I want to search for...
Permit #2007030249
Permit Details
Status: COED
| Parcel Id: 07-11-31-7010-00230-0220 |
| CONDITIONED SPACE: 1852 sqft |
| GARAGE: 574 sqft |
| OPENED PORCH (WITH ROOF) : 48 sqft |
| OPENED PORCH (WITH ROOF) : 436 sqft |
| Total Square Footage: 2910 sqft |
| Block: 00230 |
| Subdivision: - |
| Job Phone: (386)445-9393 |
| Location Address: 38 FELING LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/22/2007 |
| NOC: RECORDED |
| Applicant name: ANTONIO AMARAL JR |
| Owner: AMARAL CUSTOM HOMES, INC A FLORIDA CORP |
|
Address 13 UTILITY DRIVE PALM COAST, FL 32137 |
| Lot: 0220 |
| Contracted Stated Job Value: ¤155,900.00 |
| Job Description: SINGLE FAMILY HOME |
| Type: CN |
Contractor
AMARAL CUSTOM HOMES INC.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
13 Utility Drive PALM COAST, FL 32135 |
CBC058062 (Exp: 08/31/2020) | (386)445-9393 | (386)446-0403 |
Sub Contractors
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
P. O. Box 1963 Bunnell, FL 32110 |
ER0011613 (Exp: 08/31/2008) | (386) 437-0607 | (386)437-1847 |
RONALD E BANKS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
PO BOX 353741 PALM COAST, FL 32164 |
CAC049308 (Exp: 08/31/2010) | (386) 437-4800 | (386)445-0030 |
JAMES JOSEPH SAVNIK JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
1120 COUNTY RD 305 BUNNELL, 32110 |
CPC057381 (Exp: 09/30/2008) | (386) 445-1253 |
ANTONIO JR AMARAL
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
13 Utility Drive PALM COAST, FL 32137 |
CCC058004 (Exp: 08/31/2018) | (386)445-9393 | (386)446-0403 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 09/05/2007 | FINAL APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| FINAL COMPLETE BUILDING INSPECTION | 09/04/2007 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: NO SEPERATION OF MASTER BATH AND BEDROOM ALL SWITCHES IN MASTER BATH NEED TO BE ON ARC FAULT | |||
| STORMWATER FINAL INSPECTION | 08/28/2007 | APPROVED | DRANDALL |
| Note: THIS IS A REINSPECTION | |||
| STORMWATER FINAL INSPECTION | 08/21/2007 | Disapproved -FEE REQUIRED | DRANDALL |
| Note: place sod in all exposed earth on bank to drainage ditch left side.....seed & straw all exposed earth on rear adj. property.....remove silt fence left property drainage ditch.....remove all trash from left drainage ditch, & rear adj. property.....remove all construction debris from rear adj. property, roof tiles, 1 x s, 2 x s, a/c duct, ect......15 sf road damage $220.00 | |||
| UTILITY COMPANY FINAL | 08/09/2007 | APPROVED | TSCHWEERS |
| RESIDENTIAL EARLY POWER | 07/20/2007 | APPROVED | LHITES |
| DRIVEWAY | 06/28/2007 | APPROVED | DRANDALL |
| INSULATION INSPECTION | 06/05/2007 | APPROVED | CMINI |
| Note: | |||
| INSULATION INSPECTION | 06/04/2007 | Disapproved - NO FEE | CMINI |
| Note: CANCELED BY APPICANT. | |||
| ALL ROUGH | 05/31/2007 | APPROVED | JMCGOWEN |
| Note: | |||
| LATH /BRICK FLASHING | 05/30/2007 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 05/29/2007 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: 1).NEED TO REMOVE SER. CABLE FROM UP AGAINST ROOF SHEATHING WHERE IT ENTERS..2).NEED TO STRAP SER.CABLE EVERY 4-1/2`......3).NEED TO HOLD WIRES 1-1/2" FROM FRAMING MEMBER (FURRING STRIP) IN DINING RM....4).OVER FILL ON SWITCH BOX IN DINING RM....5).NEED TO HAVE SOLID FIREBLOCK AT DROP CEILING IN MASTER SHOWER. | |||
| LATH /BRICK FLASHING | 05/24/2007 | Disapproved -FEE REQUIRED | ACOOPER |
| Note: Need two coats of felt and lath on 2/4 over the side door entrance to the garage. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 05/14/2007 | APPROVED | JMCGOWEN |
| Note: | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 05/11/2007 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: TRUSS T25 MISSING ENGINEERING. NEED STRAPPING AT FRONT DOOR. WALL AT FRIG LOCATION IS NOT COMPLETE. | |||
| LINTEL | 04/24/2007 | APPROVED | RMARVEL |
| Note: | |||
| FOUNDATION SURVEY APPROVED BY STORMWATER | 04/23/2007 | APPROVED | WKINELL |
| MONOLITHIC SLAB INSPECTION/SLAB | 04/17/2007 | APPROVED | RMARVEL |
| Note: | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 04/16/2007 | Disapproved -FEE REQUIRED | RMARVEL |
| Note: NEED PLANS ON JOB. | |||
| FIRST ROUGH PLUMBING INSPECTION | 04/12/2007 | APPROVED | JMCGOWEN |
| Note: |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 03/15/2007 | 03/16/2007 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Auba. | |||
| ZON | COMPLETE | 03/15/2007 | 03/15/2007 |
| Note: Released By: JGONZALEZ | |||
| ZON | HOLD | 03/09/2007 | 03/12/2007 |
| Note: Held By: ECOYNE need to change color of banding on house to white or creme | |||
| SW1 | COMPLETE | 03/14/2007 | |
| Note: Released By: LAPTEKAR Due to 20 ' utility easement please call stormwater when lot is cleared and house is staked. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | ¤40.00 | 11/09/2007 |
| REINSPECTION FEE | ¤40.00 | 11/09/2007 |
| REINSPECTION FEE | ¤40.00 | 11/09/2007 |
| REINSPECTION FEE | ¤40.00 | 11/09/2007 |
| REINSPECTION FEE | ¤40.00 | 11/09/2007 |
| REINSPECTION FEE | ¤40.00 | 11/09/2007 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 11/09/2007 |
| 10/06 TRANS IMPACT FEE/MULTI | ¤3,631.83 | 03/22/2007 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 03/22/2007 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/22/2007 |
| ADMIN FEE | ¤20.00 | 03/22/2007 |
| ARC HOUSE REVIEW | ¤125.00 | 03/22/2007 |
| BUILDING CODE ADMIN FUND | ¤14.55 | 03/22/2007 |
| ELECTRIC FEE | ¤146.40 | 03/22/2007 |
| FIRE IMPACT FEE 4-1-06 | ¤179.37 | 03/22/2007 |
| MECHANICAL FEE | ¤146.40 | 03/22/2007 |
| PERMIT FEE | ¤756.60 | 03/22/2007 |
| PARKS IMPACT FEE 4/1/06 | ¤1,159.02 | 03/22/2007 |
| PLAN CHECK FEE | ¤77.60 | 03/22/2007 |
| PLUMBING FEE | ¤146.40 | 03/22/2007 |
| RADON FEE | ¤14.55 | 03/22/2007 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,372.72 |