Permit #2007100054

Permit Details

Status: COED

Parcel Id: 06-12-31-5825-00000-0090
COMMERCIAL SQUARE FOOTAGE: 51793 sqft
Total Square Footage: 51793 sqft
Subdivision: 2088 - TOWN CENTER
Job Phone: (386)677-8736
Location Address: 145 CITY PL
Type: BC - BUILDING COMMERCIAL
Issue Date: 06/09/2008
NOC: RECORDED
Applicant name: LEONARD MARINACCO
Owner: CITY CENTRE OF PALM COAST, INC.

Address

4B OLD KINGS RD NORTH

PALM COAST, FL 32137

Lot: 9
Contracted Stated Job Value: ¤4,890,000.00
Job Description: CITY CENTRE AT TOWN CENTER- - BUILDING 1 - 3 STORY RETAIL/ OFFICE - - SP-MOD-06-08
Type: CN

Contractor

BOMAR CONSTRUCTION INC
Status Location Address State License Number Phone Fax
INACTIVE

27 S ORCHARD STREET

ORMOND BEACH, FL 32174

CGC015648 (Exp: 08/31/2022) (386)677-8736 (386)677-7726

Sub Contractors

DONALD G MEYER
Status Location Address State License Number Phone
CANCEL

P. O. Drawer 730008

Ormond Beach, FL 32174

CAC039739 (Exp: 08/31/2016) (386) 253-7774
ISAAC WALTER JOHNSTON
Status Location Address State License Number Phone
ACTIVE

887 BRENTWOOD DRIVE

Daytona Beach, FL 32117

CFC023634 (Exp: 08/31/2026) (386) 252-7047
NEIL ARNOLD SAMUELS
Status Location Address State License Number Phone
INACTIVE

500 CARSWELL AVENUE

HOLLY HILL, FL 32117

CCC011650 (Exp: 08/31/2024) (386)253-7627
MATTHEW JOHN WITTWER
Status Location Address State License Number Phone Fax
ACTIVE

