
12058 SAN JOSE BLVD #804 Jacksonville, FL 32223 |
CGC062728 (Exp: 08/31/2012) | 904-260-9009 |
Sub Contractors
PETER JOSEPH LYDEN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
PO BOX 1009 BUNNELL, FL 32110 |
EC0002436 (Exp: 08/31/2014) | (386) 931-2568 | 386-313-3445 |
EDDIE T PALMATEER
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
2985 ENTERPRISE ROAD DEBARY, FL 32713 |
SUITE A DEBARY, FL 32713 |
CAC1813533 (Exp: 08/31/2024) | (386)668-8651 | (386)668-7758 |
SCOTT RICHARD GATTIE
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1508 CLAPTON DR DELAND, FL 32720 |
CFC057990 (Exp: 08/31/2010) | (386)740-9227 | (386)740-9228 |
BARRY D MARTIN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1650 N STATE STREET Bunnell, FL 32110 |
CCC033728 (Exp: 08/31/2020) | (386) 437-7700 | (386)437-7701 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 06/29/2007 | FINAL APPROVED | JHINDMAN |
| FINAL COMPLETE BUILDING INSPECTION | 06/28/2007 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: MISSING ARC FAULT IN MASTER BEDROOM LANI, NEED TO PHASE CONDUCTORS AT A/C DISCONNECT,NEED CONNECTOR AT DISCONNECT AT A/C | |||
| STORMWATER FINAL INSPECTION | 06/20/2007 | APPROVED - AS NOTED | GLALIMA |
| Note: 40 ' FEET OF ROAD DAMAGE = 420.00 DOLLARS . | |||
| STORMWATER FINAL INSPECTION | 06/20/2007 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: Re-inspect. REMOVE SOD OVER SOD . REGRADE IF NEEDED . | |||
| UTILITY COMPANY FINAL | 06/18/2007 | APPROVED | PLAWRENCE |
| RESIDENTIAL EARLY POWER | 06/15/2007 | APPROVED | LHITES |
| DRIVEWAY | 05/14/2007 | APPROVED - AS NOTED | GLALIMA |
| Note: REMOVING SOD AT STREET , AT TIME OF INSPECTION . READY TO POUR. | |||
| INSULATION INSPECTION | 04/18/2007 | APPROVED | DROCKWELL |
| ALL ROUGH | 04/11/2007 | APPROVED | JMCGOWEN |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 04/09/2007 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Tap con lookouts at all Eve's/Strap panel wiring to ceiling/Tighten threaded rods | |||
| LATH /BRICK FLASHING | 04/02/2007 | APPROVED | DROCKWELL |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 03/23/2007 | APPROVED | PGALLMANN |
| Note: | |||
| LINTEL | 03/07/2007 | APPROVED | PGALLMANN |
| Note: | |||
| FOUNDATION SURVEY APPROVED BY STORMWATER | 03/06/2007 | APPROVED - AS NOTED | LAPTEKAR |
| Note: new grading plan required for adjusted FFE | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 02/27/2007 | APPROVED | DROCKWELL |
| Note: | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 02/26/2007 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: SLEEVE WATER LINE THRU FOOTER AND COVER ANY CPVC EXPOSED TO CONCRETE | |||
| FIRST ROUGH PLUMBING INSPECTION | 02/23/2007 | APPROVED | PGALLMANN |
| Note: |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 05/01/2007 | 05/02/2007 |
| Note: Released By: KTRAINOR | |||
| SW1 | COMPLETE | 04/24/2007 | 04/24/2007 |
| Note: Released By: KTRAINOR Held By: EBLACKER We cannot complete the swale plan for this property due to a datum elevation discrepancy on the topographic survey. We check the topographic surveys against the city's as-built drawings corrected to the NAVD of 1988. The elevations are different than we expected by(-1.36)ft. at the left property line extended to the road center line and (-.58)ft at the right property line extended to the road center line. Please submit three signed sealed topographic surveys for this property showing corrected elevations. If we can be of help regarding this issue please call (386) 986-4760. NOTE: When topographic survey elevations are changed, all documents that reference or duplicate those elevations must also be revised. | |||
| BLD | COMPLETE | 01/30/2007 | 01/31/2007 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Auba. | |||
| ZON | COMPLETE | 01/30/2007 | 01/30/2007 |
| Note: Released By: ECOYNE | |||
| ZON | HOLD | 01/24/2007 | 01/25/2007 |
| Note: Held By: ECOYNE | |||
| SW1 | COMPLETE | 01/26/2007 | |
| Note: Released By: LAPTEKAR Grading plan elevations in the right rear quadrant may need adjusting to ensure containment of drainage. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ENGINEERING ROAD DAMAGE | ¤420.00 | 07/03/2007 |
| EARLY POWER INSPECTION | ¤40.00 | 07/03/2007 |
| REINSPECTION FEE | ¤40.00 | 07/03/2007 |
| REINSPECTION FEE | ¤40.00 | 07/03/2007 |
| REINSPECTION FEE | ¤40.00 | 07/03/2007 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 07/03/2007 |
| SW REVISION | ¤40.00 | 07/03/2007 |
| 10/06 TRANS IMPACT FEE/MULTI | ¤3,631.83 | 02/07/2007 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 02/07/2007 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/07/2007 |
| ADMIN FEE | ¤20.00 | 02/07/2007 |
| ARC HOUSE REVIEW | ¤125.00 | 02/07/2007 |
| BUILDING CODE ADMIN FUND | ¤15.60 | 02/07/2007 |
| ELECTRIC FEE | ¤158.40 | 02/07/2007 |
| FIRE IMPACT FEE 4-1-06 | ¤179.37 | 02/07/2007 |
| MECHANICAL FEE | ¤158.40 | 02/07/2007 |
| PERMIT FEE | ¤834.60 | 02/07/2007 |
| PARKS IMPACT FEE 4/1/06 | ¤1,159.02 | 02/07/2007 |
| PLAN CHECK FEE | ¤85.60 | 02/07/2007 |
| PLUMBING FEE | ¤158.40 | 02/07/2007 |
| RADON FEE | ¤15.60 | 02/07/2007 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,876.82 |