I want to search for...
Permit #2007070579
Permit Details
Status: VOID
| Parcel Id: 07-11-31-7004-00160-0130 |
| Block: 00160 |
| Subdivision: - |
| Job Phone: (386)439-1014 |
| Location Address: 95 CORAL REEF CT N |
| Type: BH - BOATHOUSE |
| NOC: RECORDED |
| Applicant name: JOHN D GOBLER |
| Owner: BENNETT JAMES P & LYNDA C H&W |
|
Address 204 MOSS ROCK ROAD MAGGIE VALLEY, NC 28751 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤10,000.00 |
| Job Description: BOATHOUSE & DOCK |
| Type: CN |
Contractor
MARITIME CONSTRUCTION INC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P.O. BOX 2014 FLAGLER BEACH, FL 32136 |
CBC1254215 (Exp: 08/31/2026) | 386-693-4884 | 386-693-4897 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL INSPECTION (MISC) | |||
| STORMWATER FINAL INSPECTION |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 10/30/2007 | 11/01/2007 |
| Note: Released By: FREODICA Reviewd by Auba. | |||
| ZON | COMPLETE | 10/30/2007 | 10/30/2007 |
| Note: Released By: JGONZALEZ | |||
| PLENV | COMPLETE | 09/17/2007 | 09/19/2007 |
| Note: Released By: DBEVAN | |||
| ZON | HOLD | 09/13/2007 | 09/17/2007 |
| Note: Held By: JGONZALEZ permit need to changed to BoatHouse from dock Need color and material sheet showing type of roof being applied and the color of shingle or tile. also need the color of dock if stained or painted. Forwarding file to denise bevins for review jgonzalez | |||
| SW1 | COMPLETE | 09/11/2007 | 09/13/2007 |
| Note: Released By: LAPTEKAR received new plan drawing///main plans on file | |||
| SW1 | HOLD | 09/10/2007 | 09/10/2007 |
| Note: Held By: LAPTEKAR new drawing submitted has roof overhang of 2' waterside...only 1' allowed...emailed | |||
| SW1 | HOLD | 08/10/2007 | 08/15/2007 |
| Note: Held By: LAPTEKAR Received revised site plan 8/10/07 4:50 PM Site plan missing dimension of lot length at the water and separate dimensions of deck and boat house. Construction drawings don't match dimensions of site plan per MB Roof pitch not indicated: 4 1/2 : 12 roof pitch required | |||
| SW1 | HOLD | 07/30/2007 | 08/02/2007 |
| Note: Held By: LAPTEKAR Hold for BG/MB to check/// 8/3/07 A boat house must have the slip parallel to the lot....per BG site plan indicates boat house is perpendicular to the lot line. Roof line 20' into waterway? |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PERMIT FEE | ¤60.00 | |
| STORM WATER PERMIT FEES | ¤50.00 | |
| Fees | Total Due: ¤110.00 | Total Paid: ¤0.00 |