231 JEAN STREET

DAYTONA BEACH, FL 32114

EC0002058 (Exp: 08/31/2026) (386)255-1418 (386)255-3429

Inspection History

Type Request Date Result Inspector
UTILITY COMMERCIAL FINAL 10/20/2009 APPROVED DSPENCER
Note: THIS IS A REINSPECTION
ENGINEERING FINAL 10/15/2009 FINAL APPROVED LFITZGERALD
FINAL COMPLETE BUILDING INSPECTION 10/15/2009 APPROVED CMINI
ELEVATOR CERTIFICATION INSPECTION 10/15/2009 APPROVED BBEMBRY
TRAFFIC ENGINEER 10/14/2009 APPROVED LFITZGERALD
UTILITY COMPANY FINAL 10/14/2009 APPROVED DSPENCER
UTILITY COMMERCIAL FINAL 10/12/2009 Disapproved - NO FEE DSPENCER
Note: All conditions of utility developement agreement have not been met. the DEP for wastewater have not been recieved.THIS IS A REINSPECTION
H.V.A.C. FINAL 10/07/2009 APPROVED JHINDMAN
FIRE FINAL 10/02/2009 APPROVED JPATTEE
UTILITY COMMERCIAL FINAL 09/30/2009 Disapproved - NO FEE DSPENCER
Note: all conditions of utility developement order have not been met and a substantial and final inspection nave not been done or scheduled
LANDSCAPE FINAL 09/29/2009 APPROVED WBUTLER
ELECTRICAL FINAL 09/29/2009 APPROVED RMARVEL
Note: THIS IS A REINSPECTION
ELECTRICAL FINAL 09/22/2009 Disapproved -FEE REQUIRED CMINI
Note: Inspection Resulted at 9/22/2009 12:24:39 PM NEED REVISION FOR DELETED LIGHTING ON FRONT OF BUILDING.......ALSO FOR ADDED LIGHTS IN BATHROOMS....NEED TO ADD RECEPTACLE OR DELETE OFF PLAN IN STAIRWELL.....NEED TO CHANGE RECEPTACLE IN MECHANICAL RM TO MATCH PLAN,GFCI.PANEL SHOWING SPARE WHERE BREAKER FOR FIRE IN PLACE.
H.V.A.C. FINAL 09/03/2009 APPROVED JHINDMAN
PLUMBING FINAL 09/01/2009 APPROVED JHINDMAN
ABOVE CEILING 08/24/2009 APPROVED RMARVEL
Note: Inspection Resulted at 8/24/2009 3:03:36 PM ELECTRIC SHELL PORTION ONLY.
ABOVE CEILING 08/24/2009 APPROVED - AS NOTED JHINDMAN
Note: THIS IS A REINSPECTION mechanical ok
ABOVE CEILING 08/21/2009 Disapproved -FEE REQUIRED RMARVEL
Note: Inspection Resulted at 8/21/2009 2:53:25 PM NEED TO SCREW LIGHTS TO CEILING GRID. MC NEEDS TO BE INDEPENDANTLY FROM CEILING GRID SUPPORT CABLES.
UNDERGROUND ELECTRICAL 08/20/2009 APPROVED RMARVEL
UNDERGROUND ELECTRICAL 07/16/2009 APPROVED RMARVEL
FIREWALL INSPECTION 07/01/2009 APPROVED JPATTEE
COMMERCIAL POWER INSPECTION 06/18/2009 APPROVED RMARVEL
Note: THIS IS A REINSPECTION
INSULATION INSPECTION 06/15/2009 CANCELLED BY APPLICANT CMINI
Note: THIS IS A REINSPECTION
FOOTER 06/03/2009 APPROVED CMINI
Note: THIS IS A REINSPECTION
RETAINING WALL FOUNDATION INSPECTION 06/02/2009 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 6/2/2009 1:25:02 PM PLANTER WALL FOOTERS PER REVISION.
COMMERCIAL POWER INSPECTION 06/02/2009 PARTIALLY APPROVED RMARVEL
Note: THIS IS A REINSPECTION Inspection Resulted at 6/2/2009 3:35:46 PM STILL NEED TO CHECK TORQUE ON MAIN FEEDER LUGS.
COMMERCIAL POWER INSPECTION 05/28/2009 Disapproved -FEE REQUIRED RMARVEL
Note: Inspection Resulted at 5/28/2009 2:03:25 PM NEED REVISION SHOWING CHANGES TO ELECTRICAL SYSTEM. NEED TO STILL CHECK TORQUE ON CONDUCTORS COMING FROM TRANSFORMER.
