I want to search for...
Permit #2007120230
Permit Details
Status: COED
| Parcel Id: 07-11-31-7013-00220-0030 |
| CONDITIONED SPACE: 3403 sqft |
| GARAGE: 659 sqft |
| OPENED PORCH (WITH ROOF) : 380 sqft |
| OPENED PORCH (WITH ROOF) : 52 sqft |
| Total Square Footage: 4494 sqft |
| Block: 00220 |
| Subdivision: - |
| Job Phone: (386)851-7940 |
| Location Address: 143 BROOKSIDE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/08/2008 |
| NOC: RECORDED |
| Applicant name: LISA MARIE STEINER |
| Owner: MERCEDES HOMES INC |
|
Address 775 HARLEY STRICKLAND BLVD ORANGE CITY, 3FL 32763 |
|
Address STE 110 ORANGE CITY, 3FL 32763 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤318,690.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MERCEDES HOMES INC.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
12001 SCIENCE DRIVE #160 ORLANDO, FL 32826 |
CGC1510145 (Exp: 08/31/2012) | (407)272-5591 | (407)282-1563 |
Sub Contractors
STEVEN JAY SMITH
| Status | Location Address | State License Number | Phone |
| INACTIVE |
104 West Cedar Avenue Orange City, FL 32763 |
EC0001542 (Exp: 08/31/2022) | (386)775-7776 |
EDDIE T PALMATEER
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
2985 ENTERPRISE ROAD DEBARY, FL 32713 |
SUITE A DEBARY, FL 32713 |
CAC1813533 (Exp: 08/31/2024) | (386)668-8651 | (386)668-7758 |
DAVID RAYMOND BARSANO
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
600 S. VOLUSIA AVENUE ORANGE CITY, FL 32763 |
CFC055682 (Exp: 08/31/2012) | (386)774-8080 | (386)774-8189 |
LISA MARIE STEINER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
12001 SCIENCE DRIVE #160 ORLANDO, FL 32826 |
CGC1510145 (Exp: 08/31/2012) | (407)272-5591 | (407)282-1563 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 06/02/2008 | FINAL APPROVED | ACOOPER |
| Note: THIS IS A REINSPECTION | |||
| FINAL COMPLETE BUILDING INSPECTION | 05/30/2008 | Disapproved -FEE REQUIRED | ACOOPER |
| Note: NEED REGULAR TOGGLE SWITCH LABELED ON/OFF TO BE PUT IN FOR THE GARBAGE DISPOSAL. ONE OF THE TWO ISLAND RECEPTICLES IS INOP. ART 931 3958 | |||
| STORMWATER FINAL INSPECTION | 05/29/2008 | APPROVED | DRANDALL |
| Note: THIS IS A REINSPECTION | |||
| STORMWATER FINAL INSPECTION | 05/23/2008 | Disapproved -FEE REQUIRED | DRANDALL |
| Note: Place sod in swale across the street (grade out dumpster marks first) seed and straw exposed earth on adjacent rear property and around meter box remove all trash on rear adjacent property...see pink paint | |||
| UTILITY COMPANY FINAL | 05/20/2008 | APPROVED | MBACON |
| RESIDENTIAL EARLY POWER | 04/22/2008 | APPROVED | RMARVEL |
| PRE DRIVEWAY | 04/07/2008 | CANCELLED BY APPLICANT | LAPTEKAR |
| Note: per John | |||
| PRE DRIVEWAY | 04/07/2008 | APPROVED | DRANDALL |
| Note: THIS IS A REINSPECTION revised for pavers | |||
| LATH /BRICK FLASHING | 03/14/2008 | APPROVED | CMINI |
| INSULATION INSPECTION | 03/13/2008 | APPROVED | JLEVRAULT |
| ALL ROUGH | 03/10/2008 | APPROVED | JLEVRAULT |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 02/28/2008 | APPROVED - AS NOTED | CMINI |
