I want to search for...
Permit #2007090271
Permit Details
Status: FINAL
| PATIO/DECK (NO ROOF) : 849 sqft |
| Total Square Footage: 1346 sqft |
| Subdivision: 2070 - Grand Haven North Phase 1 @ Grand Haven |
| Job Phone: (386)447-7857 |
| Location Address: 8 LONG LAKE WAY |
| Type: PO - POOL |
| Issue Date: 10/26/2007 |
| NOC: RECORDED |
| Applicant name: NILS C ERICKSON |
| Owner: MARTINS, SEBASTIAN & MARIE |
|
Address 8 LONG LAKE WAY PALM COAST, FL 32137 |
| Lot: 103 |
| Contracted Stated Job Value: ¤59,943.00 |
| Job Description: POOL |
| Type: CN |
Contractor
ERICKSON CUSTOM POOLS (NILS ERICKSON)
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
PO BOX 749 PALM COAST , FL 32137 |
CPC039933 (Exp: 08/31/2010) | (386)439-5255 | (386)439-1160 |
Sub Contractors
WILLIAM COWHERD
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
P. O. Box 816 New Smyrna Beach, FL 32170 |
EC0003075 (Exp: 08/31/2020) | (386)423-6700 | (386)423-5621 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL - FINAL | 06/11/2008 | FINAL APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| POOL - FINAL | 05/21/2008 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: MISSING POP OFF FOR POOL HEATER AND FYI NEED TO EXSTEND REGULATOR VENT 5` AWAY FROM IGNITION SOURCE CONTACT GAS COMPANY AND NOTIFY.........MARK 931-2912 | |||
| STORMWATER FINAL INSPECTION | 05/19/2008 | APPROVED | DRANDALL |
| Note: THIS IS A REINSPECTION | |||
| STORMWATER FINAL INSPECTION | 05/08/2008 | Disapproved -FEE REQUIRED | DRANDALL |
| Note: 11/19 stop work order posted.....recheck 11/20 11/21 everything ok 5/8/08 remove all dirt & all cut pieces of pavers from left adj, property, see pink paint.....seed & straw all exposed earth on right side adj. property.....sod last 10' near water to stabilize bank, see pink paint.....cut off extra amount of deck drain on left side, sticking out | |||
| UTILITY COMPANY FINAL | 05/06/2008 | APPROVED | TSCHWEERS |
| Note: Gravity ok, no permit to sign. | |||
| ELEC & ALARM | 05/02/2008 | APPROVED | RMARVEL |
| POOL DECK INSPECTION | 01/30/2008 | APPROVED | JGIBSON |
| STEEL & GROUND | 11/16/2007 | APPROVED | DROCKWELL |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 10/17/2007 | 10/23/2007 |
| Note: Released By: FREODICA Reviewed by Auba. | |||
| BLD | HOLD | 10/03/2007 | 10/04/2007 |
| Note: Held By: JJOSEPH All work associated with the installation of gas piping and equipment shall be completed under a separate building permit or added to this permit and shall include the submission of a gas riser diagram indicating pipe sizes, material and lengths as well as gas equipment BTU capacities, tank size and location. | |||
| SW1 | COMPLETE | 10/01/2007 | 10/03/2007 |
| Note: Released By: LAPTEKAR ok per DR site check | |||
| SW1 | HOLD | 09/27/2007 | 09/28/2007 |
| Note: Held By: LAPTEKAR sending DR for a site check of pool proposal | |||
| ZON | COMPLETE | 09/26/2007 | 09/26/2007 |
| Note: Released By: ECOYNE | |||
| ZON | HOLD | 09/17/2007 | 09/19/2007 |
| Note: Held By: BBARTON/training 1. Cabana is not shown on the screen enclosure permit. 2. Please provide full details on the cabana 3. Setbacks on pool survey do not match those on the screen enclosure survey (faxed contractor 09/19/07 @ 3:48 pm) |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 05/23/2008 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 05/13/2008 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/26/2007 |
| ELECTRIC FEE | ¤66.00 | 10/26/2007 |
| PERMIT FEE | ¤360.00 | 10/26/2007 |
| PLAN CHECK FEE | ¤40.00 | 10/26/2007 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤621.00 |