I want to search for...
Permit #2007070439
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7016-00040-0160 |
| Block: 00040 |
| Subdivision: 0 - |
| Job Phone: (386)566-1189 |
| Location Address: 18 COMET CT |
| Type: SW - SEAWALL |
| Issue Date: 09/20/2007 |
| NOC: RECORDED |
| Applicant name: CRAIG PECK |
| Owner: WOLFF DAVID |
|
Address 1 OVERLOOK DRIVE HOLMDEL, NJ 07733 |
| Lot: 0160 |
| Contracted Stated Job Value: ¤13,000.00 |
| Job Description: SEAWALL |
| Type: CN |
Contractor
SEAPECK SALES & SERVICE INC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3271 NORTH OLD DIXIE HIGHWAY BUNNELL, FL 32110 |
CRC1329041 (Exp: 08/31/2026) | (386)586-6363 | (386)586-6363 |
Inspection History
| Type | Request Date | Result | Inspector |
| LANDSCAPE FINAL | 02/08/2008 | FINAL APPROVED | JBEAUDET |
| Note: sod is installed | |||
| STORMWATER FINAL INSPECTION | 02/01/2008 | APPROVED | DRANDALL |
| SEA WALL DEADMEN / CAP | 01/30/2008 | APPROVED | CMINI |
| SEA WALL DEADMEN / CAP | 11/15/2007 | APPROVED | JGIBSON |
| TURBIDITY BARRIER | 11/08/2007 | APPROVED | DRANDALL |
| PRE CLEARING INSPECTION | 10/11/2007 | APPROVED | JBEAUDET |
| Note: THIS IS A REINSPECTION 10/11/07 JB TREE BARRICADES ARE INSTALLED LEFT SIDE AND RIGHT SIDE FOR TREE PROTECTION 1-17" SWEET GUM AND 1-14" MAPLE | |||
| PRE CLEARING INSPECTION | 10/10/2007 | Disapproved - NO FEE | JBEAUDET |
| Note: SEAWALL CALLED BY SEAPECK 10/10/07 JB NEED TO INSTALL TREE BARRICADES AROUND 1-17" SWEET GUM LEFT SIDE AND 1-14" MAPLE TREE RIGHT SIDE. |
Review History
| Department | Status | Date In | Date Out |
| PLENV | COMPLETE | 08/14/2007 | 08/17/2007 |
| Note: Released By: ECOYNE Held By: DBEVAN 1. The proposed wing wall at the northwest property corner does not appear to be an adequate configuration with the existing bulkhead on Lot 17 located west of the subject property. Please provide detailed figure(s) of the proposed construction to verify that the proposed seawall will sufficiently adjoin the adjacent property to avoid sedimentary erosion to Colechester Cove. 2. Please provide a vegetation clearing and erosion plan for the proposed activities completed by DBevan/ecoyne | |||
| BLD | COMPLETE | 08/13/2007 | 08/14/2007 |
| Note: Released By: CCOTE Approved for Release. Review by Auba. | |||
| ZON | COMPLETE | 08/13/2007 | 08/13/2007 |
| Note: Released By: JGONZALEZ | |||
| URB | COMPLETE | 08/13/2007 | 08/13/2007 |
| Note: Released By: JBEAUDET JB.a revised site plan was submitted and approved 8/13/07 | |||
| URB | HOLD | 07/24/2007 | 07/25/2007 |
| Note: Held By: JBEAUDET Need accurate site plan showing tree location,caliper size,and type of tree. | |||
| SW1 | COMPLETE | 07/23/2007 | 07/24/2007 |
| Note: Released By: LAPTEKAR | |||
| PLENV | COMPLETE | 09/11/2007 | |
| Note: Released By: DBEVAN |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ARC SEAWALL REVIEW | ¤20.00 | 09/20/2007 |
| PERMIT FEE | ¤78.00 | 09/20/2007 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤98.00 |