Permit #2007110380

Permit Details

Status: COED

Parcel Id: 07-11-31-7057-00370-0160
Total Square Footage: 0 sqft
Block: 00370
Subdivision: -
Job Phone: (386) 547-0409
Location Address: 99 UNIVERSAL TR
Type: RRI - RESIDENTIAL RE-ISSUE PERMIT
Issue Date: 02/18/2008
NOC: RECORDED
Applicant name: BOHDAN HAWRYLUK
Owner: INTERCOSTAL CONSTRUCTION CO.

Address

24 WHITTINGTON DRIVE

PALM COAST, FL 32164

Lot: 0160
Contracted Stated Job Value: ¤10,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

INTERCOASTAL CONSTRUCTION CO.
Status Location Address State License Number Phone Fax
INACTIVE

14 SLIPPER ORCHID TRAIL EAST

PALM COAST, FL 32164

CBC035048 (Exp: 08/31/2024) (386) 547-0409 386-673-8868

Sub Contractors

MICHAEL ALLEN PHILLIPS
Status Location Address State License Number Phone
CANCEL

14 LAMONT LANE

PALM COAST, FL 32137

CAC1814966 (Exp: 08/31/2010) (386)344-4515
RICHARD D LONGO
Status Location Address State License Number Phone
CANCEL

5 Needles Lane

Ormond Beach, FL 32174

RF0040520 (Exp: 08/31/2021) (386) 503-5502
BOHDAN HAWRYLUK
Status Location Address State License Number Phone Fax
INACTIVE

14 SLIPPER ORCHID TRAIL EAST

PALM COAST, FL 32164

CBC035048 (Exp: 08/31/2024) (386) 547-0409 386-673-8868
HAROLD C WINTZ
Status Location Address State License Number Phone
CANCEL

1721 Palm Road

Ormond Beach, FL 32174

EC13001342 (Exp: 08/31/2018) (386) 212-4786

Inspection History

Type Request Date Result Inspector
FINAL COMPLETE BUILDING INSPECTION 05/09/2011 FINAL APPROVED RMARVEL
Note: THIS IS A REINSPECTION Beau came in to schedule this inspection 5/9/11 (JB) APPROVED LANSCAPING
FINAL COMPLETE BUILDING INSPECTION 04/18/2011 Disapproved -FEE REQUIRED RMARVEL
Note: Inspection Resulted at 4/18/2011 3:12:32 PM CANNOT HAVE EXPOSED INCANDESCENT BULBS IN CLOSET. FIXTURES CANNOT BE HANGING FROM FIXTURE CORD.
STORMWATER FINAL INSPECTION 04/06/2011 APPROVED RMARVEL
Note: Bo called to schedule this inspection
UTILITY COMPANY FINAL 02/03/2011 APPROVED MBACON
Note: Bo called to schedule this inspection
PROJECT STATUS INSPECTION 08/24/2010 APPROVED - AS NOTED JHINDMAN
Note: THIS IS A REINSPECTION Inspection Resulted at 8/24/2010 12:05:27 PM THE HOUSE APPEARS TO BE 90% COMPLETE/NO LANDSCAPING OR SITE WORK/SITE APPEARS TO BE SAFE.
PROJECT STATUS INSPECTION 05/25/2010 Disapproved - NO FEE JHINDMAN
Note: Inspection Resulted at 5/25/2010 1:31:55 PM THE HOUSE APPEARS TO BE 90% COMPLETE/NO LANDSCAPING OR SITE WORK/SITE APPEARS TO BE SAFE.
RESIDENTIAL EARLY POWER 11/24/2009 APPROVED - AS NOTED CMINI
Note: requested by contractor Inspection Resulted at 11/24/2009 1:03:19 PM NEED TO ADD RECEPTACLE IN FRONT OF HOUSE...NEED TO PHASE OUT CONDUCTOR AT A/C CONDENSOR DISCONNECT....NEED ARCH. SHIELD AT RECEP. IN CABINET OVER STOVE.
PROJECT STATUS INSPECTION 05/13/2009 Disapproved - NO FEE JHINDMAN
Note: Inspection Resulted at 5/13/2009 1:41:59 PM THIS IS NOT A FINAL INSPECTION.HOUSE 90% COMPLETE/NO LANDSCAPING OR SITE WORK/SITE APPEARS TO BE SAFE.
PROJECT STATUS INSPECTION 01/14/2009 Disapproved - NO FEE DROCKWELL
Note: per request of Larry Woodrome Inspection Resulted at 1/14/2009 11:27:08 AM HOUSE 90% COMPLETE/NO LANDSCAPING OR SITE WORK/SITE APPEARS SAFE
DRIVEWAY 04/08/2008 Disapproved -FEE REQUIRED GLALIMA
Note: THIS IS A REINSPECTION Pipe not buried 50% in compacted soil\wk
DRIVEWAY 04/08/2008 APPROVED GLALIMA
Note: THIS IS A REINSPECTION Same day second inspection, re-inspect fee charged.\\wk
DRIVEWAY 04/07/2008 CANCELLED BY APPLICANT GLALIMA
Note: applicant wanted late afternoon inspection// unable to accomodate

Review History

Department Status Date In Date Out
ZON COMPLETE 04/04/2011 04/04/2011
Note: Released By: JMCGOWEN FINALS SURVEY
SW1 COMPLETE 04/01/2011 04/04/2011
Note: Released By: JMCGOWEN FINAL SURVEY
ZON COMPLETE 03/09/2011 03/09/2011
Note: Released By: JJOSEPH final survey
SW1 HOLD 03/09/2011 03/09/2011
Note: Held By: JJOSEPH 1.Flatwork is not allowed in the 5 foot utility easement. 2. Flooding or draining is allowed only from back yard to the front swale unless ditch or lake be located beyond propertiy line. final survey

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
EXTENSION ¤40.00 05/06/2011
EXTENSION ¤40.00 05/06/2011
EXTENSION ¤40.00 05/06/2011
EXTENSION ¤40.00 05/06/2011
EXTENSION ¤40.00 05/06/2011
EXTENSION ¤40.00 05/06/2011
REINSPECTION FEE ¤40.00 05/06/2011
CONTRACTOR CHANGE ¤40.00 02/12/2009
RENEW PERMIT FEES ¤40.00 01/13/2009
STORMWATER REINSPECTION FEE ¤35.00 01/13/2009
EXTENSION ¤40.00 01/13/2009
MECHANICAL FEE ¤36.00 02/18/2008
PERMIT FEE ¤40.00 02/18/2008
PLUMBING FEE ¤36.00 02/18/2008
ELECTRIC FEE ¤36.00 02/18/2008
ADDITIONAL FEE ¤240.00 02/18/2008
ADDITIONAL FEE ¤40.00 02/18/2008
ADDITIONAL FEE ¤40.00 02/18/2008
ADDITIONAL FEE ¤40.00 02/18/2008
ADMIN FEE ¤20.00 02/18/2008
Fees Total Due: ¤0.00 Total Paid: ¤963.00