I want to search for...

Permit #2007110218

Permit Details

Status: COED

Parcel Id: 06-12-31-5815-00000-0050
COMMERCIAL SQUARE FOOTAGE: 4995 sqft
Total Square Footage: 4995 sqft
Block: 00000
Subdivision: 2088 - TOWN CENTER
Job Phone: (386)677-8736
Location Address: 746 BELLE TERRE PKWY
Type: BC - BUILDING COMMERCIAL
Issue Date: 01/25/2008
NOC: RECORDED
Applicant name: LEONARD MARINACCO
Owner: NATIONAL CITY BANK

Address

4105 9TH ST SW

VERO BEACH, FL 32968

Lot: 0050
Contracted Stated Job Value: ¤800,000.00
Job Description: NATIONAL CITY BANK TOWN CENTER- SP-MIN-07-01
Type: CN

Contractor

BOMAR CONSTRUCTION INC
Status Location Address State License Number Phone Fax
INACTIVE

27 S ORCHARD STREET

ORMOND BEACH, FL 32174

CGC015648 (Exp: 08/31/2022) (386)677-8736 (386)677-7726

Sub Contractors

BRADLEY S GILES
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 214176

S. DAYTONA, FL 32119

EC0001538 (Exp: 08/31/2026) (386) 767-5895 (386)767-6260
DONALD G MEYER
Status Location Address State License Number Phone
CANCEL

P. O. Drawer 730008

Ormond Beach, FL 32174

CAC039739 (Exp: 08/31/2016) (386) 253-7774
ISAAC WALTER JOHNSTON
Status Location Address State License Number Phone
ACTIVE

887 BRENTWOOD DRIVE

Daytona Beach, FL 32117

CFC023634 (Exp: 08/31/2026) (386) 252-7047
STUART A LYONS
Status Location Address State License Number Phone Fax
INACTIVE