| Note: SUPPORT HEADER IN FRONT ENTRY.BOLT DOWN WALL ON TRUSS FG2. | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 02/25/2008 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS WAS A PARTIAL EXTERIOR SHEATHING FOR BONUS ROOM ONLY.........MARK | |||
| LINTEL | 02/18/2008 | APPROVED | ACOOPER |
| FOUNDATION SURVEY APPROVED BY STORMWATER | 02/14/2008 | APPROVED | WKINELL |
| FOUNDATION SURVEY APPROVED BY ZONING | 02/14/2008 | APPROVED | ECOYNE |
| MONOLITHIC SLAB INSPECTION/SLAB | 02/01/2008 | APPROVED | JLEVRAULT |
| FIRST ROUGH PLUMBING INSPECTION | 01/30/2008 | APPROVED | JLEVRAULT |
| TEMPORARY POLE | 01/29/2008 | APPROVED | RMARVEL |
| Note: NEUTRAL CONDUCTOR NEEDS TO BE HOOKED UP. NOT COMPLETE. FINISH DRIVING GROUND ROD INTO EARTH. |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 04/07/2008 | 04/07/2008 |
| Note: Released By: LAPTEKAR Revised driveways to add pavers | |||
| SW1 | COMPLETE | 03/19/2008 | 03/19/2008 |
| Note: Released By: LAPTEKAR received revised topo survey | |||
| SW1 | COMPLETE | 01/28/2008 | 01/29/2008 |
| Note: Released By: LAPTEKAR moved house to the left and added a circular driveway | |||
| ZON | COMPLETE | 01/24/2008 | 01/28/2008 |
| Note: Released By: ECOYNE | |||
| BLD | COMPLETE | 12/19/2007 | 12/26/2007 |
| Note: Released By: FREODICA Reviewed by Auba | |||
| SW1 | COMPLETE | 12/18/2007 | 12/19/2007 |
| Note: Released By: WKINELL | |||
| ZON | COMPLETE | 12/18/2007 | 12/19/2007 |
| Note: Released By: ECOYNE | |||
| SW1 | HOLD | 03/03/2008 | |
| Note: Held By: EBLACKER We cannot complete the swale plan for this property due to a datum elevation discrepancy on the submitted topographic survey. We check these topographic surveys against the City's as-built drawings, corrected to the NAVD of 1988. The elevations are higher than expected by 1.92ft. Please submit three revised signed sealed topographic surveys for this property, showing corrected elevations, to a Permit Technician at the Engineering & Stormwater Department. If we can be of help regarding this issue please call (386) 986-4760. NOTE: When topographic survey elevations are changed, all documents that replicate those elevations must also be revised. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | ¤40.00 | 06/03/2008 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 06/03/2008 |
| SW REVISION | ¤40.00 | 06/03/2008 |
| SW REVISION | ¤40.00 | 06/03/2008 |
| REINSPECTION FEE | ¤40.00 | 06/03/2008 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 01/08/2008 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/08/2008 |
| TRANS IMPACT FEE 6 - RESIDENTI | ¤3,841.11 | 01/08/2008 |
| ADMIN FEE | ¤20.00 | 01/08/2008 |
| ARC HOUSE REVIEW | ¤125.00 | 01/08/2008 |
| BUILDING CODE ADMIN FUND | ¤22.47 | 01/08/2008 |
| ELECTRIC FEE | ¤246.60 | 01/08/2008 |
| FIRE IMPACT FEE RES 4/1/07 | ¤185.11 | 01/08/2008 |
| MECHANICAL FEE | ¤246.60 | 01/08/2008 |
| PERMIT FEE | ¤1,407.90 | 01/08/2008 |
| PARKS IMPACT FEE 4/1/07 | ¤1,196.11 | 01/08/2008 |
| PLAN CHECK FEE | ¤144.40 | 01/08/2008 |
| PLUMBING FEE | ¤246.60 | 01/08/2008 |
| RADON FEE | ¤22.47 | 01/08/2008 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤11,579.37 |