RETAINING WALL FOUNDATION INSPECTION 05/07/2009 Disapproved -FEE REQUIRED CMINI
Note: Inspection Resulted at 5/7/2009 2:16:18 PM NEED TO HAVE APPROVED PLANS FOR FOOTER INSPECTION.
FIREWALL INSPECTION 05/05/2009 APPROVED JPATTEE
Note: THIS IS A REINSPECTION 3rd floor
INSULATION INSPECTION 04/29/2009 PARTIALLY APPROVED DROCKWELL
Note: THIS IS A REINSPECTION Inspection Resulted at 4/29/2009 2:40:36 PM AREA``S MARKED AND DATED...DR
2ND ROUGH ELECTRICAL 04/24/2009 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 4/24/2009 2:59:19 PM 3RD FL CEILING AND WALLS IN LOBBY AND BATH ROOM WALLS....3RD FL STAIRWELLS.HIGHLIGHTED ON PLAN.
FRAMING 04/24/2009 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION ...METAL STUD FRAMING ON SEPARATION WALLS ON 1ST FL.FLCEILING FRAMING ON 3RD FL. LOBBY CEILING SOFFIT FRAMING AND STAIRWELL CEILING AND WALLS.SHOULD BE ALL OF THE FRAMING COMPLETE ON SHELL PERMIT.
H.V.A.C. ROUGH 03/31/2009 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
UNDERGROUND ELECTRICAL 03/27/2009 APPROVED RMARVEL
Note: THIS IS A REINSPECTION Rick from Bomar called for this inspection
H.V.A.C. ROUGH 03/23/2009 PARTIALLY APPROVED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Resulted at 3/23/2009 3:23:43 PM 3RD FLOOR ROUGH OK EXCEPT FOR JANITOR CLOSET. REVISION NEEDED.
FIREWALL INSPECTION 03/23/2009 APPROVED JPATTEE
Note: Not ready for inspection
2ND ROUGH ELECTRICAL 03/19/2009 PARTIALLY APPROVED RMARVEL
Note: THIS IS A REINSPECTION Inspection Resulted at 3/19/2009 1:32:28 PM 1ST FLOOR OUTER WALLS AND LOBBY.
INSULATION INSPECTION 03/19/2009 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/19/2009 3:23:06 PM 1ST FL. EXTERIOR WALLS AND FIRE WALL.
FIREWALL FRAMING (DUPLEX) 03/19/2009 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/19/2009 3:23:07 PM FIRE WALL STUDS.
FRAMING 03/19/2009 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/19/2009 3:23:06 PM CIELING FRAMING 1ST FL.....SOFFIT CEILING FRAMING AT STAIRWELLS 1ST AND 2ND FL HIGHLIGHTED ON PLAN.
H.V.A.C. ROUGH 03/18/2009 PARTIALLY APPROVED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Resulted at 3/18/2009 3:23:18 PM 1RST FLOR LOBBY, ELEVATOR LOBBY ROUGH OK, AND 3RD FLOOR ELEVATOR LOBBY OK TO WRAP
FIREWALL INSPECTION 03/17/2009 APPROVED JPATTEE
FRAMING 03/13/2009 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/13/2009 2:30:06 PM INTERIOR FRAMING ON METAL STUD WALLS HIGHLIGHTED ON PLANS
FRAMING 03/10/2009 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/10/2009 2:40:35 PM CEILING FRAMING 2ND FL. LOBBY AREA AND INSULATION IN BATHS 2ND FL.
STOREFRONT 03/10/2009 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/10/2009 2:40:34 PM 1ST FL COMPLETE.
2ND ROUGH ELECTRICAL 03/09/2009 PARTIALLY APPROVED RMARVEL
Note: THIS IS A REINSPECTION Inspection Resulted at 3/9/2009 2:53:38 PM 2ND FLOOR LOBBY WALLS AND CEILING. STAIRWAY WALLS 1-3
H.V.A.C. ROUGH 03/09/2009 PARTIALLY APPROVED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Resulted at 3/9/2009 3:37:06 PM 2ND FLOOR BATHROOMS ELEVATOR LOBBY AND LOBBY DUCTS OK.