2393 Bellevue Ave. Ext.

DAYTONA BEACH, FL 32114

CCC032500 (Exp: 08/31/2024) (386) 257-1007 (386)257-9040

Inspection History

Type Request Date Result Inspector
FINAL COMPLETE BUILDING INSPECTION 05/29/2008 FINAL APPROVED JHINDMAN
Note: requested by contractor
ENGINEERING FINAL 05/28/2008 APPROVED LFITZGERALD
TRAFFIC ENGINEER 05/28/2008 APPROVED LFITZGERALD
UTILITY COMMERCIAL FINAL 05/27/2008 APPROVED DSPENCER
UTILITY COMPANY FINAL 05/27/2008 APPROVED DSPENCER
LANDSCAPE FINAL 05/23/2008 APPROVED WBUTLER
PLUMBING FINAL 05/23/2008 APPROVED JGIBSON
Note: THIS IS A REINSPECTION
ELECTRICAL FINAL 05/22/2008 APPROVED RMARVEL
H.V.A.C. FINAL 05/20/2008 APPROVED JLEVRAULT
FIRE FINAL 05/20/2008 APPROVED JPATTEE
PLUMBING FINAL 05/20/2008 Disapproved -FEE REQUIRED JGIBSON
Note: MISSING 2 WALL C/O IN MENS RESTROOM ADD TOILETS NOT TO CODE WATER HEATER IS LEAKING @ T& P VALVE MAKE CORRECTIONS AND CALL BACK FOR INSPECTION.MARK 931-2912
COMMERCIAL POWER INSPECTION 05/12/2008 APPROVED RMARVEL
Note: GILES
FIREWALL INSPECTION 05/07/2008 APPROVED JPATTEE
ABOVE CEILING 05/07/2008 APPROVED JLEVRAULT
H.V.A.C. ROUGH 05/07/2008 APPROVED JLEVRAULT
Note: THIS IS A REINSPECTION
FRAMING 04/23/2008 APPROVED - AS NOTED JLEVRAULT
Note: THIS IS A REINSPECTION requested by contractor DRIVE THRU CEILING FRAMING.
FRAMING 04/22/2008 CANCELLED BY APPLICANT JLEVRAULT
Note: per request of contractor
H.V.A.C. ROUGH 04/10/2008 PARTIALLY APPROVED JLEVRAULT
Note: THIS IS A REINSPECTION requested by contractor ALL DUCTWORK EXCEPT FOR MECHANICAL ROOMS.
INSULATION INSPECTION 04/10/2008 APPROVED JLEVRAULT
Note: THIS IS A REINSPECTION requested by contractor
ROOF IN PROGRESS 04/07/2008 APPROVED RMARVEL
2ND ROUGH ELECTRICAL 04/07/2008 APPROVED RMARVEL
LATH /BRICK FLASHING 04/07/2008 APPROVED RMARVEL
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 03/31/2008 APPROVED JLEVRAULT
Note: THIS IS A REINSPECTION
2ND ROUGH ELECTRICAL 03/31/2008 APPROVED LHITES
Note: THIS IS A REINSPECTION OUTSIDE SOFFIT CANS MAIN BUILDING
2ND ROUGH ELECTRICAL 03/28/2008 PARTIALLY APPROVED RMARVEL
Note: THIS IS A REINSPECTION SEPERATION OF WATER COOLER POWER FROM BATHROOM. STRAPPING OF MC ABOVE THE PANEL.
INSULATION INSPECTION 03/28/2008 Disapproved -FEE REQUIRED JLEVRAULT
Note: PROVIDE A REVISION SHOWING NEW WALL SECTION WITH METAL STUDS AND INSULATION IN LIEU OF CORE FILLED BLOCK INSULATION.
H.V.A.C. ROUGH 03/28/2008 Disapproved -FEE REQUIRED JLEVRAULT
Note: PLANS SHOW METAL DUCT - INSUL DUCT BOARD WAS USED INSTEAD. REMOVE OR PROVIDE A REVISION.
FRAMING 03/25/2008 APPROVED - AS NOTED JLEVRAULT
Note: INTERIOR WALL FRAMING.
