Permit #2008040040
Permit Details
Status: FINAL
| ENCLOSE EXISTING PORCH TO LIVING : 150 sqft |
| Total Square Footage: 200 sqft |
| Subdivision: - |
| Job Phone: (904)268-7390 |
| Location Address: 64 RAINTREE CIR |
| Type: BA - BUILDING ADDITION |
| Issue Date: 04/22/2008 |
| NOC: RECORDED |
| Applicant name: ROBERT JOHN BLANDFORD |
| Owner: BRADING, LESLIE J |
|
Address 64 RAINTREE CIRCLE PALM COAST, FL 32164 |
| Lot: 2 |
| Contracted Stated Job Value: ¤20,766.00 |
| Job Description: ENCLOSE LANAI W/GLASS & EXTEND ROOM 120 SQ FT W/ ROOF & SLAB |
| Type: CN |
Contractor
SUNSATIONAL SUNROOMS OF AMERICA
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
6825 PHILIPS INDUSTRIAL BLVD JACKSONVILLE, FL 32256 |
CBC1254558 (Exp: 08/31/2010) | (904)268-7390 | (904)268-4211 |
Sub Contractors
JOSEPH W SULLIVAN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1556 WHITLOCK AVE. JACKSONVILLE, FL 32211 |
EC0001076 (Exp: 08/31/2026) | (904)744-5050 | (904)745-0400 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL INSPECTION (MISC) | 10/10/2008 | FINAL APPROVED | JHINDMAN |
| STORMWATER FINAL INSPECTION | 09/29/2008 | APPROVED | GLALIMA |
| Note: THIS IS A REINSPECTION | |||
| UTILITY COMPANY FINAL | 09/24/2008 | APPROVED | MBACON |
| STORMWATER FINAL INSPECTION | 09/23/2008 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: 9/12/08 anonymous call please check for construction debris from job left in vacant lot nest door at #62 | |||
| ALL ROUGH | 09/22/2008 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 07/02/2008 | Disapproved -FEE REQUIRED | MMOORE |
| Note: THIS IS A REINSPECTION 1. UPPER GLASS NOT INSTALLED 2. WATER SOAKED DRYWALL 3. MOLD IS GROWING 4. PLAN DOES NOT INDICATE THE USE OF DRYWALL AT EXTERIOR WINDOWS 5. PLAN INDICATES A SOLID PANEL 6. OUTSIDE ELECTRICAL DISCONNECT NOT ROUGED-IN 7. REMOVE PINE TRIM FROM COLUMN FOR COLUMN INSPECTION / CANNOT SEE ATTACHMENT AT TOP | |||
| ALL ROUGH | 06/25/2008 | Disapproved -FEE REQUIRED | PGALLMANN |
| Note: requested by contractor 1) PROTECT ELECTRICAL ROMEX CABLE WHERE IT PENETRATES METAL HOLES IN TRACKS (WALL & CEILING). 2) STRAP/FASTEN ROMEX CABLE PER CODE. 3) BOXES MUST BE SET (QUANTITY/LOCATIONS PER CODE), WITH WIRES RUNNING THROUGH, FOR "ALL ROUGH" INSPECTION. NOTE: AN EXTERIOR GFCI RECERTACLE MUST BE PROVIDED AS THE EXISTING ONE IS NOW INSIDE. 4) VALLEY FLASHINGS MUST BE INSTALLED, FOR "ALL ROUGH" INSPECTION. ALSO ROOF MUST BE DRIED IN/FREE OF LEAKS. 5) PROVIDE CEILING INSULATION CERTIFICATE FROM INSTALLER, OR PROVIDE ACCESS HOLE FOR INSPECTOR TO INSPECT. 6) REMOVE AND REPLACE ANY WATER AND/OR BLACK MOLD DAMAGED SHEET ROCK. 7) VERIFY NO MOLD EXISTS ON FRAMING LUMBER AND ROOF SHEATHING ABOVE DAMAGED AREAS. A THIRD PARTY CERTIFIED INSPECTOR CAN SUBMIT A REPORT, OR PROVIDE ROOM FOR CITY INSPECTOR TO INSPECT. | |||
| FOUNDATION SURVEY APPROVED BY ZONING | 06/24/2008 | APPROVED | BBARTON |
| MONOLITHIC SLAB INSPECTION/SLAB | 06/03/2008 | APPROVED | MMOORE |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 05/29/2008 | Disapproved -FEE REQUIRED | MMOORE |
| Note: THIS IS A REINSPECTION 1. FOOTER REBAR NOT COMPLETED/ EPOXY INTO CONCRETE 2. SLAB EXTENSION (5`), NOT PER PLAN . 1 SLAB DOWEL MISSING | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 05/22/2008 | Disapproved -FEE REQUIRED | ACOOPER |
| Note: NEED ENGINEERING ON REMOVED COLUMN AND REPLACEMENT ALSO NEED INFO ON FOOTER AND USE OF EXISTING EXIT SLAB LEFT IN THE POUR. |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 06/16/2008 | 06/16/2008 |
| Note: Released By: JMCGOWEN Revision Overframing for sun room | |||
| BLD | HOLD | 06/03/2008 | 06/04/2008 |
| Note: Held By: JJOSEPH Provide a Truss plan and roof Framing (sign and sealed drawing) | |||
| BLD | COMPLETE | 05/27/2008 | 05/23/2008 |
| Note: Released By: JMCGOWEN revision - concrete block | |||
| BLD | COMPLETE | 04/11/2008 | 04/11/2008 |
| Note: Released By: JMCGOWEN | |||
| SW1 | COMPLETE | 04/09/2008 | 04/10/2008 |
| Note: Released By: LAPTEKAR Released By: LAPTEKAR | |||
| ZON | COMPLETE | 04/09/2008 | 04/09/2008 |
| Note: Released By: ECOYNE | |||
| ZON | HOLD | 04/03/2008 | 04/03/2008 |
| Note: Held By: ECOYNE room to be expanded does not show on original sfr plans. permit must be for entire room and need rear & side setback info. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 10/02/2008 |
| REINSPECTION FEE | ¤40.00 | 10/02/2008 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 10/02/2008 |
| REINSPECTION FEE | ¤40.00 | 06/17/2008 |
| REVISION | ¤40.00 | 06/17/2008 |
| REVISION | ¤40.00 | 05/27/2008 |
| REINSPECTION FEE | ¤40.00 | 05/27/2008 |
| STORM WATER PERMIT FEES | ¤80.00 | 04/22/2008 |
| ADMIN FEE | ¤20.00 | 04/22/2008 |
| BUILDING CODE ADMIN FUND | ¤1.00 | 04/22/2008 |
| ELECTRIC FEE | ¤42.60 | 04/22/2008 |
| MECHANICAL FEE | ¤42.60 | 04/22/2008 |
| PERMIT FEE | ¤126.00 | 04/22/2008 |
| PLAN CHECK FEE | ¤40.00 | 04/22/2008 |
| RADON FEE | ¤1.00 | 04/22/2008 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤628.20 |