STOREFRONT 03/06/2009 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 3/6/2009 2:54:29 PM STOREFRONTSCREW PATTERN ON 2ND AND 3RD FLS.HIGHLIGHTED ON PLANS.
H.V.A.C. ROUGH 03/02/2009 PARTIALLY APPROVED JHINDMAN
Note: Inspection Resulted at 3/2/2009 3:57:39 PM 2ND FLOOR. BATHROOM EXHAUST DUCT IN CHASE OK TO WRAP. AND 8" ROUND DUCT ABOVE ELEVATOR LOBBY IS OK TO WRAP.
STOREFRONT 02/27/2009 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 2/27/2009 3:39:59 PM SCREW PATTERN ON WINDOWS 1-3 FLOORS.
INSULATION INSPECTION 02/27/2009 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 2/27/2009 3:40:00 PM 2ND FL WALLS HIGHLIGHTED PART ON PLAN.
SECOND ROUGH PLUMBING INSPECTION 02/25/2009 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
EXTERIOR WALL SHEATHING/SHEAR WALL 02/24/2009 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 2/24/2009 2:51:46 PM DENSGLAS SCREW PATTERN HIGHLIGHTED ON PLAN.
SECOND ROUGH PLUMBING INSPECTION 02/20/2009 Disapproved -FEE REQUIRED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Resulted at 2/20/2009 3:22:52 PM RISER CLAMPS AND FIRE COLLARS MISSING
TEMPORARY POLE 02/18/2009 APPROVED RMARVEL
Note: THIS IS A REINSPECTION Inspection Resulted at 2/18/2009 2:46:36 PM INSTALLED CONCRETE WHERE NCOULD NOT OBTAIN 18IN OF BURIAL DEPTH
2ND ROUGH ELECTRICAL 02/17/2009 PARTIALLY APPROVED RMARVEL
Note: THIS IS A REINSPECTION Inspection Resulted at 2/17/2009 2:37:15 PM 2ND FLOOR. HIGHLIGHTED ON PLANS DOES NOT INCLUDE LOBBY AREA.
STOREFRONT 02/17/2009 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 2/17/2009 3:19:33 PM PARTIAL STORE FRONTS 1-3RD FLS.
FRAMING 02/17/2009 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 2/17/2009 3:19:33 PM 2ND FL INTERIOR FRAMING ON SHELL PERMIT.
EXTERIOR WALL SHEATHING/SHEAR WALL 02/17/2009 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 2/17/2009 3:19:34 PM DENGLAS FOR THREE FLOORS HIGHLIGHTED THIS DATE ON PLAN.
SECOND ROUGH PLUMBING INSPECTION 02/10/2009 Disapproved -FEE REQUIRED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Resulted at 2/10/2009 3:14:45 PM STACKS DO NOT MATCH PLUMBING RISER FOR STUB OUTS. PLANS DO NOT MATCH TUBS ON 1ST AND 3RD FLOOR. 2ND FLOOR BATHROOM GROUP MISSING 2" VENT STACK. STRAP ALL VETICAL PIPING TO COLUMNS. SANITARY TEST IS OK PROVIDED PLANS WILL BE CHANGED TO MATCH. NEED TO RECHECK SUPPLY PRESSURE TEST.
FRAMING 02/09/2009 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 2/9/2009 3:11:31 PM METAL STUD FRAMING ON EXTERIOR WALL HIGHLIGHTED ON PLAN 1-3 FLOORS...LAST PART OF FRAMING ON EXTERIOR.
ROOF IN PROGRESS 02/09/2009 APPROVED CMINI
EXTERIOR WALL SHEATHING/SHEAR WALL 02/05/2009 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 2/5/2009 3:02:45 PM EASTSIDE NORTH CORNER DENSGLAS SCREWS HIGHLIGHTED ON PLAN.
STOREFRONT 02/04/2009 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 2/4/2009 1:48:36 PM 1ST THRU 3RD FL. HIGHLIGHTED ON PLAMNS
TEMPORARY POLE 02/04/2009 Disapproved -FEE REQUIRED RMARVEL