2ND ROUGH ELECTRICAL 03/25/2008 PARTIALLY APPROVED LHITES
Note: HIGHLITED ON PLANS
MONOLITHIC SLAB INSPECTION/SLAB 03/24/2008 APPROVED - AS NOTED CMINI
Note: SLABS FOR DRIVE-THRU..
FOUNDATION SURVEY APPROVED BY ZONING 03/24/2008 APPROVED JGONZALEZ
SECOND ROUGH PLUMBING INSPECTION 03/20/2008 APPROVED PGALLMANN
Note: THIS IS A REINSPECTION
LATH /BRICK FLASHING 03/19/2008 APPROVED DROCKWELL
FOOTER 03/19/2008 APPROVED - AS NOTED DROCKWELL
Note: DUMPSTER SLAB AND ISLAND CURBING
LINTEL 03/19/2008 APPROVED DROCKWELL
Note: DUMPSTER LINTEL
SECOND ROUGH PLUMBING INSPECTION 03/18/2008 Disapproved -FEE REQUIRED PGALLMANN
Note: NOT READY. FLOOR DRAINS NOT SET, SEVERAL WALL AND FLOOR CLEANOUTS MISSING.
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 03/12/2008 Disapproved -FEE REQUIRED CMINI
Note: THIS IS A REINSPECTION NEED TO FILL IN LOW TIE BEAM ....NEED ATTACHMENT DETAIL FOR SOFFIT TO CMUS...NEED LETTER FOR USE OF 1X4 INSTEAD OF 2X4 ON 6` O.C. BRACING ON TRUSSES.... OK TO ROOF,ENGINEERING GOOD.. CHARLIE 931-1251
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 03/06/2008 CANCELLED BY APPLICANT JLEVRAULT
TEMPORARY POLE 03/05/2008 APPROVED LHITES
MONOLITHIC SLAB INSPECTION/SLAB 02/22/2008 APPROVED CMINI
STEM WALL FOUNDATION 02/22/2008 APPROVED - AS NOTED CMINI
Note: DUMPSTER PAD STEM WALL..
FOOTER 02/21/2008 APPROVED - AS NOTED JLEVRAULT
Note: FOR DUMPSTER DUMPSTER PAD.
LINTEL 02/21/2008 APPROVED - AS NOTED JLEVRAULT
Note: Contractor called to schedule this inspection for 2/21/08 LAST LIFT - CENTER WALL AND ABOVE TIE BEAMS - HILITED AND DATED ON JOB PLANS.
COLUMN INSPECTION 02/19/2008 PARTIALLY APPROVED JLEVRAULT
Note: requested by contractor COLUMNS AND TIE BEAMS APPROVED - HILITED AND DATED ON JOB PLANS.
LINTEL 02/19/2008 APPROVED - AS NOTED JLEVRAULT
Note: requested by contractor LAST LIFT, EXCEPT CENTER WALL AND ABOVE TIE BEAMS.
LINTEL 02/13/2008 APPROVED - AS NOTED DROCKWELL
Note: 2ND LIFT CALLED BY LEVI HUTCHINGS OK TO ADD PER JOE MC 2ND LIFT
FIRST ROUGH PLUMBING INSPECTION 02/13/2008 APPROVED JGIBSON
LINTEL 02/11/2008 APPROVED - AS NOTED DROCKWELL
Note: per Joe McGowen I was given permission to lower priority code 1ST LIFT O.K
TIE BEAM 02/06/2008 APPROVED DROCKWELL
FOOTER 02/04/2008 APPROVED JLEVRAULT
Note: THIS IS A REINSPECTION PER CONTRACTOR REQUEST
FOOTER 01/31/2008 Disapproved -FEE REQUIRED CMINI
Note: requested by contractor APPROVED PLAN DOES NOT MATCH WORK ON JOB NEED REVISION OR CORRECTION. CHARLIE 931-1251
ELECTRIC FEEDER 01/31/2008 APPROVED LHITES
Note: requested by contractor UNDERGROUND FEEDER TO TRANSFORMER

