Permit #2007110403
Permit Details
Status: FINAL
| Parcel Id: 29-10-30-0000-01010-0000 |
| Subdivision: - |
| Job Phone: (407)467-5271 |
| Location Address: 10661 US HIGHWAY 1 |
| Type: EL - ELECTRICAL |
| Issue Date: 01/22/2008 |
| NOC: Unknown |
| Applicant name: MICHAEL MCRAE DEESE |
| Owner: PALM COAST HOLDINGS INC |
|
Address 1 CORPORATE DRIVE PALM COAST, FL 32164 |
| Contracted Stated Job Value: ¤2,350.00 |
| Job Description: INSTALL RACK DISCONNECTS, METER CAN, CONTROL PANEL & WIRE PUMPS - WELLFIELDS # SW-122 |
| Type: CN |
Contractor
ALL FLORIDA POWER SYSTEMS INC.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
734 PATE ROGERS ROAD POMPANO BEACH, FL 33060 |
EC0001688 (Exp: 09/30/2008) | (407)467-5271 | (386)774-9687 |
Inspection History
| Type | Request Date | Result | Inspector |
| UNDERGROUND ELECTRICAL | 04/08/2008 | APPROVED | LHITES |
| ELECTRICAL FINAL | 04/08/2008 | FINAL APPROVED | LHITES |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 01/17/2008 | 01/17/2008 |
| Note: Released By: SKNOPF Approved for Release. | |||
| BLD | HOLD | 01/14/2008 | 01/15/2008 |
| Note: Held By: SKNOPF CITY OF PALM COAST BUILDING DIVISION Comments on Resubmission of Permit Application #2007110403 (Electrical Installation of Wellfield #SW122 @ 10661 N US Hwy 1) 1/15/2008 The following items must be resolved in order to complete the Building Permit plan review. Electrical Comments: 1. Sheet E04: a. A Neutral is required on the primary side of a transformer if the secondary side requires a neutral. Both the 15KVA MPZ transformer and the 3KVA transformer in WPCP show voltage transforming to 120/240V 1Ph. Revise the following feeders to include a neutral: Disconnect to MTS, MTS to WPCP, WPCP to MPZ transformer, and WPCP to 3KVA transformer. …………………………………………… Susan J. Knopf Plans Examiner City of Palm Coast - Building Division 2 Commerce Boulevard Palm Coast, Florida 32164-3216 [tel]: (386) 986-2463 [fax]: (386) 986-3781 [email]: sknopf@ci.palm-coast.fl.us | |||
| BLD | HOLD | 11/28/2007 | 12/04/2007 |
| Note: Held By: SKNOPF Electrical Comments: 1. Sheet E-04: a. Provide bonding per NEC 250. b. Clarify equipment grounding conductor for feeder from SE-rated Disconnect to Transfer Switch. c. Please include 3KVA transformer load in load calculations. d. Provide generator receptacle information, ie; voltage, amperage, #poles, #wires. 2. Sheet E-21: Electrical Equipment Service Rack - Provide grounding electrode requirements, ie; quantity, diameter and length per NEC. 3. Sheet E-23: a. Revise circuit L1-6 to include 180VA for each receptacle on each pole. Revise load calculations. 4. Sheet E-24: a. Detail 1 - Provide size of copper grounding conductor for gate or fence post grounding. b. Detail 2 - Provide grounding requirements for aluminum light poles per NEC. c. Detail 3 - Provide size of copper grounding conductor for RTU Antenna & Mast Installation. 5. 8-1/2" x 11" attached Riser a. Attached Riser does not match Single Line Diagram Sheet E-04 for sequence of feeders and grounding requirements. Please coordinate these drawings. b. Riser this sheet has power source entering Service disconnect before Meter. Power source must pass thru Meter first. Riser this sheet shows Service ground developed at the Meter. Meter enclosure can be bonded, but Service ground is developed at the first means of disconnect, which would be the Service Disconnect. Please revise. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ELECTRIC FEE | ¤31.41 | 01/22/2008 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤31.41 |