Note: Inspection Resulted at 2/4/2009 1:45:47 PM PVC NEEDS TO BE 18IN DEEP OR ONE THE THE NOTES FROM TABLE 300.5 APPLIED.
FIREWALL FRAMING (DUPLEX) 01/30/2009 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 1/30/2009 11:34:11 AM INTERIOR FRAMING FIRE WALLS HIGHLLIGHTED ON PLAN. FOR 3 FLOORS.
FRAMING 01/30/2009 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 1/30/2009 11:34:10 AM EXTERIOR METAL STUDS FOR 3FLOORS HIGHLIGHTED ON PLAN
EXTERIOR WALL SHEATHING/SHEAR WALL 01/28/2009 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 1/28/2009 3:12:01 PM DENSGLAS 3 FLOORS HIGHLIGHTED ON PLAN
FRAMING 01/26/2009 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 1/26/2009 2:25:02 PM METAL STUD FRAMING NORTH END HIGHLIGHTE ON BUILDING.
ROOF IN PROGRESS 01/26/2009 APPROVED CMINI
FRAMING 01/22/2009 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 1/22/2009 3:36:12 PM FRAMING AT FRONT ENTRANCE...WATCH TOWER SHEATHING AND WINDOW BUCKS.
STOREFRONT 01/20/2009 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 1/20/2009 3:00:29 PM COLUMN LINES 4 THRU 7 1ST,2ND,3RD FLOORS.
2ND ROUGH ELECTRICAL 01/16/2009 PARTIALLY APPROVED RMARVEL
Note: THIS IS A REINSPECTION
EXTERIOR WALL SHEATHING/SHEAR WALL 01/15/2009 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 1/15/2009 3:04:43 PM DENGLAS WEST SIDEHIGHLIGHTED ON PLANS.
FRAMING 01/15/2009 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 1/15/2009 3:04:43 PM CLOCK TOWER ROOF FRAMING AND STEEL PINING....ROOF SHEATHING SCREW DOWN...METAL STUD WALLS UP TO TOP OF CLOCK TOWER ..HIGHLIGHTED ON PLAN.
EXTERIOR WALL SHEATHING/SHEAR WALL 01/09/2009 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 1/9/2009 3:31:56 PM HIGHLIGHTED ON PLAN.
STOREFRONT 01/09/2009 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 1/9/2009 3:31:55 PM SCREWING ON WINDOWS.
FRAMING 01/06/2009 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 1/6/2009 3:01:27 PM METAL STUD FRAMING HIGHLITED ON PLAN.
EXTERIOR WALL SHEATHING/SHEAR WALL 12/31/2008 PARTIALLY APPROVED RMARVEL
Note: Inspection Resulted at 12/31/2008 2:14:48 PM HIGHLIGHTED ON PLANS
SECOND ROUGH PLUMBING INSPECTION 12/30/2008 PARTIALLY APPROVED JMCGOWEN
Note: TURN INTO FIRST ROUGH. SOUTH HALF FIRST ROUGH IS SATISFACTORY. roof rain leader and drains only
2ND ROUGH ELECTRICAL 12/23/2008 PARTIALLY APPROVED RMARVEL
Note: Inspection Resulted at 12/23/2008 3:13:10 PM 4 COLUMNS AND CANOPY AT SOUTH END
FRAMING 12/22/2008 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 12/22/2008 3:29:22 PM WEST SIDE WALLS COLUMN LINE 4 THRU 7 METAL STUD...COLUMN FRAMING AND ROOF WALL FRAMING HIGHLIGHED ON PLAN....STILL WAITING FOR WINDOW BUCK DETAIL AND SHOP DRAWINGS TO BE APPROVED BY CITY....
FRAMING 12/15/2008 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 12/15/2008 1:47:52 PM SCREW PATTEREN FOR DENSGLAS COLUMN LINE 1-4.
FRAMING 12/10/2008 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 12/10/2008 12:01:23 PM COLUMN LINE 1-4 ON ARCHITECTUALS....HAVE STRUCTRUALS APPROVED AND WINDOW BUCK DETAIL BY NEXT INSPETION.