Review History

Department Status Date In Date Out
BLD COMPLETE 04/21/2008 04/21/2008
Note: Released By: FREODICA Revision Drive thru ceiling framing detail sheet.
BLD COMPLETE 04/07/2008 04/09/2008
Note: Released By: JMCGOWEN AS BUILT ELETRICAL DRAWINGS AMD EXTERIOR WALL FRAMING/INSULATION
ELEC COMPLETE 04/07/2008 04/09/2008
Note: Released By: JMCGOWEN as built and revision as per plan review comments.
ELEC HOLD 02/19/2008 02/19/2008
Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Revision to Permit #2007110218 (National City Bank @ 746 Belle Terre Pkwy) 2/19/2008 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. Sheet E-311 Power Riser Diagram: a. Both Notes 9 & 10 in Riser Notes on line and load side of 100A disconnect for Panel 'C' require four (4) conductors and an equipment ground. Only 3 conductors shown for both feeders. Review and revise. b. Provide physical location on Sheet E111 where 100A disconnect for Panel 'C' will be located. c. Comply with NEC 240.21 Tap Rules for Note 9 feeder. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us
BLD COMPLETE 02/18/2008 02/20/2008
Note: Released By: FREODICA Rev.- Architectural, structural, Mech & electrical. See listing. Note: All submitted electrical sheets are on hold.
BLD COMPLETE 01/18/2008 01/18/2008
Note: Released By: FREODICA
FI1 COMPLETE 12/20/2007 12/20/2007
Note: Released By: JPATTEE
BLD HOLD 11/14/2007 12/14/2007
Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Permit Application #2007110218 (746 Belle Terre Pkwy) 12/14/2007 The following items must be resolved in order to complete the Building Permit plan review. Architectural Comments: 1. Revise design codes to indicate 2004 Florida Building, Plumbing and Mechanical Code(s) with 2007 revisions and the 2005 National Electrical Code. 2. Revise cover sheet "New Building and Construction Data" Occupancy Classification to indicate Mixed (Separated). 3. Building Construction type is shown as Type II B Unprotected Non-sprinklered but numerous plan details indicate pre-engineered wood trusses with plywood decking (shown as ½" in detail and 5/8" in sheathing note on sheet S-103), which is not permitted, by code, for Type II B construction. Revise accordingly. 4. An Accessory Assembly Area (conference room 120) greater than 750 sq ft must be separated from other occupancies by at least 1 hour fire resistant construction per FBC, sections 302.1.1 and 302.2.1. 5. Provide detail(s) which indicate the method(s) of extending from the top of the wall to the roof deck, the rated walls (types 2 and 3), which enclose the conference room. 6. Provide labeled a door, door frame and the appropriate hardware for the door opening in the rated wall assembly between the conference room and corridor 123. 7. Provide separation of the exit doors, from conference room 120, equal to at least half the diagonal measurement of that space 8. Conference room 120 has a calculated occupant load of 55 persons (811 sq ft / 15 sq per person = 54.06). Given that there are two exits from the conference room, each exit would serve half of that occupant load, which would imply that the exit into the corridor (marked 123) would serve 28 persons from the conference room and that corridor would also serve 4 additional persons form office spaces 121 and 122 for a total of 32 persons. That being said, a corridor, in a non-sprinklered business occupancy, serving an occupant load greater than 30 must have a 1 hour fire resistance rating per FBC, Table 1016.1. Provide at least 1 hour fire resistant construction for the full length of the corridor marked 123 with equivalent protection for all openings in assemblies of rated construction. 9. Provide UL Listing Number and installation detail(s) for methods of protecting through penetrations of rated assemblies. 10. Provide signs or stencils, "FIRE AND SMOKE BARRIER PROTECT ALL OPENINGS", on walls of rated construction, above decorative ceilings and in other concealed spaces. 11. Provide maneuvering space(s) on the pull side of the rest room doors per FBC, Chapter 11, figure 25, as applicable. Mechanical Comment: 1. Sheet M101: Additional fire dampers would be required for all ducts penetrating fire rated walls as mentioned in Architectural Comment #8 above. Plumbing Comments: 1. Sheet P101: Water Floor Plan: a. The location of cold water line going into the building does not match with the location shown on site plan. Please revise plan and water riser to match each other. b. The cold water line entering the building has a note that indicates 1-1/2" CW up above ceiling but the water riser shows below grade on sheet P401. Please clarify. Electrical Comments: 1. Sheet E002: Pole Detail shows minimum windload of 110mph. Please revise to 120 mph minimum windload this area. 2. Sheet E311: Power Riser Diagram a. Note 2 Feeder from CT to Service Disconnect indicates a #1/0 ground. Please revise Riser to conform to NEC 250. b. Note 4 indicates #3 grounding electrode conductor. Revise grounding electrode conductor to comply with NEC Table 250.66. c. Optional Standby Generator: 1) Manual Transfer Switch cannot be placed on the load side of the panel it is serving. When Generator is running, this will create backfeeding of power through any closed ("on") circuit breakers. Please revise Power Riser. 2) Provide identification of circuit breakers and load calculations for all loads that Generator will be sustaining. 3) You may reference the 2008 NEC at www.nfpa.org/aboutthecodes/AboutTheCodes.asp?DocNum=70 for further clarification of the intent of NEC Art. 702.5 where it relates to Manual Transfer Switches and Optional Standby Generators. Larry Woodrome, CBO Building Official 386-986-3786
FI1 HOLD 12/05/2007
Note: Held By: JPATTEE 1) Unable to locate exit lighting on sheet E211.
BLD COMPLETE 03/26/2008
Note: Released By: JJOSEPH

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 05/21/2008
REVISION ¤40.00 04/21/2008
REINSPECTION FEE ¤40.00 04/09/2008
REINSPECTION FEE ¤40.00 04/09/2008
REVISION ¤60.00 04/09/2008
REVISION ¤40.00 03/28/2008
REINSPECTION FEE ¤40.00 03/18/2008
REINSPECTION FEE ¤40.00 03/18/2008
REVISION ¤80.00 02/21/2008
REINSPECTION FEE ¤40.00 02/01/2008
TRANSPORTATION IMPACT FEE ¤112,104.93 01/25/2008
ADMIN FEE ¤20.00 01/25/2008
BUILDING CODE ADMIN FUND ¤24.98 01/25/2008
ELECTRIC FEE ¤510.00 01/25/2008
FIRE COMM IMPACT FEE 4/1/07 ¤256.24 01/25/2008
FIRE PLANS REVIEW ¤49.95 01/25/2008
MECHANICAL FEE ¤510.00 01/25/2008
PERMIT FEE ¤4,400.00 01/25/2008
PLAN CHECK FEE ¤920.00 01/25/2008
PLUMBING FEE ¤510.00 01/25/2008
RADON FEE ¤24.98 01/25/2008
Fees Total Due: ¤0.00 Total Paid: ¤119,791.08