I want to search for...

Permit #2007110401

Permit Details

Status: FINAL

Parcel Id: 20-10-30-0000-01020-0000
Block: 01020
Subdivision: 2125 - SAWMILL CREEK SUBDIVISION
Job Phone: (407)467-5271
Location Address: 55 SWEETBAY LN
Type: EL - ELECTRICAL
Issue Date: 01/22/2008
NOC: Unknown
Applicant name: MICHAEL MCRAE DEESE
Owner: PALM COAST FOREST LLC

Address

SUITE 3A

PALM COAST, FL 32137

Address

1 CORPORATE DRIVE

PALM COAST, FL 32137

Lot: 0000
Contracted Stated Job Value: ¤2,350.00
Job Description: INSTALL RACK DISCONNECTS, METER CAN, CONTROL PANEL & WIRE PUMPS - WELLFIELDS # SW-124
Type: CN

Contractor

ALL FLORIDA POWER SYSTEMS INC.
Status Location Address State License Number Phone Fax
CANCEL

734 PATE ROGERS ROAD

POMPANO BEACH, FL 33060

EC0001688 (Exp: 09/30/2008) (407)467-5271 (386)774-9687

Inspection History

Type Request Date Result Inspector
UNDERGROUND ELECTRICAL 04/09/2008 APPROVED LHITES
ELECTRICAL FINAL 04/09/2008 FINAL APPROVED LHITES

Review History

Department Status Date In Date Out
BLD COMPLETE 01/17/2008 01/17/2008
Note: Released By: SKNOPF Approved for Release
BLD HOLD 01/14/2008 01/15/2008
Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Resubmission of Permit Application #2007110401 (Electrical for Wellfield SW#24 @ 55 Sweetbay Ln) 1/15/2008 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. Sheet E04: a. A Neutral is required on the primary side of a transformer if the secondary side requires a neutral. Both the 15KVA MPZ transformer and the 3KVA transformer in WPCP show voltage transforming to 120/240V 1Ph. Revise the following feeders to include a neutral: Disconnect to MTS, MTS to WPCP, WPCP to MPZ transformer, and WPCP to 3KVA transformer. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us
BLD HOLD 11/28/2007 12/04/2007
Note: Held By: SKNOPF Electrical Comments: 1. Sheet E-04: a. Provide bonding per NEC 250. b. Clarify equipment grounding conductor for feeder from SE-rated Disconnect to Transfer Switch. c. Please include 3KVA transformer load in load calculations. d. Provide generator receptacle information, ie; voltage, amperage, #poles, #wires. 2. Sheet E-21: Electrical Equipment Service Rack - Provide grounding electrode requirements, ie; quantity, diameter and length per NEC. 3. Sheet E-23: a. Revise circuit L1-6 to include 180VA for each receptacle on each pole. Revise load calculations. 4. Sheet E-24: a. Detail 1 - Provide size of copper grounding conductor for gate or fence post grounding. b. Detail 2 - Provide grounding requirements for aluminum light poles per NEC. c. Detail 3 - Provide size of copper grounding conductor for RTU Antenna & Mast Installation. 5. 8-1/2" x 11" attached Riser a. Attached Riser does not match Single Line Diagram Sheet E-04 for sequence of feeders and grounding requirements. Please coordinate these drawings. b. Riser this sheet has power source entering Service disconnect before Meter. Power source must pass thru Meter first. c. Riser this sheet shows Service ground developed at the Meter. Meter enclosure can be bonded, but Service ground is developed at the first means of disconnect, which would be the Service Disconnect. Please revise.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ELECTRIC FEE ¤31.41 01/22/2008
Fees Total Due: ¤0.00 Total Paid: ¤31.41