SECOND FLOOR SLAB INSPECTION 11/20/2008 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 11/20/2008 3:19:06 PM REMAINDER OF 3RD FL. SLAB STEEL AND WIRE MESH.
FOOTER 11/18/2008 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 11/18/2008 2:59:07 PM UPPER PIER FOOTER STEEL,HIGHLIGHTED ON PLAN.
SECOND FLOOR SLAB INSPECTION 11/12/2008 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 11/12/2008 3:35:14 PM REMAINDER OF SLAB STEEL ON SECOND FLOOR.
SECOND FLOOR SLAB INSPECTION 11/06/2008 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 11/6/2008 3:30:58 PM PARTIAL SLAB INSPECTION ON 2ND AND 3RD FL. FROM COLUMN LINE 1 THRU 7...USING KEY WAY TO CONNECT PARTIAL SLABS....... ALSO COLUMN PIER FOOTERS HIGHLIGHTED IN PURPLE ON PLAN.
FIRST ROUGH PLUMBING INSPECTION 09/22/2008 CANCELLED BY APPLICANT JMCGOWEN
MONOLITHIC SLAB INSPECTION/SLAB 09/08/2008 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
UNDERGROUND ELECTRICAL 09/03/2008 PARTIALLY APPROVED RMARVEL
Note: Inspection Resulted at 9/3/2008 3:49:59 PM UNDER SLAB
MONOLITHIC SLAB INSPECTION/SLAB 08/29/2008 PARTIALLY APPROVED CMINI
Note: Inspection Resulted at 8/29/2008 3:32:47 PM SOUTH END SLA FIRST FLOOR,HIGHLIGHTED ON PLAN.
FIRST ROUGH PLUMBING INSPECTION 08/28/2008 APPROVED PGALLMANN
Note: Inspection Resulted at 8/28/2008 3:00:39 PM NORTH SIDE / SECOND AND FINAL UNDERGROUND INSPECTION.
FOOTER 08/14/2008 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION Inspection Resulted at 8/14/2008 12:40:39 PM FOOTERS HIGHLGHTED ON PLAN.
UNDERGROUND ELECTRICAL 08/14/2008 APPROVED RMARVEL
Note: Inspection Resulted at 8/14/2008 3:27:34 PM UNDER SLAB ELECTRIC.
FIRST ROUGH PLUMBING INSPECTION 08/13/2008 APPROVED PGALLMANN
Note: SOUTH HALF FIRST ROUGH IS SATISFACTORY. NEXT INSPECTION: BUILDER MUST PROVIDE PIPE SPECIFICATIONS FOR BELOW AND ABOVE GROUND DOMESTIC WATER, WASTE AND VENTS.
FIRST ROUGH PLUMBING INSPECTION 08/12/2008 Disapproved -FEE REQUIRED PGALLMANN
Note: CONTINIOUS FENCE AROUND SITE LOCKED-UP AT 3:15.
FOOTER 08/12/2008 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION FOOTERS HIGHLIGHTED ON PLAN THIS DATE.
FOOTER 08/06/2008 PARTIALLY APPROVED CMINI
Note: FOOTERS HIGHLIGHTED ON PLANS THIS DATE.
FOOTER 08/05/2008 FINAL APPROVED DROCKWELL
Note: THIS IS A REINSPECTION FOOTINGS MARKED AND DATED ON PLANS...DR
FOOTER 08/04/2008 PARTIALLY APPROVED DROCKWELL
Note: THIS IS A REINSPECTION FOOTINGS MARKED AND DATED 8/4......DR
FOOTER 07/31/2008 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION PARTIAL FOOTERS HIGHLIGHTED THIS DATE ON PLAN.
FOOTER 07/29/2008 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION FOOTERS HIGHLIGHTED THIS DAY ON PLAN...
FOOTER 07/24/2008 PARTIALLY APPROVED CMINI
Note: THIS IS A REINSPECTION FOOTERS HIGHLIGHTED AND DATED ON PLAN.
FOOTER 07/23/2008 PARTIALLY APPROVED DROCKWELL
Note: FOOTER PADS MARKED IN GREEN HI-LIGHTER AND DATED 7/23 O.K TO POUR
TEMPORARY POLE 06/25/2008 APPROVED RMARVEL
Note: requested by contractor CARTER

