I want to search for...
Permit #2007030206
Permit Details
Status: COED
| CONDITIONED SPACE: 2858 sqft |
| GARAGE: 557 sqft |
| OPENED PORCH (WITH ROOF) : 560 sqft |
| OPENED PORCH (WITH ROOF) : 53 sqft |
| Total Square Footage: 4028 sqft |
| Block: 00000 |
| Subdivision: - |
| Job Phone: (386)931-0468 |
| Location Address: 4 WINTER HAVEN CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/26/2007 |
| NOC: RECORDED |
| Applicant name: ERIC ALLEN |
| Owner: RUBEN L & TERESITA L ANASTACIO |
|
Address 4256 N ARLINGTON HEIGHTS RD ARLINGTON HEIGHTS, IL 60004 |
|
Address SUITE 203 ARLINGTON HEIGHTS, IL 60004 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤310,000.00 |
| Job Description: SINGLE FAMILY HOME |
| Type: CN |
Contractor
ALLEN HOMES & CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| CANCEL |
18 FORGE LANE PALM COAST, FL 32137 |
CGC1505654 (Exp: 08/31/2014) | 386-931-0468 |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
RONALD E BANKS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
PO BOX 353741 PALM COAST, FL 32164 |
CAC049308 (Exp: 08/31/2010) | (386) 437-4800 | (386)445-0030 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JEFFREY LUIS CARRASCO
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
665 W. COUNTY ROAD 2006 BUNNELL, FL 32110 |
CCC1325557 (Exp: 08/31/2010) | 904-674-4730 | 904-268-0471 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 02/06/2008 | FINAL APPROVED | PGALLMANN |
| STORMWATER FINAL INSPECTION | 02/05/2008 | APPROVED | DRANDALL |
| UTILITY COMPANY FINAL | 02/05/2008 | APPROVED | MBACON |
| RESIDENTIAL EARLY POWER | 01/11/2008 | APPROVED | RMARVEL |
| DRIVEWAY | 11/05/2007 | APPROVED | DRANDALL |
| INSULATION INSPECTION | 09/12/2007 | APPROVED | PGALLMANN |
| ALL ROUGH | 09/07/2007 | APPROVED | PGALLMANN |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 08/28/2007 | Disapproved -FEE REQUIRED | MMOORE |
| Note: THIS IS A REINSPECTION CALLED BY CONTRACTOR 1. MAIN FEEDERS MISSING AT PANELS 2. SEAL AROUND DRYER VENT AT OSB 3. GROUT TRUSSES WITH STONELESS GROUT 4. TAPCON CABANA 2X4 AGAINST WALL 5. ACCESS HOLE AT JACUZZI TO BE FRAMED AT MOTOR | |||
| ALL ROUGH | 08/27/2007 | Disapproved -FEE REQUIRED | MMOORE |
| Note: 1. NO PLANS IN INSPECTION BOX | |||
| LATH /BRICK FLASHING | 08/14/2007 | APPROVED | RMARVEL |
| Note: requested by contractor | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 07/31/2007 | APPROVED | CMINI |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 07/27/2007 | Disapproved - NO FEE | CMINI |
| Note: CACELLED BY APPICANT. | |||
| RESIDENTIAL EARLY POWER | 05/22/2007 | APPROVED - AS NOTED | LHITES |
| Note: REQUESTED BY CONTRATOR THIS IS A TUG SERVICE. CALLED FPL 5/22/07. | |||
| LINTEL | 05/16/2007 | APPROVED | PGALLMANN |
| FOUNDATION SURVEY APPROVED BY STORMWATER | 04/26/2007 | APPROVED | LAPTEKAR |
| MONOLITHIC SLAB INSPECTION/SLAB | 04/13/2007 | APPROVED | PGALLMANN |
| Note: | |||
| FIRST ROUGH PLUMBING INSPECTION | 04/10/2007 | APPROVED - AS NOTED | PGALLMANN |
| Note: NEED APPROVED REVISION FOR SUMMER KITCHEN. | |||
| TEMPORARY POLE | 03/30/2007 | APPROVED | JLEVRAULT |
| Note: CALLED SUSAN AT FPL AT 1:30. |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 08/24/2007 | 08/28/2007 |
| Note: Released By: ECOYNE | |||
| BLD | COMPLETE | 08/23/2007 | 08/24/2007 |
| Note: Released By: FREODICA Approved for release. Rev.- Remove window. | |||
| BLD | COMPLETE | 04/24/2007 | 04/26/2007 |
| Note: Released By: CCOTE Aprpoved for Release. REVISION: Added future summer kitchen. | |||
| BLD | COMPLETE | 03/22/2007 | 03/23/2007 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Auba. | |||
| SW1 | HOLD | 03/22/2007 | 03/22/2007 |
| Note: Held By: LAPTEKAR Received new topo survey....still missing centerline of the road elevations directly in front of side property lines | |||
| SW1 | COMPLETE | 03/22/2007 | 03/23/2007 |
| Note: Released By: LAPTEKAR received topo survey with centerline of pavement measurements | |||
| BLD | HOLD | 03/12/2007 | 03/13/2007 |
| Note: Held By: JJOSEPH 1- Decorative cementitious Coating CAN NOT be be used over exterior masonry wall, unless the block can be shown porous. The 2006 supplement code to the Florida Building Code recommandes to use Stucco or Cement Portland Plaster. 2- You need to indicate how the stucco will be applied over exterior masonry wall. | |||
| ZON | COMPLETE | 03/12/2007 | 03/12/2007 |
| Note: Released By: ECOYNE | |||
| ZON | HOLD | 03/08/2007 | 03/09/2007 |
| Note: Held By: ECOYNE | |||
| SW1 | HOLD | 03/13/2007 | |
| Note: Held By: LAPTEKAR Survey needs to reference a benchmark. Need elevations of the flowline of the nearby Stormwater treatment catch basin. Need edge of pavement measurements. Grade proposals for the swale. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | ¤40.00 | 02/06/2008 |
| EARLY POWER INSPECTION | ¤40.00 | 02/06/2008 |
| REINSPECTION FEE | ¤40.00 | 02/06/2008 |
| REINSPECTION FEE | ¤40.00 | 02/06/2008 |
| REVISION | ¤40.00 | 02/06/2008 |
| REVISION | ¤40.00 | 02/06/2008 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 03/26/2007 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/26/2007 |
| 10/06 TRANS IMPACT FEE/MULTI | ¤3,631.83 | 03/26/2007 |
| ADMIN FEE | ¤20.00 | 03/26/2007 |
| ARC HOUSE REVIEW | ¤125.00 | 03/26/2007 |
| BUILDING CODE ADMIN FUND | ¤20.14 | 03/26/2007 |
| ELECTRIC FEE | ¤216.00 | 03/26/2007 |
| FIRE IMPACT FEE 4-1-06 | ¤179.37 | 03/26/2007 |
| MECHANICAL FEE | ¤216.00 | 03/26/2007 |
| PERMIT FEE | ¤1,209.00 | 03/26/2007 |
| PARKS IMPACT FEE 4/1/06 | ¤1,159.02 | 03/26/2007 |
| PLAN CHECK FEE | ¤124.00 | 03/26/2007 |
| PLUMBING FEE | ¤216.00 | 03/26/2007 |
| RADON FEE | ¤20.14 | 03/26/2007 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤11,056.50 |