Review History

Department Status Date In Date Out
ELEC COMPLETE 09/28/2009 09/28/2009
Note: Released By: SKNOPF Revision Electrical revision showing As-Built conditions as requested by inspector. Approved for Release. Revision: Deleted 2- S2 exterior sconces on entrance columns Added F2 fixture in each bathroom 2nd, 3rd floors Deleted 3rd floor phone board receptacle Deleted build out of room to be under tenant design scope Added receptacle 1st floor electrical/meter room Swapped locations of AHU-1 and EWH on 1st floor Added (4) P2 fixtures circuit HP-53 to site plan.
BLD COMPLETE 09/18/2009 09/18/2009
Note: Released By: JMCGOWEN correction to revision per Joe Mcgowern rnd floor riser correcions.
ELEC COMPLETE 09/16/2009 09/18/2009
Note: Released By: JMCGOWEN Electrical revisions
ZON HOLD 08/11/2009 08/12/2009
Note: Held By: ECOYNE provide 3' wide x 12' long planter at site monument sign provide setback (linear feet) of planter from property line faxed 08/12/09 12:00pm
ELEC COMPLETE 06/16/2009 06/16/2009
Note: Released By: JMCGOWEN revision: revised panel feeder wire change
ELEC HOLD 06/12/2009 06/12/2009
Note: Held By: SKNOPF Panel feeder wire change CITY OF PALM COAST BUILDING DIVISION Comments on Revision to #2007100054 (City Center @ 145 City Place) 6/12/2009 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments Sheet E1.1: 1. Please coordinate new feeder sizes shown in Power Riser Diagram with SWBD 'MSB' schedule. 2. Provide updated 'MSB' and 'Overall Building Electrical Service Calculation' reflecting revised Suite 300 and Suite 301 demand loads. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us
BLD COMPLETE 05/19/2009 05/19/2009
Note: Released By: JMCGOWEN Footing details for planter & site walls per bldg. inspector request
ZON COMPLETE 05/15/2009 05/18/2009
Note: Released By: ECOYNE Foundation details for planter walls - no removals or structural changes per John /Bomar 05/19/09 10:20am
MECH COMPLETE 03/26/2009 03/26/2009
Note: Released By: FREODICA Revision: Field ductwork modifications as requested by inspector
ELEC COMPLETE 02/18/2009 02/19/2009
Note: Released By: JMCGOWEN electrical service & clear changes to shell
MECH COMPLETE 02/18/2009 02/18/2009
Note: Released By: FREODICA Revision: Mechanical shell building changes: 1. Deleted AHU-4/PH-4 on Heat Pump Split System DX Air Conditioning Unit Schedule (Sheet M0.1,Rev. 1, 1-21-09) 2. Deleted ductwork/AHU-4 at third floor corridor ( Sheet M1.3, Rev. 3, 1-21-09) 3. Deleted HP-4 designation on roof plan ( Sheet M1.4, Rev. 1, 1-21-09)
PLUM COMPLETE 02/18/2009 02/18/2009
Note: Released By: FREODICA Revision: 1. Floor plan revision for third floor mop sink and riser diagram. Ref. sheet p2.1 rev.3 & sheet p3.1 rev.1. (Sketch Nos. 1&2).
BLD HOLD 12/30/2008 12/30/2008
Note: Held By: JMCGOWEN revision = stud framing plan provide two stamped copies of revised plans
BLD COMPLETE 12/30/2008 12/30/2008
Note: Released By: JMCGOWEN door and window buck fastening schedule
BLD COMPLETE 07/30/2008 07/30/2008
Note: Released By: FREODICA Revision: Added pier at elevator pit to raise columns.
BLD COMPLETE 11/15/2007 11/20/2007
Note: Released By: LWOODROME
BLD HOLD 10/19/2007 10/25/2007
Note: Held By: LWOODROME PLAN REVIEW COMMENTS: " Revise design code criteria, on the cover sheet and on sheet S0.0 to 2004 Florida Building Code with 2007 revisions. Provide redesign of structure as needed to comply with the latest code edition. FYI: Buildings must be designed as enclosed, and buildings with in a 120 MPH Wind Borne Debris Region, which this building is, must have either impact resistant glass or the openings must be protected by impact resistant covering(s). " Revise Specifications, on sheet S0.1, section 03200, 1.03 (C) from FBC 2002 to FBC 2004 with revisions, on sheet S0.1, section 03300, 1.03 (A) from South Florida Building Code 2002 to FBC 2004 with revisions and on sheet S0.2, section 05120, 1.04(A) from FBC 2002 to FBC 2004 with revisions. " FBC, Table 503, allows a maximum of 12,500 square feet per story, for Group M, type IIB construction. Since Group M would be the most stringent category, in this building of nonseparated uses (Group M and B) as defined in FBC section 302.3.1, the more stringent requirements shall apply to the entire building. Provide area increase calculations, which would allow for exceeding, the 12,500 square feet per story limitation established by Table 503. " Doors marked 201, 204, 309 and 314 as well as any other doors, which serve openings in rated assemblies, must have labeled door frames and doors with appropriate hardware. " Specify door hardware, which complies with FBC section 11-4.13.9 for H.C. accessibility. " Provide an area of rescue assistance, at each stairwell, on the second and third floors, per FBC section 11-4.3.11. " Provide two way communication, for each area of rescue assistance, per FBC 11-4.3.11.4 " Identify each area of rescue assistance per FBC section 11-4.3.11.5. " Revise the location of the roof hatch, which is not permitted in the stairwell shaft, per FBC section 707.7.1. " Clarify; detail 4/A8.2 indicates that wall type to be non-rated, yet it shows a 1" fire-shield shaft liner XP on one side and that type wall (#4) is indicated as part of the elevator shaft enclosure, which is required to be rated construction. " Provide the UL listing number for wall type #4 and installation detail(s) for walls, marked type #1(UL# U465) and #4. " Provide detail(s) of the interior stair shaft walls, including the enclosure at the top of the shaft. " Provide detail(s) of the elevator shaft walls, where type #1 walls intersect with type #4 walls. " Provide detail of method of enclosing the top of the elevator shaft. " Provide detail(s) of shaft (chase) enclosure for exhaust ducts and condensate lines through the second and third floors. " Provide a ceiling assembly of 1 hour rated construction, in the third floor lobby, at the clock tower. " Provide fire stopping, in stud walls, at floor level(s), where floor slabs intersect with exterior framed walls. " Provide detail(s) of headers and header supports where door and window openings are located in exterior framed walls. " Specify materials for sanitary drainage systems, roof drain leaders and domestic water supply systems. " Provide installation detail(s) for the tank type water heater, include necessary safety equipment such as thermal expansion tank, temperature and pressure relief valve and auxiliary pan. " Provide smoke detectors in the duct work for automatic shut down of the system for air handlers with a design capacity of 2000 CFM or greater. " Exit corridors on the second and third floors can not be used as return air plenums. " Transfer air grills marked B-14X6, shown above the door(s) in the second floor lobby, can not be installed in those rated wall assemblies. " Provide exit signs in first floor units. " Provide emergency egress illumination for all units and areas. " Provide electrical disconnects for air handlers, condensing units and water heaters. " Provide additional WPGFCI receptacle outlets, on the roof, so that no piece of equipment is more than 25' from a receptacle outlet. Larry Woodrome, CBO Building Official 386-986-3786
FI1 HOLD 10/03/2007 11/06/2007
Note: Held By: JPATTEE 1) sheet A2.2 all doors swing into corridor 29a. 2) sheet A.9.3 does not indicate 1hr rated walls except in one short area in the south lobby. 3) sheet E1.0 detail 4, horn stobe shall not be "painted to match wall" unless applied by manufacturer. 4) third floor stair #37 does not indicate emergency lighting. 5) third floor room #33 does not indicate emergency lighting.
FI1 HOLD 11/21/2007
Note: Held By: JPATTEE 1) Provide note(s) indicating intentions for hall doors.OK JDP 2) Emergency lighting is exempted from requirments for automatic shut off/ motion sensors. OK JDP 3) sheet E1.0 still indicates horn strobe covers will be painted !! OK JDP
FI1 COMPLETE 01/04/2008
Note: Released By: JPATTEE

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 10/16/2009
REINSPECTION FEE ¤40.00 10/16/2009
REINSPECTION FEE ¤40.00 10/16/2009
REINSPECTION FEE ¤40.00 10/16/2009
REINSPECTION FEE ¤40.00 10/16/2009
REINSPECTION FEE ¤40.00 10/16/2009
REINSPECTION FEE ¤40.00 10/16/2009
REINSPECTION FEE ¤40.00 10/16/2009
REVISION ¤40.00 10/16/2009
REVISION ¤80.00 10/16/2009
REVISION ¤60.00 10/16/2009
REVISION ¤40.00 10/16/2009
REVISION ¤40.00 10/16/2009
REVISION ¤40.00 10/16/2009
REVISION ¤40.00 10/16/2009
REVISION ¤40.00 10/16/2009
REVISION ¤40.00 10/16/2009
FIRE COMMERCIAL IMPACT FEE ¤1,328.49 10/16/2009
ADDITIONAL FEE ¤80.00 10/16/2009
TRANSPORTATION IMPACT FEE ¤121,961.42 10/16/2009
ADMIN FEE ¤20.00 06/09/2008
BUILDING CODE ADMIN FUND ¤258.97 06/09/2008
ELECTRIC FEE ¤2,964.00 06/09/2008
FIRE COMMERCIAL IMPACT FEE ¤1,328.49 06/09/2008
FIRE PLANS REVIEW ¤517.93 06/09/2008
MECHANICAL FEE ¤2,964.00 06/09/2008
PERMIT FEE ¤26,895.00 06/09/2008
PLAN CHECK FEE ¤5,623.50 06/09/2008
PLUMBING FEE ¤2,964.00 06/09/2008
RADON FEE ¤258.97 06/09/2008
TRANSPORTATION IMPACT FEE ¤121,961.42 06/09/2008
Fees Total Due: ¤0.00 Total Paid: ¤289,866.19